Published February 28, 2023
| Version v1
Project milestone
Open
Upgrade of the RBI-AF infrastructure for detector characterisation, SEE, micro hardness testing
- 1. RBI
Description
This document is related to the implementation of Task 4.2 ‘Micro-beam upgrade at RBI Accelerator
Facility’. The aim is to upgrade the two existing ion micro-beam stations by providing a precise
motorized positioning system with the beam current control and device under control position
monitor, as well as to demonstrate the sample cooling option for the ‘old’ micro-beam station. It has
been planned that up to M23 ‘new’ ion micro-beam station will be upgraded (MS12) and that the
‘old’ micro-beam station will be upgraded in the same way before the project end.
Files
AIDAinnova_MS12.pdf
Files
(1.0 MB)
Name | Size | Download all |
---|---|---|
md5:a40d367570a1553e15b909f7c708f56f
|
1.0 MB | Preview Download |