Published September 23, 2011
| Version 9880
Journal article
Open
Mixed Model Assembly Line Sequencing In Make to Order System with Available to Promise Consideration
Authors/Creators
Description
Mixed model assembly lines (MMAL) are a type of
production line where a variety of product models similar in product
characteristics are assembled. The effective design of these lines
requires that schedule for assembling the different products is
determined. In this paper we tried to fit the sequencing problem with
the main characteristics of make to order (MTO) environment. The
problem solved in this paper is a multiple objective sequencing
problem in mixed model assembly lines sequencing using weighted
Sum Method (WSM) using GAMS software for small problem and
an effective GA for large scale problems because of the nature of
NP-hardness of our problem and vast time consume to find the
optimum solution in large problems. In this problem three practically
important objectives are minimizing: total utility work, keeping a
constant production rate variation, and minimizing earliness and
tardiness cost which consider the priority of each customer and
different due date which is a real situation in mixed model assembly
lines and it is the first time we consider different attribute to
prioritize the customers which help the company to reduce the cost of
earliness and tardiness. This mechanism is a way to apply an advance
available to promise (ATP) in mixed model assembly line sequencing
which is the main contribution of this paper.
Files
9880.pdf
Files
(301.8 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:2247c1b83adab7d7ca701e66316b5a93
|
301.8 kB | Preview Download |
Additional details
References
- M. Ozbayraka. , T.C. Papadopouloub., E Samarasb., "A flexible and adaptable planning and control system for an MTO supply chain system". 2002.
- J. Bukchin., E.M. Dar-El., and J. Rubinovitz., "Mixed model assembly line design in a make-to-order environment", computer and industrial engineering, vol. 56, 2002, pp. 405-421.
- J.F. Bard, E.M. Dar-El., and Shtub, "An analytic framework for sequencing mixed model assembly line".,International Journal of Production Research , vol. 30 ,1992, pp. 35-48.
- R. Pibernik , "Advanced available-to-promise: Classification,selected methods and requirements for operations and inventory management", International. Journal of Production Economics, vol. 93, 2005,pp. 239- 252.
- C,Kilger. L. Schneeweis,. "Demand fulfilment and ATP". Springer, 2000, pp.79-95.
- C .Merengo., N, Pozzetti. "A Balancing and sequencing manual mixedmodel assembly lines", International Journal of Production Research, vol. 37, 1999.
- N .Boysen., M. Fliedner, A.Scholl, "Sequencing mixed-model assembly lines, Survey, classification and model critique", European Journal of Operational Research ,vol.192 ,2009, pp.349-373.
- S.G .Ponnambalama., P. Aravindanb. , Rao. Subba. , "Genetic algorithms for sequencing problems in mixed model assembly lines", Computers & Industrial Engineering, vol. 30 , 2003, pp. 669-690.
- M .Rabbani, A. Rahimi-Vahed., B. Javadi, and R. Tavakkoli- Moghaddam, "A New Approach for Mixed-Model Assembly Line Sequencing ",2006, OR. Conf. pp. 169-174. [10] S.M. Mirghorbani, M. Rabbani., R. Tavakkoli-Moghaddam, and A. Rahimi-Vahed,"A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing", Engineering Optimization, vol.11, 2007, pp. 997-1012. [11] A .Rahimi-Vahed, A. Mirzae, "A hybrid multi-objective shuffled frogleaping algorithm for a mixed-model assembly line sequencing problem", Computers & Industrial Engineering, 2007, pp. 642-666. [12] R.Tavakkoli-Moghaddam, A.R. Rahimi-Vahed, "A Memetic Algorithm for Multi-Criteria Sequencing Problem for a Mixed-Model Assembly Line in a JIT Production System ", IEEE Congress on Evolutionary Computation, 2006, pp. 2993-2998. [13] Z. Xiaobo, K. Ohno, "Sequencing Problem for a Mixed Model Assembly Line in a JIT Production System", Computers and industrial Engineering, vol. 27 , 1994, pp. 71-74. [14] T. Tamura , H. Long, K. Ohno, "Sequencing problem to level part usage rates and workloads for a mixed-model assembly line with a bypass subline", International Journal of Production Economics, vol. 30 , 1999, pp. 35-48. [15] J. Bautistaa, J. Cano, "Minimizing work overload in mixed-model assembly lines", International Journal of Production Economics, vol. 112, 2008, pp.177-191. [16] M. Rabbani., F. Radmehr, N. Manavizadeh, "Considering the conveyer stoppages in sequencing mixed-model assembly lines by a new fuzzy programming approach", international journal of Advanced manufacturing technology, 2010, vol. 54, pp. 775-788. [17] P.R. Mcmullen, G.V Frazier, "A simulated annealing approach to mixedmodel sequencing with multiple objectives on a just-in-time line", IIE Transactions, vol. 32, 2000, pp.679-686. [18] Z. X. Guo, W. K. Wong, S. Y. S. Leung, J. T. Fan and S. F. Chan. ,"A Bi-level Genetic Algorithm for Multi-objective Scheduling of Multi- and Mixed-Model Apparel Assembly Lines,". Advances in Artificial Intelligence, 2006, 19th Australian Joint Conference on Artificial Intelligence, pp. 934-941, Springer. [19] V. Gordon, .J.M. Proth, C .Chu, " survey of the state-of-the-art of common due date assignment and scheduling research", European Journal of Operational Research , vol.139, 2002, pp. 1-25. [20] R.B. Kethley, B. Alidaee," Single machine scheduling to minimize total weighted late work: a comparison of scheduling rules and search algorithms", Computers and Industrial Engineering, vol. 43, 2002, pp. 509-528. [21] M. Feldmann, D. Biskup, "Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches", Computers and Industrial Engineering, vol. 44, 2003, pp.307-323. [22] K.L .Choy , Y.K. Leung, H.K.H. Chow, T.C. Poon, C.K. Kwong, G.T.S. Ho, S.K. Kwok, "A hybrid scheduling decision support model for minimizing job tardiness in a make-to-order based mould manufacturing environment", Expert Systems with Applications , 2010, pp.1931-1941. [23] J. Miltenburg," U-shaped production lines: A review of theory and practice", International Journal of Production Economics, vol.70, 2001, pp. 201-214. [24] J. Miltenburg, J. Wijngaard, "The U-line balancing problem", Manage Sci, vol.40, 1994, pp.1378-1388. [25] M. Ball, C.Y. Chen, Z. Zhao, R.H. Smith, "Optimization Based Available to Promise", School of Business and Institute for Systems Research University of Maryland, College Park, MD USA(2000) [26] C.J. Hyun, Y.Kim, Y.K. Kim,"A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines". Computers and Operations Research, vol. 25, 1998, pp. 675-690. [27] J. Miltenburg, "Level schedules for mixed-model assembly lines in justin- time production systems". Manage Science , vol.35, 1989, pp. 192- 207. [28] D. Biskup, T.C. Edwin Cheng, "Multiple-machine scheduling with earliness, tardiness and completion time penalties", Computers and Operations Research, vol. 26, 1999, pp. 45-57.