Published June 18, 2018 | Version v1
Presentation Open

Special #Session: 5G-PPP Phase 3 introduction & ICT-19-2018 info-session 5G-VINNI (5G Verticals INNovation Infrastructure)

  • 1. Telenor

Description

5G-VINNI (5G Verticals INNovation Infrastructure) is a project accepted for grant in ICT-17 to

  • Build an open large scale 5G End-to-End facility that can
  • demonstrate that key 5G network KPIs can be met KPIs (capacity, ubiquity, speed, latency, reliability, density of users, location accuracy,energy efficiency, service creation time, network management capex/opex)
  • be validated, accessed and used by vertical industries (e.g. in ICT-19projects) to test use cases and validate 5G KPIs.

Files

5G-VINNI_EuCNC_GronsundPal_20180619_.pdf

Files (1.3 MB)

Name Size Download all
md5:93c0c532d19c09602e3399c626d394b6
1.3 MB Preview Download

Additional details

Funding

5G-VINNI – 5G Verticals INNovation Infrastructure 815279
European Commission