paperChain D05.3 - "Implementation of Circular Case 2. Road applications"
Creators
- 1. ACCIONA
- 2. TECNALIA
- 3. UPC
Description
The three pilots that cover Circular Case 2, corresponding with the three types of stabilised soil layers included in the Spanish road regulation; S-EST2, S-EST3 and Soil-cement are described in this deliverable. Geographycal location, pilot design, the execution of the works and the monitoring planned and performed are described along the document.