Published January 8, 2024 | Version 2022-04-08

Raw data related to "Mey et al (2024): Visions for our future regional electricity system"

  • 1. ROR icon Research Institute for Sustainability at GFZ
  • 2. ROR icon Friedrich-Alexander-Universität Erlangen-Nürnberg
  • 3. ROR icon ETH Zurich

Description

Raw survey data from "Mey et al (2024): Visions for our future regional electricity system – citizen preferences in four EU countries".

The respository contains two types of files for each country:

  1. `raw-data-{ISO}.csv`: This is the raw JMP export from conjointly.com containing almost all data.
  2. `Masterdata_14979_{ISO}.xlsx`: This file contains the survey duration of each respondent.

We have also published a pre-processed, instead of raw, version of this dataset at 10.5281/zenodo.10463114.

 

If you use this dataset in an academic publication, please cite the following article:

Mey, F., Lilliestam, J., Wolf, I., & Tröndle, T. (2024). Visions for our future regional electricity system – citizen preferences in four EU countries. iScience.

Files

raw-data-DEU.csv

Files (35.9 MB)

Name Size Download all
md5:612b584d737233f3c3e670fc66b39c58
64.6 kB Download
md5:3c0019fb7ed94c527b727086c74a5629
66.0 kB Download
md5:137a250506e7f0bb8263811b8f1d586b
64.2 kB Download
md5:68c3f18eb8b6d2a761fe940ce3251c78
64.0 kB Download
md5:4beb9be8225467d82e8bccee8706ce41
9.1 MB Preview Download
md5:cbc1bdbd0743a0cab895ef229023972f
8.9 MB Preview Download
md5:dcd00286f0bfe5aa88a4add746e0367f
8.7 MB Preview Download
md5:eb5281a575e9086594275ccd208f9979
8.9 MB Preview Download

Additional details

Related works

Is required by
Workflow: 10.5281/zenodo.10463120 (DOI)
Is source of
Dataset: 10.5281/zenodo.10463114 (DOI)

Funding

European Commission
TRIPOD - The transition to a renewable electricity system and its interactions with other policy aims 715132
Deutsche Forschungsgemeinschaft
NFDI4Energy 501865131