Published April 10, 2025
| Version v2
Project deliverable
Open
Construction and qualification with beam of 10 x 10 cm² 2M Long, prototypes
Description
This document describes (1) the assembly procedure developed to build a prototype dual-readout calorimeter designed for hadronic containment (had-size prototype), (2) the readout integration developed for the highly granular modules (equipped with SiPMs) and (3) the performance obtained with electron beams up to 120 GeV.
Files
AIDAINNOVA-D8.4.pdf
Files
(2.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:532c8179a0814c4c8a7c160437b786b2
|
2.3 MB | Preview Download |
Additional details
Funding
Dates
- Submitted
-
2025-04-10