D4.6 Visualizing and Dashboarding Construction Activities Based on Digital Twin Data

  • 1. Digital Twin Technologies
  • 2. NGEO
  • 3. Technical University Berlin

Description

ASHVIN project’s work package WP4 “Control and real-time simulation of construction”, develops applications for better managing and controlling construction site activities using digital twin data. The final objective of this work package is to develop accurate data and 4D-based visualizations, including a dashboard to allow site managers to understand, control, and manage construction sites under consideration of actual digital-twin-based data. Deliverable 4.6, entitled “Visualizing and dashboarding construction activities based on digital twin data,” was drafted by Rehan Khan from DTT, a technical partner in the project, and this report is related to task 4.6, “Site control dashboard and Visualization”. 

Files

ASHVIN D4.6.pdf

Files (3.3 MB)

Name Size Download all
md5:e5cd163c898a6e7bd716f53ec40f8f70
3.3 MB Preview Download

Additional details

Funding

Ashvin – Assistants for Healthy, Safe, and Productive Virtual Construction Design, Operation & Maintenance using a Digitial Twin 958161
European Commission