Published November 12, 2013 | Version v1

D3.8 - ULOOP Framework Design and Implementation Report

Authors/Creators

  • 1. COPELABS/ULHT

Description

This document represents deliverable D3.8 of the EU FP7 IST project ULOOP (User-centric Wireless
Local Loop, grant Number 257418). It is a follow-up of deliverables D2.3, D3, and D3.a. The latter
two deliverables were confidential, and so D3.8 provides to the general public a global perspective of
results derived from the work developed in Work Package 3, namely, final specification aspects,
conceptual work as well as implementation choices. It also includes pointers to the validation of each
of the pieces described.

Files

D3_8_ULOOP-PSC-clean.pdf

Files (2.0 MB)

Name Size
md5:3253e853e3bceae313d558f1b1895970
2.0 MB Preview Download