Published June 26, 2013
| Version 12920
Journal article
Open
A Search Algorithm for Solving the Economic Lot Scheduling Problem with Reworks under the Basic Period Approach
Authors/Creators
Description
In this study, we are interested in the economic lot
scheduling problem (ELSP) that considers manufacturing of the
serviceable products and remanufacturing of the reworked products. In
this paper, we formulate a mathematical model for the ELSP with
reworks using the basic period approach. In order to solve this
problem, we propose a search algorithm to find the cyclic multiplier ki
of each product that can be cyclically produced for every ki basic
periods. This research also uses two heuristics to search for the optimal
production sequence of all lots and the optimal time length of the basic
period so as to minimize the average total cost. This research uses a
numerical example to show the effectiveness of our approach.
Files
12920.pdf
Additional details
References
- F. F. Boctor, "The g-group heuristic for single machine lot scheduling," International Journal of Production Research, 25, pp. 363-379, 1987.
- Y.-J. Chang and M.-J. Yao, "New heuristics for solving the economic lot scheduling problem with reworks," Journal of Industrial Management Optimization, 7, pp. 229-551, 2011.
- D. A. Schrady, "A deterministic inventory model for repairable items," Naval Research Logistics Quarterly, 14, pp. 391-398, 1967.
- C.A. Soman, D. P. van Donk and G.J.C. Gaalman, "A basic period approach to the economic lot scheduling problem with shelf life considerations," International Journal of Production Research, 42, pp. 1677-1689, 2004.
- O. Tang and R. Teunter, "Economic lot scheduling problems with returns," Production and Operations Management, 15, pp. 488-497, 2006.
- R. Teunter, "Lot-sizing for inventory systems with product recovery," Computers & Industrial Engineering, 46, pp. 431-441, 2004.