Published June 1, 2025 | Version v1
Journal article Open

Development of Optimized Maintenance Scheduling Model for Coal-Fired Power Plant Boiler

  • 1. Energy and Renewable Energies Technology Centre, University of Technology-Iraq, Iraq; Energy and Renewable Energies Technology Centre, University of Technology- Iraq, Iraq

Description

Efficient maintenance scheduling for coal-fired power plant boilers requires systematic approaches due to frequent upkeep needs. Computing intelligence, a subset of AI, aids in gaining insights. Optimization methods like MILP and PSO rely on constraints and variables to minimize or maximize objectives. This study applied MILP and PSO to address maintenance optimization. Mathematical formulations were devised specifically for these methods to tackle boiler maintenance scheduling effectively.

Notes

Published in Evergreen, Volume 12, Issue 02. Citation formats available via DOI link.

Files

p701-714.pdf

Files (2.1 MB)

Name Size Download all
md5:7f25bd46d0dc131c50814a07b0db42a5
2.1 MB Preview Download

Additional details

Related works

Is identical to
Journal article: 10.5109/7363469 (DOI)
Is supplemented by
Other: https://citation.crossref.org/?doi=10.5109/7363469 (URL)