Grenoble Field Experiment - Geophone and DAS with Simulations
Authors/Creators
Description
This upload contains field data recorded at a site on the Grenoble campus, where a pre-existing buried concrete foundation is present, along with numerical simulations based on the wave equation using the Spectral Element Method (SEM), replicating the site conditions.
Content Overview:
-
vs, vp, rho_c: Shear wave velocity (vs), compressional wave velocity (vp), and density (rho_c) models used for numerical simulations with the Spectral Element Method (SEM). The mesh consists of 100×100×60 elements, each 1 meter in size, with a free surface at the top and 14 ABS elements included at the edge. The interpolation order is 4. The source is a Ricker wavelet with a central frequency of 125 Hz, expressed by vertical force located at x = 20m, y = 50, z = 0.
-
d2x_dt2, d2z_dt2, dexx_dt: Synthetic observables from the simulation.
-
d2x_dt2: Horizontal acceleration in the x-direction -
d2z_dt2: Vertical acceleration -
dexx_dt: Strain rate calculated using a finite difference approach based on receivers spaced 2 meters apart, matching the experimental setup.
These datasets include 30 recordings: 15 located before the foundation and 15 after, each spaced 1 meter apart.
-
-
d2x_dt2 (GEO), d2z_dt2 (GEO), dexx_dt (DAS): Field recordings from geophones and DAS. The data have been recorded using 14 Hz geophones and Distributed Acoustic Sensing (DAS) with a 2-meter gauge length and 1-meter channel spacing. Refer to the figure Site_configuration for the layout.
-
14 total recordings: 7 located before the foundation and 7 after, spaced 2 meters apart starting 13 meters before the foundation.
-
Signals have been bandpass filtered between 10 Hz and 50 Hz.
-
GEOandDASrefer to the instruments used to measure each observable.
-
Note: The layout of the receivers in the simulation and the field experiment is nearly identical, with a few differences:
-
Sensor spacing: 1 meter in the simulation, 2 meters in the field experiment.
-
Number of sensors: 15 before and 15 after the foundation in the simulation; 7 before and 7 after in the field experiment.
-
Sensor alignment: In the simulation, all observables were recorded at the same spatial locations. In the field, the geophone and DAS lines were parallel but offset by approximately 30 cm.
Files
Site_configuration.pdf
Files
(961.7 MB)
| Name | Size | |
|---|---|---|
|
md5:e649a593ac3eddbc5976f06b766c8447
|
112.1 kB | Download |
|
md5:e6515934823e48fd468896475f4bcbda
|
7.8 MB | Download |
|
md5:29c38284fc475ec35c4a44144115a631
|
112.1 kB | Download |
|
md5:e6515934823e48fd468896475f4bcbda
|
7.8 MB | Download |
|
md5:7b39f57875ff1ce3f0f42667f83477de
|
16.9 kB | Download |
|
md5:9d6df9cf71250050a12e867aff2cd742
|
7.8 MB | Download |
|
md5:3e4949066731118c07e64d98b6a3d8bf
|
312.6 MB | Download |
|
md5:e56624d7cefd75fee69c692cc39376ff
|
85.2 kB | Preview Download |
|
md5:92be802867850d34283f97f12bf70514
|
312.6 MB | Download |
|
md5:50ae847cba3976a02f28a884b153e6af
|
312.6 MB | Download |
Additional details
Funding
Software
- Programming language
- Python