Published May 31, 2019
| Version 3.0
Project deliverable
Open
5GCity Virtualization Infrastructure Interim Release (D3.2)
Creators
- 1. Virtual Open Systems
- 2. Nextworks
- 3. Accelleran
- 4. i2CAT Foundation
- 5. University of Bristol
- 6. NEC
- 7. Ubiwhere
- 8. Betevé TV
Description
This deliverable presents the interim release of the implementation of the MEC node for resource-constrained devices, and network virtualization. It will include the release of the VNFs.
Files
D3.2 5GCity Virtualization Infrastructure Interim Release.pdf
Files
(1.6 MB)
Name | Size | Download all |
---|---|---|
md5:d291270158b39b3fdccdff7747d2b345
|
1.6 MB | Preview Download |