Published March 30, 2022 | Version 1.0
Other Open

Planning & Control of Asphalt Production[CAP1]

Creators

  • 1. Fundación Cartif
  • 1. EIFFAGE

Description

 

One of the main problems in asphalt production is knowing the correct composition of the raw materials as well as their relevant properties. The extraction of knowledge will allow the development of an expert system that generates the adjustments of the setpoints of the controllers, the amounts of material to be incorporated into the processes such as the mixer, and other data. This expert system aims to minimize the excess asphalt material in hot containers at the end of the day in order to optimize the production process.

Notes

https://www.capri-project.com

Files

CAP1.zip

Files (2.6 MB)

Name Size Download all
md5:e202d320b7d312781662055679ed4575
2.6 MB Preview Download

Additional details

Related works

Is continued by
Other: 10.5281/zenodo.6451726 (DOI)

Funding

CAPRI – Cognitive Automation Platform for European PRocess Industry digital transformation 870062
European Commission