Published February 27, 2013
| Version 10306
Journal article
Open
Development of Manufacturing Simulation Model for Semiconductor Fabrication
Description
This research presents the development of simulation
modeling for WIP management in semiconductor fabrication.
Manufacturing simulation modeling is needed for productivity
optimization analysis due to the complex process flows involved
more than 35 percent re-entrance processing steps more than 15 times
at same equipment. Furthermore, semiconductor fabrication required
to produce high product mixed with total processing steps varies from
300 to 800 steps and cycle time between 30 to 70 days. Besides the
complexity, expansive wafer cost that potentially impact the
company profits margin once miss due date is another motivation to
explore options to experiment any analysis using simulation
modeling. In this paper, the simulation model is developed using
existing commercial software platform AutoSched AP, with
customized integration with Manufacturing Execution Systems
(MES) and Advanced Productivity Family (APF) for data collections
used to configure the model parameters and data source. Model
parameters such as processing steps cycle time, equipment
performance, handling time, efficiency of operator are collected
through this customization. Once the parameters are validated, few
customizations are made to ensure the prior model is executed. The
accuracy for the simulation model is validated with the actual output
per day for all equipments. The comparison analysis from result of
the simulation model compared to actual for achieved 95 percent
accuracy for 30 days. This model later was used to perform various
what if analysis to understand impacts on cycle time and overall
output. By using this simulation model, complex manufacturing
environment like semiconductor fabrication (fab) now have
alternative source of validation for any new requirements impact
analysis.
Files
10306.pdf
Additional details
References
- Moti Klein and Adar Kalir," A Full Factory transient Simulation model For The Analysis of Expected Performance in A Transition Period," in Proc. winter simulation Conf .Israel, 2006.
- Boon Ping Gan, Peter Lendermann, Malcolm Yoke Hean Low, Stephen J. Turner, Xiaoguang Wang and Simon J.E. Taylor "Interoperating AutoSched AP Using The High Level Architecture," in Proc. Winter Simulation Conf. Singapore, 2005.
- Tyler Philips, "AutoSched AP by AutoSimulations," in Proc. Winter Simulation Conf. U.S.A, 1998.
- Ingy A. El-Khouly, Khaled S. El-Kilany, and Aziz E.-Sayed, "Effective Scheduling of Semiconductor Manufacturing", World Academy of Science, Engineering and Technology, vol. 79, 2011.
- Kader Ibrahim, Mohd Azizi Chik and UdaHashim, "Variability Due to Tool Configurations That Impacts Overall Capacity in Wafer Fabrication Facility" The 11th Asia Pacific Industrial Engineering and Management Systems Conference, Melaka, 2010.
- YudhaAndrianSaputra&StefanusEkoW.,"Combination of MAPE, MedAPE, and Skewness of APE", Industrial Engineering And Service Science (IESS) International Conferenc, SOLO.2011.
- Ben H. Thacker, Scott W. Doebling, Francois M. Hemez, Mark C. Anderson, Jason E. Pepin and Edward A. Rodriguez, Concepts of Model Verification and Validation. California, CA: United States Department of Energy, 2004, pp.17-21.
- Applied AutoSched AP. 2011. AutoSched AP Release Note v 10.0.1.
- Global Semiconductor Alliance (GSA), Semiconductor Market Overview, April 2011. [10] Mohd Azizi Chik, Mohd Hazmuni bin Saidin, and Uda bin Hashim, "Industrial Engineering Roles in Semiconductor Fabrication", APIEM 11th Conf. December 2010. [11] R. C. Leachman, D. A. Hodges, "Benchmarking Semiconductor Manufacturing," IEEE Trans. on Semiconductor Manufacturing, TSM-9 (May 1996), pp. 158-169. [12] Mohd Azizi Chik, Yeo EngTeck, Mahalil Amin AbdMalek, and Mohd HafidzSaidi, "Comprehensive Sequencing Dispatching Method for Identified Bottleneck Tool - Photolithography Process", NSM, Perlis, Malaysia, pp.19-21. 2003.