This data set includes the GICs measurements at the Huangmeishan 220 kV substation during three stroms. The storms took place during 17-18 March 2015, 14-15 December 2015 and 6-8 March 2016, respectively. The time resolution of the data is 1 minute.

Files

20150317-18_Fujian,Huangmeishan,220kV Substation_GIC.txt

Files (424.1 kB)

Name Size
md5:160346d0fc4693f61ebee42d63041646
128.5 kB Preview Download
md5:8e7478f904f196ab9e3009f2c90753ef
118.4 kB Preview Download
md5:62ff33ba898568468a6fffce1d501079
177.1 kB Preview Download