Alberta Differential Magnetometer Measurement (DMM) Data from 2021

  • 1. ROR icon University of Alberta

Description

This data product consists of a magnetometer dataset from the augmented differential magnetometer measurement (DMM) study conducted in Alberta, Canada in 2021 and GIC data from a nearby transformer substation. This data was analyzed and presented in the paper "Using a Differential Magneoter Measurement to Infer Geomagnetically Induced Currents: An Augmented Approach." Specifically, these datasets were used to create Figures 3,  4, 5, 6, 7, 9 and 10 in this paper.

The data files available here are from two magnetometers (USB4 and USB5) on a magnetically quiet day, September 26th, 2021, and a magnetically active day, October, 12th, 2021. USB4 data is from the underline sensor and USB5 is from the remote sensor. Each DMM data file includes the time in UT and magnetic field measurements in the x, y, and z components, where Bx is magnetic north and By is magnetic east. The GIC data file includes the local time (Mountain Daylight Time = GMT-6) and the transformer neutral-to-ground current at the Ellerslie substation (89S) in both transformers (T1 and T2) during the magnetic storm on October 12th, 2021. The magnetic data has a resolution of 1 Hz. The GIC data has a resolution of 0.5 Hz. 

Files

20211012_GIC_data_89S.csv

Files (18.0 MB)

Name Size Download all
md5:9b419cdfd8b3181f714ddfff7d6d6963
4.1 MB Download
md5:be5e4ef04885e5be7e0633002b52f4e0
4.1 MB Download
md5:d0478dff7a57c0d4beef73fbc98b6c85
1.6 MB Preview Download
md5:ea7c0279844c2f05bd2ae3d5505a347a
4.1 MB Download
md5:b101417e6116d14de7707f7b2065b83d
4.1 MB Download

Additional details

Dates

Collected
2021-09-26
Magnetically quiet day. Data from this date used to create Figure 3 and Figure 4 of paper.
Collected
2021-10-12
Geomagnetically active day. Data from this date used to create Figure 5, 6, 9 and 10 of paper.