Optimal short-term Scheduling of Industrial Packing Facilities
Authors/Creators
- 1. Aristotle University of Thessaloniki
- 2. Procter & Gamble
- 3. Centre for Research and Technology Hellas
Description
The simultaneous lot-sizing and production scheduling problem of a real-life large-scale industrial facility of packaged consumer goods is considered in this work. The problem under consideration is mainly focused on the packing stage which constitutes the major production bottleneck. Several packing lines, illustrating different design and operational characteristics, operate continuously in parallel. An efficient solution strategy is implemented to handle the high computational cost. Α Mixed-Integer Linear Programming model (MILP) is used in parallel with a decomposition-based algorithm. Appropriate constraints, referring to the production/formulation stage of the plant, are also imposed in order to ensure the generation of feasible production schedules. The model relies on tight timing and sequencing constraints, as well as products’ allocation constraints. The main objective is the minimization of the makespan. A number of different case studies have been considered and detailed optimal production schedules have been generated for over 130 products scheduled weekly. The obtained results lead to nearly-optimal scheduling solutions in reasonable computation times. The proposed model can assist decision makers towards rigorous scheduling plans in a dynamic production environment under realistic uncertainty.