Published May 25, 2012
| Version 15717
Journal article
Open
The Situation in the Public Procurement Market in Post-Communist Countries: The Case of the Czech Republic
Authors/Creators
Description
Public procurement is one of the most
important areas in the public sector that introduces a possibility for a
corruption. Due to the volume of the funds that are
allocated through this institution (in the EU countries it is between 10
– 15% of GDP), it has very serious implications for the efficiency of
public expenditures and the overall economic efficiency as
well. Indicators that are usually used for the measurement of the
corruption (such as Corruption Perceptions Index - CPI) show that
the worst situation is in the post-communist countries
and Mediterranean countries.
The presented paper uses the Czech Republic as an example of a
post-communist country and analyses the factors which influence
the scope of corruption in public procurement. Moreover, the
paper discusses indicators that could point at the public procurement
market inefficiency. The presented results show that post-communist
states use the institute of public contracts significantly more than the
old member countries of the continental Europe. It has a very
important implication because it gives more space for corruption.
Furthermore, it appears that the inefficient functioning of public
procurement market is clearly manifested in the low number of bids,
low level of market transparency and an ineffective control
system. Some of the observed indicators are statistically significantly
correlated with the CPI.
Files
15717.pdf
Additional details
References
- Galtung, F. 2006. Measuring the Immeasurable: Boundaries and Functions of (Macro) Corruption Indices, in Measuring Corruption,Sampford, Ch.,Shacklock, A., Connors, C. and Galtung, F. Eds. (Ashgate).Budapest :TIRI and Central European University.
- Mauro, P. -IMF. 1997.Why worry about corruption? Washington, D.C. : International Monetary Fund.
- OECD 2005. Fighting Corruption and Promoting Integrity in Public Procurement.Paris : OECD.
- Tanzi, V. - Davoodi, H.R. 2000. Corruption, Growth, and Public Finances, IMF Working Paper Series WP/00/182 (Washington: Internatinal Monetary Fund)
- OECD 2001. Government Procurement : a Synthesis Report.Paris : OECD.
- Nemec, J., Ochrana, F., Sumpikova, M. 2008. Czech and Slovak lessons for public administration performance evaluation, management and finance. EkonomickÛčasopis. 56 (4):353-369.
- Kuhlman, J.R., Johnson, S.R. 1983. The Number of Competitors and Bid Prices. Southern Economic Journal. 50 (1): 213-220.
- Iimi A. 2006. Auction Reforms for Effective Official Development Assistance. Review of Industrial Organization. 28: 109-128.
- Li T, Zheng X. 2006. Entry and Competition Effects in First-Price Auctions: Theory and Evidence from Procurement Auctions. Centre for Microdata Methods and Practice, Institute for Fiscal Studies. 69. Retrieved August 24, 2009, from http://www.cemmap.ac.uk/wps/cwp1306.pdf [10] Pavel, J. 2010. The Analysis of the Relationship between the Rate of Competition and the Prices of Large TransportInfrastructure Buildings. Politick├íekonomie. 58 (3): 343-356. [11] EC 2011. Public procurement in Europe: Cost and Effectiveness.Brussels : European Commission. Retrieved Februar 2, 2012,fromhttp://ec.europa.eu/internal_market/publicprocurement/docs/m odernising_rules/cost-effectiveness_en.pdf [12] Pavel, J. - Sičáková-Beblavá, E. 2008. Transparency of public procurement market in the Czech Republic and Slovakia. EkonomickÛčasopis. 56 (2): 168-181. [13] Bachan, M. 2009. Kontrolazad├ív├ín├¡veřejn├¢chzak├ízek. Praha :Vysok├í┼íkolaekonomick├í v Praze. (thesis) [14] Čechová, L. 2011 Efektivnostkontrol ÚOHS a NKÚ v oblastiveřejn├¢chzak├ízek.Praha :Vysok├í┼íkolaekonomick├í v Praze. (thesis) [15] Pavel, J. 2009. Efekt├¡vnos┼Ñfungovaniakontroln├¢chsystémovverejnéhoobstar├ívanianaSlo vensku.Bratislava : Transparency International - Slovensko. Retrieved Februar 2, 2012, from http://backup.transparency.sk/obstaravanie/regres_web.pdf