Published August 25, 2020 | Version v1
Report Open

Evaluation and experiences of full-scale ozonation followed by MBBR post-treatment and comparison with previous pilot tests. CWPharma project report for GoA3.1: Pharmaceutical removal at full scale

  • 1. Tekniska verken i Linköping AB (TVAB)
  • 1. Berlin Centre of Competence for Water (KWB)
  • 2. Aarhus University
  • 3. German Environment Agency
  • 4. Institute of Environmental Protection – National Research Institute (IOS)
  • 5. Latvian Institute of Aquatic Ecology (LIAE)

Description

Evaluation and experiences of full-scale ozonation followed by MBBR post-treatment and comparison with previous pilot tests.

GoA3.1: Pharmaceutical removal at full scale

Project report of the CWPharma project (Clear waters from pharmaceuticals) funded by EU’s Interreg Baltic Sea Region Programme

Files

CWPharma_GoA3_1_Report_publ.pdf

Files (2.6 MB)

Name Size Download all
md5:d6be1a7b6af9fe59bc0b22ec5c42cd5e
2.6 MB Preview Download