Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published February 15, 2019 | Version v1
Project deliverable Open

D2.11 CEMCAP Strategic conclusions – progressing CO2 capture from cement towards demonstration

Description

The objective of the 42-month Horizon2020 project CEMCAP (Budget ~10 MEUR) has been to prepare the ground for large-scale implementation of CO2 capture in the European cement industry. CEMCAP has tested and analyzed five different CO2 capture technologies for cement production and performed techno-economic and retrofitability analyses. The investigated technologies are ready for or already progressing towards demonstration beyond CEMCAP. CEMCAP has thus created technology pathways for future large-scale CCS implementation in the cement industry, but these pathways need support by an appropriate political framework, business models, a reliable CO2 transport and storage infrastructure and public acceptance for CCS.

Notes

This work was supported by the Swiss State Secretariat for Education, Research and Innovation (SERI) under contract number 15.0160

Files

D2 11 CEMCAP Strategic conclusions_final.pdf

Files (2.5 MB)

Name Size Download all
md5:a700c78eddba12034713cec262db4cc9
2.5 MB Preview Download

Additional details

Funding

CEMCAP – CO2 capture from cement production 641185
European Commission