ENERIT module outcomes for the 3 pilot sites on which the module has been deployed during the HIT2GAP project
Description
This dataset consists of data generated by the ENERIT module (Energy Management module) during its running on three pilot sites of the HIT2GAP project (Challenger (France), Nanogune (Spain), Wilanow (Poland)).
Each dataset consists of 3 subsets:
- Monthly Energy Consumption Data collected from Jan 2016 to August 2019 (42 Months)
- Yearly Significant Energy Uses identified at the sites
- Yearly Improvement Opportunities identified for each site
Metadata Description:
1. Monthly Energy Consumption:
Type (Fuel type)
Location (Building reference)
Meter (Meter title)
From (Start date for reading)
To (End date for reading)
Cost (€)
Energy (kWh)
Primary energy (kWh)
CO2 (kgCO2)
2. Yearly Significant Energy Uses
Name
Location (Building reference)
Year
Significant Energy Use (is this Energy Use considered Significant)
Energy Flow Entry (Should it appear in the Energy Flow diagram)
Details
Objectives (Description of what is planned to save energy for this Energy Use)
Target (Target saving - text)
Elec Target (Target – numeric)
Therm Target (Target – numeric)
Annual Elect Energy
Annual Elec Cost
Annual Elec CO2
Annual Therm Energy
Annual Therm Cost
Annual Therm CO2
Water Quantity
Water Cost
Linked Elect Meters (Meter descriptions that data is automatically populated from)
Linked Therm Meters (Meter descriptions that data is automatically populated from)
3. Yearly Improvement Opportunities
Reference: Identifier
Title:
Location (Building reference)
Year
Type (Type of improvement Opportunity)
Category
Sub-Category
Significant Energy Use (Energy use that this Improvement Opportunity was assigned against)
Details
Requestor (user who raised the IO)
Energy Manager (Site Energy Manager)
Est. Elec. Energy (kWh)
Est. Elec. Cost (€)
Est. Elec. CO2 (kgCO2)
Est. Therm. Energy (kWh)
Est. Therm. Cost (€)
Est. Therm. CO2 (kgCO2)
Actual Elec. Energy
Actual Elec. Cost
Actual Elec. CO2
Actual Therm. Energy
Actual Therm. Cost
Actual Therm. CO2
Comments
Co-Benefit Details
Capital Cost (€)
Estimated Payback (Years)
Payback (Years)
Unit (Energy)
Unit (Currency)
Unit (CO2)
Status
Complexity
EHS
Energy Use
Maintenance
Verification Method
Notes for Assignee
Currently With (Person currently responsible for IO)