Published July 20, 2021 | Version v1
Journal article Open

Analysis of the possibilities of geometry of the Rosia Poieni mining field

  • 1. Technical University of Cluj Napoca, North University Center of Baia Mare, 62/A Victor Babes Street, Baia Mare, Romania
  • 2. CUPRUMIN ABRUD S.A. Open Pit Director, Piaţa Petru Dobra, nr. 1, Abrud, jud. Alba, Romania

Description

This paper is made within the European project GoldenEye Nr. 869398 Type Horizon 2020 and aims at geometrization in 3D format of the Rosia Poieni deposit. This geometrization will be based on the information on the contents of the deposit, the economic analysis, and the calculations of the stability of the open pit and the adjacent industrial waste dumps. The analysis of data from the literature on content is in a very wide and insufficiently relevant range. The study will be based on the latest scanning technologies, AI, numerical simulations (FLAC 2D), which will form the basis of an economic analysis and forecast of metal prices in the future in order to identify exploitable limits both horizontally and vertically. Depending on the extension of the exploitation area and the definition of the deep exploitation limit by up-to-date exploitation, stability calculations will be performed, which will finally allow the geometry and safety of the deposit. Also, this geometrization will allow the decision-making of exploitation, extension, optimization by the management team and the administrative council of CUPRUMIN ABRUD S.A.

Files

matecconf_simpro21_02010.pdf

Files (1.3 MB)

Name Size Download all
md5:45972a6f45619d39222b054045f3a1b7
1.3 MB Preview Download

Additional details

Funding

Goldeneye – Earth observation and Earth GNSS data acquisition and processing platform for safe, sustainable and cost-efficient mining operations 869398
European Commission