Development of Optimized Maintenance Scheduling Model for Coal-Fired Power Plant Boiler
Authors/Creators
- 1. Energy and Renewable Energies Technology Centre, University of Technology-Iraq, Iraq; Energy and Renewable Energies Technology Centre, University of Technology- Iraq, Iraq
Description
Efficient maintenance scheduling for coal-fired power plant boilers requires systematic approaches due to frequent upkeep needs. Computing intelligence, a subset of AI, aids in gaining insights. Optimization methods like MILP and PSO rely on constraints and variables to minimize or maximize objectives. This study applied MILP and PSO to address maintenance optimization. Mathematical formulations were devised specifically for these methods to tackle boiler maintenance scheduling effectively.
Notes
Files
p701-714.pdf
Files
(2.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:7f25bd46d0dc131c50814a07b0db42a5
|
2.1 MB | Preview Download |
Additional details
Related works
- Is identical to
- Journal article: 10.5109/7363469 (DOI)
- Is supplemented by
- Other: https://citation.crossref.org/?doi=10.5109/7363469 (URL)