ACHIEVING ENERGY SAVINGS IN PERFORMING HOLE DRILLING ON MAIN WATER PRESSURE PIPES
Creators
- 1. doctor (PhD) in technical sciences Navoi State Mining and Technological University
- 2. 4th year student of the Navoi Pedagogical Institute.
Description
Abstract
The main goal of the presented article is to optimize the possibilities of replacing outdated pipeline networks of existing enterprises in our republic, to improve time and quality indicators, and to ensure continuous production process. Creation of a hole-drilling device for connecting an additional pipeline network to surface and underground low-pressure water, oil and gas pipelines passing through the territory of our republic, designing and testing the project in practice, theoretically and mathematically analyzing the parameters of all indicators during the testing process, and finding more optimal method is provided by the current project. In order to prevent the negative effect of the water leaking from the pipe on the welds during the connection of the newly connected low-pressure small-diameter pipe to the low-pressure large-diameter pipes, resulting in the defective bridging of the crystal lattices of the welds. The article mainly provides theoretical information on creating a dry, comfortable workplace for plumbers who repair and install pressure pipes in cold periods of the year.
Notes
Files
DSJ_64-61-65.pdf
Files
(748.6 kB)
Name | Size | Download all |
---|---|---|
md5:bb2563ac155acf3cdce56441792da3b5
|
748.6 kB | Preview Download |