D2.11 CEMCAP Strategic conclusions – progressing CO2 capture from cement towards demonstration
Creators
- 1. SINTEF Energy Research
- 2. CSIC
- 3. Italcementi
- 4. ECRA/VDZ
- 5. IFK, USTUTT
- 6. TNO
- 7. VDZ
- 8. ETHZ
- 9. HeidelbergCement
Description
The objective of the 42-month Horizon2020 project CEMCAP (Budget ~10 MEUR) has been to prepare the ground for large-scale implementation of CO2 capture in the European cement industry. CEMCAP has tested and analyzed five different CO2 capture technologies for cement production and performed techno-economic and retrofitability analyses. The investigated technologies are ready for or already progressing towards demonstration beyond CEMCAP. CEMCAP has thus created technology pathways for future large-scale CCS implementation in the cement industry, but these pathways need support by an appropriate political framework, business models, a reliable CO2 transport and storage infrastructure and public acceptance for CCS.
Notes
Files
D2 11 CEMCAP Strategic conclusions_final.pdf
Files
(2.5 MB)
Name | Size | Download all |
---|---|---|
md5:a700c78eddba12034713cec262db4cc9
|
2.5 MB | Preview Download |