Initial Data Management Plan (Deliverable 4.5)
- 1. The University of Birmingham
- 2. Edelweiss Connect GmbH
- 3. The Federal Institute for Materials Research and Testing (BAM)
- 4. TOFWERK AG
Description
This report describes the initial version of the data management plan (DMP) for the ACEnano collaborative research project. The current DMP covers the general aspects of the ACEnano data management approaches, based on the FAIR guidelines. More specific and clearly-defined measures will be added in parallel to the integration of methods, their data output specifications, their Standard Operating Procedures (SOPs) and specific data sources into the knowledge warehouse, which will follow the time plan enforced by the case study requirements on data availability.
Files
D4.5 Initial Data Management Plan.pdf
Files
(706.3 kB)
Name | Size | Download all |
---|---|---|
md5:5edb23c965abc25a7c10df443d36178b
|
706.3 kB | Preview Download |