Project deliverable Open Access
Ole Grøndalen; Michael Dieudonné; Lars Mikkelsen; Sonia Fernández Tejería; Mohammad Othman; Haitao Shi; Andrea F. Cattoni; Ahmed Elmokashfi
WP4 is focused on ensuring that the 5G-VINNI facility delivered by the project is verified with a
uniform testing procedure, allowing the Mobile Network Operators that are part of the consortium
to have confidence in the system. The focus of WP4 is on testing methodology, test execution and
E2E network validation to verify that KPIs across different verticals are met. The WP is intended to
provide all the needed testing and validation tools and support across the project, as well as
providing the support needed by vertical projects hosted by the 5G-VINNI facility. This document is
structured as a report on the different activities of the Tasks T4.1 and T4.2 carried out during the first
Period, while the Annexes represent the initial structure of a live document that will become, at the
end of the project, with D4.4 the official Test Specification handbook of the 5G-VINNI project.
Name | Size | |
---|---|---|
D4.1-Initial report on test-plan creation and methodology, and.pdf
md5:f4b6ebe4bd3ee642bc9c362cfac1f286 |
5.3 MB | Download |
All versions | This version | |
---|---|---|
Views | 438 | 438 |
Downloads | 1,008 | 1,008 |
Data volume | 5.4 GB | 5.4 GB |
Unique views | 407 | 407 |
Unique downloads | 893 | 893 |