There is a newer version of this record available.

Dataset Open Access

Large scale experiments for an alternative erosion control measure using sand-filled geosystems. Data set produced at the CIEM flume, Hydralab+

Cáceres, Iván; Sospedra, Joaquim; Das Neves, Luciana; Altomare, Corrado; Suzuki, Tomohiro; Bezuijen, Adam

Sand-filled geosystems have the potential to mimic aspects of natural and nature-based features that can enhance the resilience of coastal areas challenged by climate, with additional (structural) reinforcement.

Knowledge gaps can be identified. For instance, (i) the sediment transport mechanisms around the geosystem; (ii) the amount of erosion in the leeside when the system is overtopped; (iii) quantitative contribution the geosystem for the wave overtopping reduction; and (iv) failure mechanisms of the geosystem under extreme conditions. Specific tests are proposed in order to fill the defined knowledge gap and answer the following research questions:

  1. How do nearshore coastal processes (wave transformation, sediment transport) and wave structure interactions during extreme events differ from those during more usual big storm conditions for situations with and without the geosystem?
  2. How do feedbacks between the hydrodynamics and morphology of natural and nature-based features affect flooding, erosion, and recovery of coastal areas when
    erosion is limited by the 'geosystem'?
  3. How to conceive a dynamic coastal protection that can easily adapt to climate change in areas experiencing coastal squeeze (i.e. dense urban environment and human infrastructure with sea encroaching land) and vulnerable to coastal erosion and flooding risks?

The set of experiments, done at the large wave Flume (CIEM) in Barcelona, are here described in order to answer the previous questions. These experiments started on October 2018 and ended at the end of November 2018. These tests include different configurations: an initial benchmark tests in order to test the wave conditions were no geosystem protection is used, a second layout with a geotube used as a geosystem protection and finally a third layout were geobags are used as a protection.

Files (853.1 kB)
Name Size
geos_CONTROL.xls
md5:e1078428713f9ba6be008a8c8f28adea
247.3 kB Download
Geos_initial_data_treatment.pdf
md5:ca2707cfcbd5aff6b805d18c555bcbc6
605.8 kB Download
27
33
views
downloads
All versions This version
Views 278
Downloads 3315
Data volume 33.2 MB7.3 MB
Unique views 227
Unique downloads 2510

Share

Cite as