Planned intervention: On Thursday March 28th 07:00 UTC Zenodo will be unavailable for up to 5 minutes to perform a database upgrade.
Published July 4, 2019 | Version v1
Conference paper Open

Validating Coordination Schemes between Transmission and Distribution System Operators using a Laboratory-Based Approach

Description

The secure operation of future power systems will rely on better coordination between transmission system and distribution system operators. Increasing integration of renewables throughout the whole system is challenging the traditional operation. To tackle this problem, the SmartNet project proposes and evaluates five different coordination schemes between system operators using three benchmark scenarios from Denmark, Italy, and Spain. In the project, field tests in each of the benchmark countries are complemented with a number of laboratory validation tests, to cover scenarios that cannot be tested in field trials. This paper presents the outcome of these laboratory tests. Three tests are shown, focusing on controller validation, analysis of communication impacts, and how well price-based controls can integrate with the SmartNet coordination schemes. The results demonstrate important indications for the field tests and also show some of the limitations with the current implementations of the coordinations schemes.

Files

smartnet_lab_tests.pdf

Files (783.3 kB)

Name Size Download all
md5:03258e2640d315fcda2aaa93ba277b7e
783.3 kB Preview Download