Published December 20, 2018 | Version v1

Problem instances for scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space

  • 1. Technische Universität Darmstadt, Fachgebiet Management Science / Operations Research
  • 2. Technische Universität Darmstadt, Fachgebiet Produktion und Supply Chain Management
  • 3. University of Luxembourg, Luxembourg Centre for Logistics and Supply Chain Management,

Description

We randomly generated problem instances for the problem of scheduling the build-up of unit load devices at an air cargo terminal under space and personnel constraints (ULDSP in the following) which are used in the working paper "Emde, S., Abedinnia, H., Lange, A., and Glock, C. (2018): Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space. Working paper TU Darmstadt".

In total there are 60 problem instances which are divided in three datasets (small, medium, large) each of which contains 20 problem instances.

Files

Files (536.6 kB)

Name Size
md5:09b2c3c856b0e39031dc31bd4845adb5
536.6 kB Download