MARVEL D6.2: Evaluation Report
Description
This document provides a detailed report on the evaluation activities carried out up to the first integration phase (R1) of the MARVEL framework. The evaluation is carried out against a set of pre-defined parameters and KPIs, that had been organised in a number of categories during the earlier stages of the project. This document reports on (a) Project-related KPIs, (b) Use Case specific KPIs, and (c) Asset-specific KPIs. The document tabulates and analyses the results and evaluations of various components and goals and provides suggestions for the R2 integration phase. In addition, this document (D6.2) forms the basis for the final version (D6.4) that will also include evaluation and analysis of the framework KPIs, business KPIs and societal goals that consider the impact of the project as a whole.
Files
MARVEL-d6.2.pdf
Files
(2.6 MB)
Name | Size | Download all |
---|---|---|
md5:a32b5a421647f893417e376f04bfc2c8
|
2.6 MB | Preview Download |