Published February 24, 2020
| Version v1
Project deliverable
Open
paperChain D05.4 - "Implementation of Circular Case 3. Railway applications"
Description
The objective of Circular Case 3 – Railway application is to demonstrate the use of this composite (paper deinking ash and paper deinking sludge), MUDIPEL, as a back-fill material set behind a retaining wall structure.
Files
paperChain-D05.4-(Implementation of Circular Case 3. Railway applications).pdf
Files
(7.1 MB)
Name | Size | Download all |
---|---|---|
md5:ee4923806d8ebef24ba069e2f9d34c70
|
7.1 MB | Preview Download |