Published May 6, 2025
| Version v1
Project deliverable
Open
D2.6 – Intermediate report and risk log - Report Nr 2
Description
This deliverable is the second risk report and updated risk log at month M12. The risk report and
risk log is updated every 6 months and is presented in different deliverables. We report on the
occurrence of foreseen and unforeseen risks, and update the table of potential risks with additional
foreseen risks.
Files
Updated report and log for risk prevention and mitigation (every 6 months).pdf
Files
(1.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:1e3e659eb310da95ef6c5e31eb422dba
|
1.3 MB | Preview Download |