pathway,from_region,to_region,from_country,to_country,max_flow,max_counter_flow,voltage,distance,year_planned,source_1,source_2,assumptions,other_notes TRNAFGXXCHNXI,AFGXX,CHNXI,AFG,CHN,0,0,-,-,-,https://www.reuters.com/world/asia-pacific/taliban-join-chinas-belt-road-forum-elevating-ties-2023-10-14/,-,-,Afghanistan had joined China's Belt and Road initiative which is supposed to elevate ties between both countries including Chinese invements in mining and oil extraction. As of yet no mentioning of plans for an electricity interconnector. TRNAFGXXIRNXX,AFGXX,IRNXX,AFG,IRN,325,325,-,-,-,https://www.tehrantimes.com/news/468852/Iran-exporting-110MW-of-electricity-to-Afghanistan,-,It's reported that as of 2022 trade potential between both countries is set at 175 MW with plans existing to boost electricity exchange to a capacity of 500-600 MW. The planned capacities (no year mentioned) are therefore set at 500 MW (lower end estimate) minus the existing 175 MW = 325 MW.,- TRNAFGXXPAKXX,AFGXX,PAKXX,AFG,PAK,0,0,-,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.linkedin.com/pulse/electricity-trade-prospects-between-pakistan-farrukh-mahmood-mian/,"Following the specifics of the CASA-1000 project in the IEA report, the HVDC link from TJK to PAK will only transit through AFG (with transit charges) but not for power supply between TJK and AFG. New line is far in development, but finalization is stalled due to political unrest in Afghanistan hence for now we did not add any planned capacities. There's still interest in alternative projects between AFG and PAK (see Linkedin blog post) but no concrete plans found as of yet.",- TRNAFGXXTJKXX,AFGXX,TJKXX,AFG,TJK,0,0,-,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.brecorder.com/news/40272056,"Following the specifics of the CASA-1000 project in the IEA report, the HVDC link from TJK to PAK will only transit through AFG (with transit charges) but not for power supply between TJK and AFG. New line is far in development, but finalization is stalled due to political unrest in Afghanistan hence for now we did not add any planned capacities. Existing capacity is set to be 300 + 50 MW of unilateral capacity for exports from TJK to PAK (Table 3 IEA report). ",- TRNAFGXXTKMXX,AFGXX,TKMXX,AFG,TKM,1000,1000,500,-,-,https://pajhwok.com/2023/01/29/power-supply-project-from-turkmenistan-be-completed-soon/,-,-,Construction is underway for a 1000 MW 500 kV line between both countries. TRNAFGXXUZBXX,AFGXX,UZBXX,AFG,UZB,0,0,-,-,-,https://eurasianet.org/uzbekistan-begins-building-power-line-to-afghanistan,https://akipress.com/news:707772:Turkmenistan_and_Afghanistan_consider_issues_of_electricity_import/,"New 500 kv transmission line (1000 MW, 260 km) is far in development, but finalization is stalled due to political unrest in Afghanistan hence for now we did not add any new planned capacities.",- TRNAGOXXCODXX,AGOXX,CODXX,AGO,COD,600,600,400,260,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNAGOXXCOGXX,AGOXX,COGXX,AGO,COG,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNAGOXXNAMXX,AGOXX,NAMXX,AGO,NAM,600,600,400,450,-,https://www.afdb.org/sites/default/files/documents/projects-and-operations/multinational_-_baynes_hydro-power_angola_and_namibia_400_kv_transmission_lines_project_-_project_information_memorandum.pdf,-,-,"This is in references to the 'ANNA' interconnector for planned capacity, for the evacuation of power from the proposed 600 MW Baynes Hydro Power Project on the Cunene (Kunene) River. (pg 8 - planned capacity source)." TRNAGOXXZMBXX,AGOXX,ZMBXX,AGO,ZMB,0,0,-,-,-,https://www.google.co.uk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=&ved=2ahUKEwjovePmzvqCAxXSVkEAHYVuDwYQFnoECA4QAQ&url=https%3A%2F%2Fwww.mozambiqueenergysummit.com%2Fmedia%2Flxccup1e%2F3-chrispin-kahogo.pptx&usg=AOvVaw3TZTk8MMKTPadesDWbgYog&opi=89978449,https://www.lusakatimes.com/2020/02/28/zesco-and-angolan-firm-sign/#,"For planned capacity, Power Utility firm Zesco and RNT of Angola have signed an MOU for the development of the Zambia-Angola grid interconnecting transmission lines. But no details regarding MW or Voltages as of yet so set to 0.",- TRNALBXXGRCXX,ALBXX,GRCXX,ALB,GRC,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXKOSXX,ALBXX,KOSXX,ALB,KOS,0,0,110,33,2026,https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. Planned capacity only reported in kV terms but not in capacities (MW) hence not included.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNALBXXKOSXX,ALBXX,KOSXX,ALB,KOS,0,0,400,26,2032,https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf,-,Planned capacity is only reported in kV terms but not in capacities (MW) hence not included.,- TRNALBXXMKDXX,ALBXX,MKDXX,ALB,MKD,500,500,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXMNEXX,ALBXX,MNEXX,ALB,MNE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXSRBXX,ALBXX,SRBXX,ALB,SRB,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAREXXINDWE,AREXX,INDWE,ARE,IND,0,0,-,-,-,https://www.siasat.com/india-planning-power-grid-with-saudi-arabia-uae-via-undersea-cable-2576846/,-,-,"No capacity as of yet, but a subsea transmission line is being considered between both countries as part of the One Sun, One World, One Grid initiative." TRNAREXXIRNXX,AREXX,IRNXX,ARE,IRN,0,0,-,-,-,https://www.emirates247.com/iran-to-link-up-with-uae-power-grid-2010-09-06-1.288184,-,-,In the past it has been mentioned that there was interest for a subsea interconnection linking Iran with the Emirates but no concrete developments on this can be found. TRNAREXXOMNXX,AREXX,OMNXX,ARE,OMN,0,0,-,-,-,https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m,-,-,A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for new links to the Emirates. TRNAREXXSAUXX,AREXX,SAUXX,ARE,SAU,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,- TRNARGXXBOLXX,ARGXX,BOLXX,ARG,BOL,0,0,500,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNARGXXBRASO,ARGXX,BRASO,ARG,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNARGXXCHLXX,ARGXX,CHLXX,ARG,CHL,2135,2135,400;500/220;220;220,250;350;175;200,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://www.sciencedirect.com/science/article/pii/S2211467X22001614,No planned conmpletion years could be found for any of the planned interconnections.,- TRNARGXXPRYXX,ARGXX,PRYXX,ARG,PRY,270,270,500,-,2026,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://link.springer.com/article/10.1007/s12667-020-00420-w,Assumed that all planned connections had the higher planned power and voltage.,- TRNARGXXPRYXX,ARGXX,PRYXX,ARG,PRY,0,0,500,146,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,"Another planned line between Argentina and Paraguay, but unlike the Ana Cua project this one does not have a confirmed completion year" TRNARGXXURYXX,ARGXX,URYXX,ARG,URY,0,0,-,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNARMXXAZEXX,ARMXX,AZEXX,ARM,AZE,0,0,-,-,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,-,No mentioning of existing or planned interconnections between both countries in the Armenia 2022 Energy Policy Review. TRNARMXXGEOXX,ARMXX,GEOXX,ARM,GEO,350,350,400,-,2025,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,https://www.eeas.europa.eu/node/11301_en,Assumed power factor of 1 by converting MVA into MW.,There's mentioning of another 1000 MVA of planned capacity 'in later stages' but there doesn't seem to be concrete plans for this as of yet. TRNARMXXIRNXX,ARMXX,IRNXX,ARM,IRN,850,850,400,-,2025,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,Assumed power factor of 1 by converting MVA into MW. The Armenia 2022 Energy Policy Review report by the IEA mentions that MVA is expected to increase from 350 to 1200 by 2025 hence assumed planned capacity is 1200-350 = 850 MVA/MW. ,- TRNARMXXTURXX,ARMXX,TURXX,ARM,TUR,0,0,-,-,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,-,No mentioning of existing or planned interconnections between both countires in the Armenia 2022 Energy Policy Review. TRNAUSNTAUSQL,AUSNT,AUSQL,AUS,AUS,0,0,-,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSNTAUSSA,AUSNT,AUSSA,AUS,AUS,0,0,-,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSNTAUSWA,AUSNT,AUSWA,AUS,AUS,0,0,-,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSQLAUSSA,AUSQL,AUSSA,AUS,AUS,0,0,-,-,-,https://www.tdworld.com/grid-innovations/transmission/article/20971581/transaustralian-hvdc-interconnector,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUSQLAUSSW,AUSQL,AUSSW,AUS,AUS,900,730,330,461,2030,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. A 'Medium' lead time equals 6-7 years post final publication year (2024) hence assumed 2030 as commissioning year.,- TRNAUSQLPNGXX,AUSQL,PNGXX,AUS,PNG,0,0,-,-,-,https://hir.harvard.edu/electrification-in-papua-new-guinea/,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUSSAAUSSW,AUSSA,AUSSW,AUS,AUS,800,800,330,900,2025,https://www.projectenergyconnect.com.au/,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUSSAAUSVI,AUSSA,AUSVI,AUS,AUS,1640,1640,275;275,240,2031,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. A 'Long' lead time equals 7 years post final publication year (2024) hence assumed 2031 as commissioning year.,- TRNAUSSAAUSWA,AUSSA,AUSWA,AUS,AUS,0,0,-,-,-,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUSSWAUSVI,AUSSW,AUSVI,AUS,AUS,1669,1935,500;500,438,2029,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised.,- TRNAUSTAAUSVI,AUSTA,AUSVI,AUS,AUS,618,484,-,-,2029,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,"For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. The net additional network capacity is assumed to be the identified transmission limits if this project gets initiated (1212 MW TAS to VIC, 962 MW VIC to TAS) - the existing capacities.",- TRNAUSWAIDNNU,AUSWA,IDNNU,AUS,IDN,0,0,-,-,-,https://www.internationalaffairs.org.au/australianoutlook/the-cable-connection-australia-and-indonesias-shared-journey-to-net-zero-emissions/,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUSWATLSXX,AUSWA,TLSXX,AUS,TLS,0,0,-,-,-,https://thebpp.com.au/call-for-partnerships/bpp-call-for-off-grid-renewable-energy-partnerships-in-the-pacific-and-timor-leste/,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,-,No 'Anticipated/Committed' or 'Actionable' planned projects in AEMO 2023 Transmission Expansion Options Report. TRNAUTXXCHEXX,AUTXX,CHEXX,AUT,CHE,100,200,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNAUTXXCZEXX,AUTXX,CZEXX,AUT,CZE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXDEUXX,AUTXX,DEUXX,AUT,DEU,4000,4000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXDEUXX,AUTXX,DEUXX,AUT,DEU,100,100,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXDEUXX,AUTXX,DEUXX,AUT,DEU,2700,2700,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXDEUXX,AUTXX,DEUXX,AUT,DEU,1000,1000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNAUTXXHUNXX,AUTXX,HUNXX,AUT,HUN,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXITAXX,AUTXX,ITAXX,AUT,ITA,390,390,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXITAXX,AUTXX,ITAXX,AUT,ITA,150,150,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXITAXX,AUTXX,ITAXX,AUT,ITA,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXSVKXX,AUTXX,SVKXX,AUT,SVK,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXSVNXX,AUTXX,SVNXX,AUT,SVN,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNAZEXXGEOXX,AZEXX,GEOXX,AZE,GEO,0,0,-,-,-,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,-,- TRNAZEXXIRNXX,AZEXX,IRNXX,AZE,IRN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNAZEXXRUSSO,AZEXX,RUSSO,AZE,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,- TRNBDIXXCODXX,BDIXX,CODXX,BDI,COD,0,0,-,78,-,https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf,-,"Planned Interconnection - relates to the Ruzizi IV Hydropower Plant, which will feed into the grids of Burundi-DRC-Rwanda by means of 220 kV lines. However, this does not directly integrate the systems of the involved countries. Except for the reported transmission distance, no additional project info exists as of yet.",- TRNBDIXXRWAXX,BDIXX,RWAXX,BDI,RWA,250,250,220,140.7,2025,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-F00-077,-,- TRNBDIXXTZAXX,BDIXX,TZAXX,BDI,TZA,0,0,220,180,-,"https://reglobal.org/tanzanian-power-sector-ambitious-targets-set-for-the-coming-decade/#:~:text=Burundi–Tanzania%20Interconnector,estimated%20to%20cost%20USD80%20million.",-,No data on capacities (MW) found.,- TRNBELXXDEUXX,BELXX,DEUXX,BEL,DEU,1000,1000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXFRAXX,BELXX,FRAXX,BEL,FRA,1500,1500,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXFRAXX,BELXX,FRAXX,BEL,FRA,1000,1000,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXGBRXX,BELXX,GBRXX,BEL,GBR,1400,1400,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXGBRXX,BELXX,GBRXX,BEL,GBR,1400,1400,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNBELXXLUXXX,BELXX,LUXXX,BEL,LUX,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXNLDXX,BELXX,NLDXX,BEL,NLD,1000,2000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXNLDXX,BELXX,NLDXX,BEL,NLD,2000,2000,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBENXXBFAXX,BENXX,BFAXX,BEN,BFA,450,450,330,330,2024,"https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-146#:~:text=Project%20General%20Description,842%20km%20with%20transformer%20substations.",-,-,- TRNBENXXGHAXX,BENXX,GHAXX,BEN,GHA,650,650,330,350,-,https://www.au-pida.org/view-project/2006/,-,-,Planned capacity is in reference to the WAPP Coastal Transmission Backbone. TRNBENXXNERXX,BENXX,NERXX,BEN,NER,450,450,330,-,-,https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf,"https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-146#:~:text=The%20Nigeria%2DBenin%2DNiger%2D,842%20km%20with%20transformer%20substations.",-,- TRNBENXXNGAXX,BENXX,NGAXX,BEN,NGA,650,650,-,-,-,https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf,-,-,- TRNBENXXTGOXX,BENXX,TGOXX,BEN,TGO,0,0,-,-,-,https://www.au-pida.org/view-project/2006/,-,-,- TRNBFAXXCIVXX,BFAXX,CIVXX,BFA,CIV,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNBFAXXGHAXX,BFAXX,GHAXX,BFA,GHA,0,0,-,-,-,https://www.eu-africa-infrastructure-tf.net/activities/grants/interconnection-bolgatanga-ouagadougou-ta-afd.htm,-,-,- TRNBFAXXMLIXX,BFAXX,MLIXX,BFA,MLI,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNBFAXXNERXX,BFAXX,NERXX,BFA,NER,450,450,330,-,2024,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,"https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-146#:~:text=Project%20General%20Description&text=Two%20double%2Dcircuit%20450%20MW,within%20a%205%20km%20radius.",-,WAPP North Core Project TRNBFAXXTGOXX,BFAXX,TGOXX,BFA,TGO,374,374,330,-,-,https://www.alliance-sahel.org/en/projects/the-west-african-power-pool-wapp-north-dorsal-project/,https://www.afdb.org/sites/default/files/documents/projects-and-operations/330_kv_wapp_north_core_project_nigeria_-_niger_-_benin_-_burkina_faso_-_pim.pdf,-,In reference to the West African Power Pool North Dorsal project (North Core). Planned Capacity was sourced from ADP source (pg 4). TRNBGDXXINDEA,BGDXX,INDEA,BGD,IND,0,0,765;765,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,A 765 kV Double Circuit transmission project is being reviewed by the respective authorities in Bangladesh and India (Katihar-Parbatipur-Baranagar 765 KV high power interconnection transmission line project) yet as of now this is in early stages. No mentioning of expected transmission capacity in MW terms nor any expected completion year. TRNBGDXXINDNE,BGDXX,INDNE,BGD,IND,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNBGDXXMMRXX,BGDXX,MMRXX,BGD,MMR,0,0,-,-,-,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,-,-,- TRNBGRXXGRCXX,BGRXX,GRCXX,BGR,GRC,930,600,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXMKDXX,BGRXX,MKDXX,BGR,MKD,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXROUXX,BGRXX,ROUXX,BGR,ROU,600,600,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXSRBXX,BGRXX,SRBXX,BGR,SRB,730,186,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXSRBXX,BGRXX,SRBXX,BGR,SRB,490,270,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNBGRXXTURXX,BGRXX,TURXX,BGR,TUR,1100,1100,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBHRXXSAUXX,BHRXX,SAUXX,BHR,SAU,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,- TRNBIHXXHRVXX,BIHXX,HRVXX,BIH,HRV,298,644,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXMNEXX,BIHXX,MNEXX,BIH,MNE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXSRBXX,BIHXX,SRBXX,BIH,SRB,850,700,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXSRBXX,BIHXX,SRBXX,BIH,SRB,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXSRBXX,BIHXX,SRBXX,BIH,SRB,2310,1200,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNBLRXXLTUXX,BLRXX,LTUXX,BLR,LTU,0,0,-,-,-,https://www.entsoe.eu/data/map/,-,-,- TRNBLRXXLVAXX,BLRXX,LVAXX,BLR,LVA,0,0,-,-,-,https://www.entsoe.eu/data/map/,-,-,- TRNBLRXXPOLXX,BLRXX,POLXX,BLR,POL,0,0,-,-,-,https://www.entsoe.eu/data/map/,-,-,Historically BLR and POL have a number of AC tie-lines but these are not operational as of 2024. TRNBLRXXRUSCE,BLRXX,RUSCE,BLR,RUS,0,0,-,-,-,https://www.entsoe.eu/data/map/,-,-,ENTSOE map shows no new (known) concrete transmission projects as of now between Belarus and Russia. TRNBLRXXRUSNW,BLRXX,RUSNW,BLR,RUS,0,0,-,-,-,https://www.entsoe.eu/data/map/,-,-,ENTSOE map shows no new (known) concrete transmission projects as of now between Belarus and Russia. TRNBLRXXUKRXX,BLRXX,UKRXX,BLR,UKR,0,0,-,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,-,UKR historically was connected with BLR and RUS but disconnected early 2022 so existing and planned capacities are set to 0.,- TRNBLZXXGTMXX,BLZXX,GTMXX,BLZ,GTM,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNBLZXXMEXXX,BLZXX,MEXXX,BLZ,MEX,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNBOLXXBRACW,BOLXX,BRACW,BOL,BRA,0,0,500,284,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,An interconnection between Bolivia and Brazil is currently being studied yet the project is in an early stage and as of yet no data on transmission capacity can be found (only proposed voltage and length of the proposed pathway).,- TRNBOLXXBRAWE,BOLXX,BRAWE,BOL,BRA,0,0,-,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBOLXXCHLXX,BOLXX,CHLXX,BOL,CHL,150,150,220,194,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBOLXXPERXX,BOLXX,PERXX,BOL,PER,150,150,230,278,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,It is assumed that the planned interconnector would have the higher voltage (230 kV) compared to the possible lower value (220 kV).,- TRNBOLXXPRYXX,BOLXX,PRYXX,BOL,PRY,0,0,220,400,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBRACNBRACW,BRACN,BRACW,BRA,BRA,4231,4231,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRANE,BRACN,BRANE,BRA,BRA,1557,1557,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRANW,BRACN,BRANW,BRA,BRA,694,694,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRASE,BRACN,BRASE,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNGUYXX,BRACN,GUYXX,BRA,GUY,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRACNSURXX,BRACN,SURXX,BRA,SUR,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRACWBRANE,BRACW,BRANE,BRA,BRA,926,926,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRANW,BRACW,BRANW,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRASE,BRACW,BRASE,BRA,BRA,847,847,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRASO,BRACW,BRASO,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRAWE,BRACW,BRAWE,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWPRYXX,BRACW,PRYXX,BRA,PRY,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANEBRASE,BRANE,BRASE,BRA,BRA,4376,4376,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRANWBRAWE,BRANW,BRAWE,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRANWCOLXX,BRANW,COLXX,BRA,COL,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWGUFXX,BRANW,GUFXX,BRA,GUF,0,0,230,565,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"An interconnection between BRA and GUF is currently being studied as part of the 'Arco Norte' project, yet it is in an early stage and as of yet no data on transmission capacity can be found (only proposed voltage and length of the proposed pathway).",- TRNBRANWGUYXX,BRANW,GUYXX,BRA,GUY,0,0,500;500,400;400,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"An interconnection between BRA and GUY is currently being studied as part of the 'Arco Norte' project, yet it is in an early stage and as of yet no data on transmission capacity can be found (only proposed voltage and length of the proposed pathway).",- TRNBRANWPERXX,BRANW,PERXX,BRA,PER,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWSURXX,BRANW,SURXX,BRA,SUR,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWVENXX,BRANW,VENXX,BRA,VEN,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRASEBRASO,BRASE,BRASO,BRA,BRA,2188,2188,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRASEBRAWE,BRASE,BRAWE,BRA,BRA,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRASOPRYXX,BRASO,PRYXX,BRA,PRY,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRASOURYXX,BRASO,URYXX,BRA,URY,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRAWEPERXX,BRAWE,PERXX,BRA,PER,0,0,-,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRNXXMYSSK,BRNXX,MYSSK,BRN,MYS,0,0,-,-,-,https://bimp-eaga.asia/article/energy-ministers-push-expansion-asean-power-grid-and-trans-asean-gas-pipeline,https://asean.org/joint-statement-of-brunei-darussalam-indonesia-malaysia-and-the-philippines-power-integration-project-bimp-pip/,-,"In September 2023 the BIMP countries (Brunei Darussalam, Indonesia, Malaysia and the Philippines) agreed on launching a pilot project to study cross-border power trade amongst themselves as part of the ASEAN power grid developments. However, as of yet no concrete plans exist for specific transmission projects between BRN and MYS." TRNBTNXXCHNTI,BTNXX,CHNTI,BTN,CHN,0,0,-,-,-,https://cea.nic.in/wp-content/uploads/page/2020/12/ntgmp_volII.pdf,-,-,No mentioning of planned electricity trade initiatives between both countries in 2020 and 2030 transmission development plan. TRNBTNXXINDEA,BTNXX,INDEA,BTN,IND,2220,0,-,-,2025,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,The Ministry of Power of the government of India mentions that the power transfer between Bhutan and India by 2024-2025 is expected to increase to 4200 MW. The transfer capacity is used to export electricity from Bhutan's hydro facilities. The assumed unidirectional planned capacity therefore is 4200 MW - 1980 MW = 2220 MW.,- TRNBWAXXNAMXX,BWAXX,NAMXX,BWA,NAM,0,0,-,-,-,https://www.mdpi.com/1996-1073/16/3/1028,-,-,- TRNBWAXXZAFXX,BWAXX,ZAFXX,BWA,ZAF,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website TRNBWAXXZMBXX,BWAXX,ZMBXX,BWA,ZMB,300,300,400,-,-,https://www.au-pida.org/view-project/727/,-,-,Planned capacity is in reference to the ZiZaBoNa project TRNBWAXXZWEXX,BWAXX,ZWEXX,BWA,ZWE,300,300,400,76,-,https://www.au-pida.org/view-project/727/,https://climatecompatiblegrowth.com/wp-content/uploads/Mobilising-climate-finance-for-grids-COP27.pdf,-,Planned capacity is in reference to the ZiZaBoNa project TRNCAFXXCMRXX,CAFXX,CMRXX,CAF,CMR,0,0,-,-,-,https://www.afdb.org/fr/documents/eoi-multinational-development-central-africa-power-pool-capp-regional-pool-masterplan-cmp,-,-,- TRNCAFXXCODXX,CAFXX,CODXX,CAF,COD,0,0,-,-,-,https://www.afdb.org/fr/documents/eoi-multinational-development-central-africa-power-pool-capp-regional-pool-masterplan-cmp,-,-,- TRNCAFXXCOGXX,CAFXX,COGXX,CAF,COG,0,0,-,-,-,https://www.afdb.org/fr/documents/eoi-multinational-development-central-africa-power-pool-capp-regional-pool-masterplan-cmp,-,-,- TRNCAFXXSDNXX,CAFXX,SDNXX,CAF,SDN,0,0,-,-,-,https://www.afdb.org/fr/documents/eoi-multinational-development-central-africa-power-pool-capp-regional-pool-masterplan-cmp,-,-,- TRNCAFXXSSDXX,CAFXX,SSDXX,CAF,SSD,0,0,-,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,-,-,No reported concrete plans within the World Bank Report. TRNCAFXXTCDXX,CAFXX,TCDXX,CAF,TCD,100,100,225,1024,2027,"https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-072#:~:text=In%20total%2C%20about%201%20024,Central%20Africa%27s%20priority%20integration%20projects.",https://www.enerdata.net/publications/daily-energy-news/cameroon-launches-its-1556-km-interconnection-project-chad.html,-,- TRNCANABCANBC,CANAB,CANBC,CAN,CAN,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,No new planned lines visible on BC hydro transmission map. TRNCANABCANNO,CANAB,CANNO,CAN,CAN,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,No mentioning of existing/new lines between Alberta and the Northern provinces in AESO Long-term Transmission Plan 2022. TRNCANABCANSK,CANAB,CANSK,CAN,CAN,0,0,-,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of new lines between Alberta and Saskatchewan in AESO Long-term Transmission Plan 2022. TRNCANABUSAGW,CANAB,USAGW,CAN,USA,0,0,-,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANABUSANW,CANAB,USANW,CAN,USA,0,0,-,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANABUSAWA,CANAB,USAWA,CAN,USA,0,0,-,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANABUSAWW,CANAB,USAWW,CAN,USA,0,0,-,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANARCANNL,CANAR,CANNL,CAN,CAN,0,0,-,-,-,-,-,-,No further plans found for expansion beyond the currently operational Maritime link. TRNCANARCANQC,CANAR,CANQC,CAN,CAN,0,0,-,-,-,https://atlantic.ctvnews.ca/nb-power-says-bringing-electricity-via-atlantic-loop-could-be-cost-prohibitive-1.6506988,https://www.cbc.ca/news/canada/nova-scotia/clean-power-plan-abandons-atlantic-loop-1.6992765,-,Additional transmission links between New Brunswick and Quebec are considered but recent comments from NB-power have indicated that the costs are considered as too high as of now so no concrete plans for the forseeable future. TRNCANARUSAIS,CANAR,USAIS,CAN,USA,0,0,-,-,-,https://www.iso-ne.com/static-assets/documents/2020/04/new-england-geographic-diagram-transmission-planning.pdf,-,-,No planned lines shown on ISO-NE transmission map. TRNCANBCCANNO,CANBC,CANNO,CAN,CAN,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,No existing/new planned lines visible on BC hydro transmission map. TRNCANBCUSAAA,CANBC,USAAA,CAN,USA,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,"No mentioning of planned lines between BC and the Washington, Idaho, Montana area. Also not visible on BC hydro transmission map." TRNCANBCUSAAK,CANBC,USAAK,CAN,USA,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,No existing/planned lines shown on BC Hydro transmission map. TRNCANBCUSABP,CANBC,USABP,CAN,USA,0,0,-,-,-,https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2022-bpa-transmission-plan.pdf,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,"No mentioning of planned lines between BC and the Washington, Idaho, Montana area. Also not visible on BC hydro transmission map." TRNCANBCUSADO,CANBC,USADO,CAN,USA,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,"No mentioning of planned lines between BC and the Washington, Idaho, Montana area. Also not visible on BC hydro transmission map." TRNCANBCUSAPI,CANBC,USAPI,CAN,USA,0,0,-,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,"No mentioning of planned lines between BC and the Washington, Idaho, Montana area. Also not visible on BC hydro transmission map." TRNCANMBCANNO,CANMB,CANNO,CAN,CAN,0,0,-,-,-,https://www.hydro.mb.ca/docs/projects/facilities_map.pdf,-,-,No existing/new planned lines visible on Manitoba hydro transmission map. TRNCANMBCANON,CANMB,CANON,CAN,CAN,0,0,-,-,-,https://www.ieso.ca/en/Get-Involved/Regional-Planning/Northwest-Ontario/bulk-planning ,-,-,Additional link between Ontario and Manitoba is considered as part of Phase 3 of the 'Northwest Bulk Transmission Line' developments but 'The IESO does not anticipate a need for Phase 3 at this time.' so no expected new planned capacities in the short term. TRNCANMBCANSK,CANMB,CANSK,CAN,CAN,100,100,230,46,2023,https://www.gov.mb.ca/sd/eal/registries/5950birtle/Proposal/executivesummary.pdf,-,-,- TRNCANMBUSAMI,CANMB,USAMI,CAN,USA,0,0,-,-,-,https://www.powereng.com/library/great-northern-500-kv-transmission-line-program-services,https://www.theglobeandmail.com/business/article-manitoba-hydro-expects-electricity-demand-to-double-over-next-two/,-,No mentioning of planned lines between Manitoba and United States except for the existing ones with MISO (USAMI). Manitoba expects to reduce exports of electricity over the coming years due to growing domestic demand. TRNCANMBUSASW,CANMB,USASW,CAN,USA,0,0,-,-,-,https://www.theglobeandmail.com/business/article-manitoba-hydro-expects-electricity-demand-to-double-over-next-two/,-,EIA data used to confirm that no lines/trade exists between CANMB and USASW.,No mentioning of planned lines between Manitoba and United States except for the existing ones with MISO (USAMI). Manitoba expects to reduce exports of electricity over the coming years due to growing domestic demand. TRNCANNLCANQC,CANNL,CANQC,CAN,CAN,0,0,-,-,-,https://globalnews.ca/news/9508822/quebec-newfoundland-labrador-hydroelectricity-talks/,-,-,As of yet no new lines/projects planned with the agreement on the current import of electricity running untill 2041. TRNCANNLGRLXX,CANNL,GRLXX,CAN,GRL,0,0,-,-,-,"https://claverton-energy.com/prospects-for-trans-atlantic-undersea-power-transmission.html#:~:text=There%20are%202%2Dpossibilities%20by,Greenland%20to%20Canada's%20Labrador%20province.",-,-,- TRNCANNOCANSK,CANNO,CANSK,CAN,CAN,0,0,-,-,-,https://www.inf.gov.nt.ca/sites/inf/files/a_vision_for_the_nwt_power_system_plan_-_december_2013.pdf,https://www.saskpower.com/Our-Power-Future/Infrastructure-Projects/Construction-Projects/~/link.aspx?_id=F68E3C5E04EA48E995C7B74531E4D5A7&_z=z,-,In 2013 there were discussions about an intertie but no recent developments for a potential project. TRNCANNOUSAAK,CANNO,USAAK,CAN,USA,0,0,-,-,-,-,-,-,"Alaska, Yukon, Nunavut and the Northwest Territories have isolated and scattered systems due to its large size." TRNCANONCANQC,CANON,CANQC,CAN,CAN,0,0,-,-,-,https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx,-,-,No evidence for new planned projects with the exception of a 600 MW firm capacity trading agreement starting in 2026. This does not involve the construction of new tielines. TRNCANONUSAMI,CANON,USAMI,CAN,USA,0,0,-,-,-,https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2022/2022-Annual-Planning-Outlook.ashx,-,-,No mentioning of new lines with USA in IESO Annual Planning Outlook 2022. TRNCANONUSANY,CANON,USANY,CAN,USA,0,0,-,-,-,https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2022/2022-Annual-Planning-Outlook.ashx,-,-,No mentioning of new lines with USA in IESO Annual Planning Outlook 2022. TRNCANONUSAPJ,CANON,USAPJ,CAN,USA,0,0,-,-,-,https://www.itclakeerieconnector.com/,https://www.yourerie.com/news/local-news/electricity-project-between-canada-erie-put-on-hold/,-,"The Lake Erie Connection was previously proposed in 2014, but it was placed on hold in 2022" TRNCANQCUSAIS,CANQC,USAIS,CAN,USA,1200,1200,-,241,2025,"https://www.energy.gov/oe/articles/exhibit-o-public-outreach-materials-0#:~:text=THE%20PROJECT,from%20Qu%C3%A9bec%20to%20New%20England.",https://www.necleanenergyconnect.org/faq,Distance of the 'CLEAN ENERGY CONNECT' project is given in miles hence converted to km (150 miles = 241 km). ,- TRNCANQCUSAIS,CANQC,USAIS,CAN,USA,1000,1000,-,340,-,https://www.nhbr.com/new-power-line-proposed-to-run-from-quebec-through-new-hampshire/,https://www.seacoastonline.com/story/news/2023/05/05/twin-states-clean-energy-link-hydropower-canada-nh-vermont/70183165007/,"Distance is given in miles, and has been converted to kilometers (211 miles ~ 340 km)",- TRNCANQCUSANY,CANQC,USANY,CAN,USA,1250,1250,400,603,2026,https://www.hydroquebec.com/projects/hertel-new-york-interconnection/,https://chpexpress.com/,Distance value is the sum of the Hertel-New York Project and Champlain Hudson Power Express lengths.,- TRNCANSKUSAMI,CANSK,USAMI,CAN,USA,0,0,-,-,-,-,-,-,No mentioning of planned lines between Saskatchewan and United States except for the ones with Southwest Power Pool (USASW). TRNCANSKUSASW,CANSK,USASW,CAN,USA,650,650,230;230,97;81,2027,https://www.spp.org/news-list/southwest-power-pool-welcomes-first-international-member/,https://www.ndic.nd.gov/sites/www/files/documents/Transmission-Authority/Publications/DS-%20North%20Dakota%20Grid%20Resiliency%20Plan%20Sept2023.pdf,Distance values are given in miles and have been converted to kilometers.,- TRNCANSKUSAWA,CANSK,USAWA,CAN,USA,0,0,-,-,-,-,-,-,No mentioning of planned lines between Saskatchewan and United States except for the ones with Southwest Power Pool (USASW). TRNCHEXXDEUXX,CHEXX,DEUXX,CHE,DEU,200,1200,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCHEXXDEUXX,CHEXX,DEUXX,CHE,DEU,1700,1850,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNCHEXXFRAXX,CHEXX,FRAXX,CHE,FRA,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNCHEXXITAXX,CHEXX,ITAXX,CHE,ITA,1000,1000,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCHEXXITAXX,CHEXX,ITAXX,CHE,ITA,200,200,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNCHLXXPERXX,CHLXX,PERXX,CHL,PER,200,200,220,55,2024,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://www.bnamericas.com/en/news/peru-developer-envisions-chile-power-link-online-in-2024,Assumed that the 'Tacna/Los Heroes-Arica/Parinacota' project will be completed by 2024 as indicated by the bnamericas report but no confirmation of this can be found. ,- TRNCHLXXPERXX,CHLXX,PERXX,CHL,PER,1000,1000,500,600,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,No potential completion year found for the 'Tacna/Montalvo (Pe)–Arica/Crucero(Cl)' project.,- TRNCHNANCHNHB,CHNAN,CHNHB,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNHE,CHNAN,CHNHE,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNHU,CHNAN,CHNHU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNJS,CHNAN,CHNJS,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNJX,CHNAN,CHNJX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNSD,CHNAN,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNANCHNZH,CHNAN,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNBECHNHB,CHNBE,CHNHB,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNBECHNNM,CHNBE,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNBECHNTJ,CHNBE,CHNTJ,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNGU,CHNCH,CHNGU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNHB,CHNCH,CHNHB,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNHN,CHNCH,CHNHN,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNHU,CHNCH,CHNHU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNSC,CHNCH,CHNSC,CHN,CHN,24000,24000,1000;1000,658;658,2025,https://news.bjx.com.cn/html/20220929/1258242.shtml,-,Total capacity of 24 GW on Sichuan-Chongqing lines planned for 2025 assuming a power factor of 1. Values are given in kVa.,- TRNCHNCHCHNSI,CHNCH,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNCHCHNSX,CHNCH,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNFUCHNGD,CHNFU,CHNGD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNFUCHNJX,CHNFU,CHNJX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNFUCHNZH,CHNFU,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNFUTWNXX,CHNFU,TWNXX,CHN,TWN,0,0,-,-,-,-,-,-,Taiwan is an energy island with no interconnection to other regions/countries. No information on new planned capacity found. TRNCHNGACHNJS,CHNGA,CHNJS,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNNI,CHNGA,CHNNI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNNM,CHNGA,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNQI,CHNGA,CHNQI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNSC,CHNGA,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNSD,CHNGA,CHNSD,CHN,CHN,8000,0,800,926,2025,https://cleanenergygrid.org/wp-content/uploads/2020/11/Macro-Grids-in-the-Mainstream-1.pdf,https://www.enerdata.net/publications/daily-energy-news/china-starts-building-800-kv-8-gw-gansu-shandong-transmission-line.html,-,- TRNCHNGACHNSI,CHNGA,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGACHNXI,CHNGA,CHNXI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGAMNGXX,CHNGA,MNGXX,CHN,MNG,0,0,-,-,-,https://www.adb.org/sites/default/files/project-documents/48030/48030-001-tacr-en_4.pdf,-,There is interest in additional (higher voltage) transmission interconnections between CHN and MNG but as of yet it doesn't seem that any projects are close to actual development.,- TRNCHNGDCHNGX,CHNGD,CHNGX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGDCHNHA,CHNGD,CHNHA,CHN,CHN,0,0,-,-,-,https://energycentral.com/news/hainan-underwater-grid-ready-power-ftz-development,https://www.xinhuanet.com/english/2019-02/12/c_137816315.htm,-,Phase ii of the Hainan - China mainland interconnection development was finalized in 2019/2020 increasing transmission capacity from 600 MW to 1200 MW. No further indications for newly planned projects can be found. TRNCHNGDCHNHK,CHNGD,CHNHK,CHN,CHN,0,0,500,-,2025,https://www.seetao.com/details/166829.html,-,"The same report that mentions the existing capacity of 1.7 GW between Guandong and Hong-Kong also reports that ""By 2025, Guangdong and Hong Kong will complete the 500 kV power transmission and transformation project, and complete the transformation and upgrading of 4 high-voltage lines and Shenzhen substation."" However, no information can be found on potential increase in terms of capacity hence has not been added to planned capacities.",- TRNCHNGDCHNHN,CHNGD,CHNHN,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGDCHNJX,CHNGD,CHNJX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGDCHNMA,CHNGD,CHNMA,CHN,CHN,0,0,-,-,-,-,-,-,"A new power line between Guangdong and Macau has been completed in 2022, yet no additional info can be found on potentially other planned capacities going forward so this is set to 0." TRNCHNGDCHNSC,CHNGD,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGDCHNYU,CHNGD,CHNYU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGUCHNGX,CHNGU,CHNGX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGUCHNHN,CHNGU,CHNHN,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGUCHNJS,CHNGU,CHNJS,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGUCHNSC,CHNGU,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGUCHNYU,CHNGU,CHNYU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGXCHNHN,CHNGX,CHNHN,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGXCHNXI,CHNGX,CHNXI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGXCHNYU,CHNGX,CHNYU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNGXVNMNO,CHNGX,VNMNO,CHN,VNM,0,0,-,-,-,"https://southeastasiainfra.com/vietnams-power-development-plan-unlocking-res-potential-to-achieve-energy-transition-goals/#:~:text=These%20lines%20are%20expected%20to,through%20110%20kV%20power%20lines.",https://www.digitimes.com/news/a20230707VL209/digitimes-research-vietnam-ict-manufacturing-meet-the-analyst.html,-,110 kV line between Guangxi and Vietnam has been reopened in 2023 with an agreed max trade of 70 MW. No other concrete plans found as of yet. TRNCHNHBCHNHE,CHNHB,CHNHE,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHBCHNLI,CHNHB,CHNLI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHBCHNNM,CHNHB,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHBCHNSD,CHNHB,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHBCHNSX,CHNHB,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHBCHNTJ,CHNHB,CHNTJ,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNHU,CHNHE,CHNHU,CHN,CHN,5000,5000,1000;1000,456.4;456.4,2024,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,http://www.jx.chinanews.com.cn/news/2023/0705/81473.html,-,5 GW Wuhan-Nanchang line planned for 2024. TRNCHNHECHNJS,CHNHE,CHNJS,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNQI,CHNHE,CHNQI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNSD,CHNHE,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNSI,CHNHE,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNSX,CHNHE,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHECHNXI,CHNHE,CHNXI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHJCHNJI,CHNHJ,CHNJI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHJCHNNM,CHNHJ,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHJRUSFE,CHNHJ,RUSFE,CHN,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNHJRUSSI,CHNHJ,RUSSI,CHN,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNHNCHNHU,CHNHN,CHNHU,CHN,CHN,6000,6000,1000;1000,287;287,2023,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,https://www.chinadaily.com.cn/a/202206/10/WS62a2ae9ea310fd2b29e61e6f.html,-,6 GW Zhumadian-Wuhan line planned for 2023. TRNCHNHNCHNJX,CHNHN,CHNJX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHNCHNNI,CHNHN,CHNNI,CHN,CHN,0,8000,800,1634,2025,http://www.ecns.cn/cns-wire/2023-06-12/detail-ihcqhipa9366506.shtml,-,-,Planned 8 GW HVDC line transporting desert solar power from Ningxia to Hunan. TRNCHNHNCHNSC,CHNHN,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHNCHNSX,CHNHN,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHUCHNJX,CHNHU,CHNJX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNHUCHNSC,CHNHU,CHNSC,CHN,CHN,0,8000,800,-,2025,https://www.gov.cn/xinwen/2023-02/16/content_5741824.htm,https://www.seetao.com/details/203205.html,Planned multi-terminal HVDC line that transports hydropowered electricity from Tibet & Sichuan to Hubei. Runs from Tibet into Sichuan on to Hubei (no terminal in Chongqing). Assumption that full flow capacity of 8 GW exists along the entire route.,- TRNCHNHUCHNSI,CHNHU,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJICHNLI,CHNJI,CHNLI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJICHNNM,CHNJI,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJIPRKXX,CHNJI,PRKXX,CHN,PRK,0,0,-,-,-,https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar,-,-,No concrete plans found for new transmission lines between PRK and China despite growing electricity exports from PRK. TRNCHNJSCHNSC,CHNJS,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJSCHNSD,CHNJS,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJSCHNSH,CHNJS,CHNSH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJSCHNSI,CHNJS,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJSCHNSX,CHNJS,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJSCHNZH,CHNJS,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJXCHNNM,CHNJX,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJXCHNSC,CHNJX,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNJXCHNZH,CHNJX,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNLICHNNM,CHNLI,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNLIPRKXX,CHNLI,PRKXX,CHN,PRK,0,0,-,-,-,https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar,-,-,No concrete plans found for new transmission lines between PRK and China despite growing electricity exports from PRK. TRNCHNNICHNNM,CHNNI,CHNNM,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNICHNSD,CHNNI,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNICHNSI,CHNNI,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNICHNZH,CHNNI,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNMCHNSD,CHNNM,CHNSD,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNMCHNSI,CHNNM,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNMCHNSX,CHNNM,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNMCHNTJ,CHNNM,CHNTJ,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNNMMNGXX,CHNNM,MNGXX,CHN,MNG,0,0,-,-,-,https://www.adb.org/sites/default/files/project-documents/48030/48030-001-tacr-en_4.pdf,-,-,There is interest in additional (higher voltage) transmission interconnections between CHN and MNG but as of yet it doesn't seem that any projects are close to actual development. TRNCHNNMRUSSI,CHNNM,RUSSI,CHN,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNQICHNSC,CHNQI,CHNSC,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNQICHNTI,CHNQI,CHNTI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNQICHNXI,CHNQI,CHNXI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSCCHNSI,CHNSC,CHNSI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSCCHNTI,CHNSC,CHNTI,CHN,CHN,0,8000,800,-,2025,https://www.gov.cn/xinwen/2023-02/16/content_5741824.htm,https://www.seetao.com/details/203205.html,Planned multi-terminal HVDC line that transports hydropowered electricity from Tibet & Sichuan to Hubei. Runs from Tibet into Sichuan on to Hubei (no terminal in Chongqing). Assumption that full flow capacity of 8 GW exists along the entire route.,- TRNCHNSCCHNYU,CHNSC,CHNYU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSCCHNZH,CHNSC,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSDCHNSX,CHNSD,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSDCHNTJ,CHNSD,CHNTJ,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSDKORXX,CHNSD,KORXX,CHN,KOR,0,0,-,-,-,-,-,-,A transmission link between South-Korea and China has been conceptualized as part of a Asian Supergrid concept yet no actual projects have materialized as of yet. TRNCHNSDPRKXX,CHNSD,PRKXX,CHN,PRK,0,0,-,-,-,https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar,-,-,No concrete plans found for new transmission lines between PRK and China despite growing electricity exports from PRK (see sources). TRNCHNSHCHNZH,CHNSH,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNSICHNSX,CHNSI,CHNSX,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNTICHNXI,CHNTI,CHNXI,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNTICHNYU,CHNTI,CHNYU,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNTIINDNE,CHNTI,INDNE,CHN,IND,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,No existing lines/electricity trade between CHN and IND. Also no plans for interconnections to-date. TRNCHNTIINDNO,CHNTI,INDNO,CHN,IND,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,No existing lines/electricity trade between CHN and IND. Also no plans for interconnections to-date. TRNCHNTIMMRXX,CHNTI,MMRXX,CHN,MMR,0,0,-,-,-,-,-,-,No existing plans found for ties between Tibet and Myanmar. Plans exist for further interconnection between Yunnan and Myanmar. TRNCHNTINPLXX,CHNTI,NPLXX,CHN,NPL,0,0,220,-,-,https://mofa.gov.np/joint-statement-between-the-peoples-republic-of-china-and-nepal/,https://nea.org.np/admin/assets/uploads/annual_publications/Transmission_2021-22.pdf,-,Initial plans were constructed to develop a 400 kV-5000 MW intertie yet recent discussions between both system operators have lowered project plans to a 220 kV line with lower power rating. Prospects still exist for the 5000 MW intertie but no concrete plans as of yet. No details on the exact power rating for the 220 kV line can be found nor an indicated completion year. TRNCHNTIPAKXX,CHNTI,PAKXX,CHN,PAK,0,0,-,-,-,-,-,-,"No current lines exist between China and Pakistan, and although there is strong collaboration and multual influences in the energy space no concrete plans as of yet exist for transmission lines." TRNCHNXIINDNO,CHNXI,INDNO,CHN,IND,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,No existing lines/electricity trade between CHN and IND. Also no plans for interconnections to-date. TRNCHNXIKAZXX,CHNXI,KAZXX,CHN,KAZ,0,0,-,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No existing/planned lines on KAZ grid map that is up to date as of 2023. TRNCHNXIKGZXX,CHNXI,KGZXX,CHN,KGZ,0,0,-,-,-,https://en.kabar.kg/news/kyrgyzstan-and-china-deepen-energy-cooperation/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,There are talks about a potential line between KGZ and CHN but this seems to be in early stages of discussion and can't be considered 'planned' as of yet. TRNCHNXIMNGXX,CHNXI,MNGXX,CHN,MNG,0,0,-,-,-,https://www.adb.org/sites/default/files/project-documents/48030/48030-001-tacr-en_4.pdf,-,-,There is interest in additional (higher voltage) transmission interconnections between CHN and MNG but as of yet it doesn't seem that any projects are close to actual development. TRNCHNXIPAKXX,CHNXI,PAKXX,CHN,PAK,0,0,-,-,-,-,-,-,"No current lines exist between China and Pakistan, and although there is strong collaboration and multual influences in the energy space no concrete plans as of yet exist for transmission lines." TRNCHNXIRUSSI,CHNXI,RUSSI,CHN,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNXITJKXX,CHNXI,TJKXX,CHN,TJK,0,0,-,-,-,https://www.iea.org/reports/cross-border-electricity-trading-for-tajikistan-a-roadmap/opportunities-for-electricity-trade,-,-,- TRNCHNYUCHNZH,CHNYU,CHNZH,CHN,CHN,0,0,-,-,-,-,-,No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.,- TRNCHNYULAOXX,CHNYU,LAOXX,CHN,LAO,0,0,500,-,-,https://www.reuters.com/business/energy/china-general-nuclear-enters-agreement-develop-renewable-energy-base-laos-2023-09-18/,-,-,There are plans for a new 500 kV tieline yet no concrete information regarding power ratings/planned commissioning year. TRNCHNYUMMRXX,CHNYU,MMRXX,CHN,MMR,1000,1000,-,-,-,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,https://www.irrawaddy.com/news/burma/myanmar-regime-signs-energy-agreement-with-china.html,-,Intentions exist to realise a 1 GW intertie between Myanmar and Yunnan (was part of a 2018 development plant in Myanmar) but as to-date has not yet materialized. Initial plans for completion were 2025 but this has been delayed. TRNCHNYUVNMNO,CHNYU,VNMNO,CHN,VNM,0,0,-,-,-,"https://southeastasiainfra.com/vietnams-power-development-plan-unlocking-res-potential-to-achieve-energy-transition-goals/#:~:text=These%20lines%20are%20expected%20to,through%20110%20kV%20power%20lines.",https://www.digitimes.com/news/a20230707VL209/digitimes-research-vietnam-ict-manufacturing-meet-the-analyst.html,-,No additional concrete plans found for new lines. TRNCIVXXGHAXX,CIVXX,GHAXX,CIV,GHA,0,0,-,-,-,https://www.au-pida.org/view-project/2005/,-,-,Currently ongoing a reinforcement project TRNCIVXXGINXX,CIVXX,GINXX,CIV,GIN,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNCIVXXLBRXX,CIVXX,LBRXX,CIV,LBR,250,250,220,650,2024,https://www.ecowapp.org/en/tenders/feasibility-study-225kv-wapp-c%C3%B4te-d%E2%80%99ivoire-liberia-transmission-interconnection,-,-,- TRNCIVXXMLIXX,CIVXX,MLIXX,CIV,MLI,690,690,225,-,2025,https://www.ecowapp.org/sites/default/files/2015-2019_business_plan.pdf,https://www.eib.org/en/press/all/2021-138-330-millions-d-eur-de-l-equipe-europe-a-la-construction-de-la-nouvelle-ligne-electrique-de-225-kv-guinee-mali-qui-approvisionnera-en-energie-propre-et-abordable-des-millions-de-personnes-en-afrique-de-l-ouest,-,- TRNCMRXXCOGXX,CMRXX,COGXX,CMR,COG,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S2211467X22001985,-,-,- TRNCMRXXGABXX,CMRXX,GABXX,CMR,GAB,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNCMRXXGNQXX,CMRXX,GNQXX,CMR,GNQ,0,0,225,-,-,https://www.nepad.org/countries/equatorial-guinea,-,"A 3800 km interconnector is planned from DRC to South Africa through Angola, Gabon, and Namibia and to the north to Cameroon, Chad and Equatorial Guinea;but there is no information on a direct interconnector from Cameroon to Equatorial Guinea. Only the planned voltage of the pathway can be found hence capacity values in terms of MW have been left blank.",- TRNCMRXXNGAXX,CMRXX,NGAXX,CMR,NGA,0,0,-,-,-,https://documents1.worldbank.org/curated/en/275701519410850720/pdf/EXT-AUD-REPORT-CLSG-PROJECT-2016-ENG.pdf,-,Potential line between Nigeria-Cameroon reported in the Power Africa report (Appendix A) but besides that no additional information hence the project has not been added as planned project as of yet.,- TRNCMRXXTCDXX,CMRXX,TCDXX,CMR,TCD,200,200,225,1556,2028,https://documents1.worldbank.org/curated/en/482631592619043723/pdf/Cameroon-and-Chad-Power-Interconnection-Project.pdf,https://www.nsenergybusiness.com/projects/cameroon-chad-interconnection-project/,-,- TRNCODXXCOGXX,CODXX,COGXX,COD,COG,0,0,-,-,-,https://www.iea.org/articles/democratic-republic-of-the-congo-energy-outlook,-,-,No information found on new capacity coming online post 2015 study. No new lines visible following 2019 IEA study. TRNCODXXRWAXX,CODXX,RWAXX,COD,RWA,0,0,-,-,-,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-035,-,-,"Planned interconnection as part of the Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Democratic Republic of Congo) has been cancelled, therefore assumed planned capacity values as zero" TRNCODXXSSDXX,CODXX,SSDXX,COD,SSD,0,0,-,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,-,-,No existing lines between COD and SSD and no reported concrete plans within the World Bank Report so existing and planned capacities set to 0. TRNCODXXTZAXX,CODXX,TZAXX,COD,TZA,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNCODXXUGAXX,CODXX,UGAXX,COD,UGA,140,140,220,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,https://www.afdb.org/en/documents/uganda-rdc-220-kv-400kv-uganda-beni-d-r-congo-beni-bunia-butembo-power-interconnection-project-project-information-memorendum,-,- TRNCODXXZMBXX,CODXX,ZMBXX,COD,ZMB,0,0,330,190,-,"https://www.afdb.org/en/documents/drc-kolwezi-zambia-solwezi-330-kv-power-line-interconnection-project-project-information-memorendum#:~:text=The%20proposed%20interconnector%20will%20result,the%20Northwestern%20Province%20of%20Zambia.",-,-,- TRNCOGXXGABXX,COGXX,GABXX,COG,GAB,0,0,-,-,-,"https://www.pietrangeli.com/intgaco-gabon-congo-interconnection-high-voltage-transmission-system/#:~:text=High%20Voltage%20Interconnector,-The%20assignment%2C%20financed&text=In%20particular%2C%20it%20is%20the,110%2F63%20kV%20associated%20substations.",-,-,"No planned capacity or existing capacity. Feasibility studies have been undertaken, but no planned capacity at present." TRNCOLXXECUXX,COLXX,ECUXX,COL,ECU,1500,1500,500,515,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,No completion year to be found for the planned Jamondino - El Inga interconnection. TRNCOLXXPANXX,COLXX,PANXX,COL,PAN,400,400,300,500,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,No expected commissioning year as of now. TRNCOLXXPERXX,COLXX,PERXX,COL,PER,0,0,-,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,No listed planned interconnector projects in the CIER document. TRNCOLXXVENXX,COLXX,VENXX,COL,VEN,0,0,-,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://foreignpolicy.com/2023/01/13/venezuela-colombia-gas-deal-energy-economy-latin-america-maduro-petro/,-,No listed planned interconnector projects in the CIER document. TRNCRIXXNICXX,CRIXX,NICXX,CRI,NIC,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNCRIXXPANXX,CRIXX,PANXX,CRI,PAN,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNCYPXXEGYXX,CYPXX,EGYXX,CYP,EGY,2000,2000,-,-,-,https://www.euroafrica-interconnector.com/,-,-,- TRNCYPXXGRCXX,CYPXX,GRCXX,CYP,GRC,2000,2000,-,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXISRXX,CYPXX,ISRXX,CYP,ISR,2000,2000,-,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXLBNXX,CYPXX,LBNXX,CYP,LBN,0,0,-,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXSYRXX,CYPXX,SYRXX,CYP,SYR,0,0,-,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXTURXX,CYPXX,TURXX,CYP,TUR,0,0,-,-,-,https://cyprus-mail.com/2023/07/02/norths-electricity-deal-with-turkey-as-elusive-as-ever/,-,-,"It seems there's some discussion about a potential interconnector from Northern Cyprus to Turkey, but nothing concrete planned yet." TRNCZEXXDEUXX,CZEXX,DEUXX,CZE,DEU,500,500,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXDEUXX,CZEXX,DEUXX,CZE,DEU,150,150,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXDEUXX,CZEXX,DEUXX,CZE,DEU,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXDEUXX,CZEXX,DEUXX,CZE,DEU,0,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNCZEXXPOLXX,CZEXX,POLXX,CZE,POL,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXSVKXX,CZEXX,SVKXX,CZE,SVK,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXDNKXX,DEUXX,DNKXX,DEU,DNK,1000,1000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXFRAXX,DEUXX,FRAXX,DEU,FRA,300,300,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXFRAXX,DEUXX,FRAXX,DEU,FRA,1500,1500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXGBRXX,DEUXX,GBRXX,DEU,GBR,1400,1400,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXGBRXX,DEUXX,GBRXX,DEU,GBR,1400,1400,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNDEUXXLUXXX,DEUXX,LUXXX,DEU,LUX,1000,1000,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXLUXXX,DEUXX,LUXXX,DEU,LUX,400,400,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXNLDXX,DEUXX,NLDXX,DEU,NLD,1050,1050,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXNLDXX,DEUXX,NLDXX,DEU,NLD,1000,1000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNDEUXXNORXX,DEUXX,NORXX,DEU,NOR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXPOLXX,DEUXX,POLXX,DEU,POL,2000,2000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXPOLXX,DEUXX,POLXX,DEU,POL,400,400,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXSWEXX,DEUXX,SWEXX,DEU,SWE,700,700,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXSWEXX,DEUXX,SWEXX,DEU,SWE,700,700,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDJIXXERIXX,DJIXX,ERIXX,DJI,ERI,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNDJIXXETHXX,DJIXX,ETHXX,DJI,ETH,160,160,230;230,-,2026,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-179,-,Double circuit line with each circuit having a rated capacity of 160 MW. ,- TRNDJIXXSOMXX,DJIXX,SOMXX,DJI,SOM,0,0,-,-,-,-,-,-,As part of the Ethiopia Djibouti Second Power Interconnection Project it has been mentioned that this will open up further possibilities for interconnection with Somalia but it seems like there are no concrete plans as of now. TRNDJIXXYEMXX,DJIXX,YEMXX,DJI,YEM,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X?ref=pdf_download&fr=RR-2&rr=81ba8ea84e943021,-,-,A subsea transmission link between DJI and YEM (400 kV) has been proposed in the past but it seems that there are no concrete plans as of now. TRNDNKXXGBRXX,DNKXX,GBRXX,DNK,GBR,1400,1400,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXGBRXX,DNKXX,GBRXX,DNK,GBR,1400,1400,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNDNKXXNLDXX,DNKXX,NLDXX,DNK,NLD,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXNORXX,DNKXX,NORXX,DNK,NOR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXSWEXX,DNKXX,SWEXX,DNK,SWE,700,700,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDOMXXHTIXX,DOMXX,HTIXX,DOM,HTI,0,0,-,-,-,https://deetkenimpact.com/blog/its-time-for-a-renewable-energy-transition-in-haiti/,-,-,Haiti consists of multiple isolated micogrids with not centralized system nor integration with the Dominican Republic. TRNDZAXXESHXX,DZAXX,ESHXX,DZA,ESH,0,0,-,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXESPXX,DZAXX,ESPXX,DZA,ESP,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNDZAXXFRAXX,DZAXX,FRAXX,DZA,FRA,0,0,-,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXITAXX,DZAXX,ITAXX,DZA,ITA,0,0,-,-,-,-,-,-,"No planned capacity or existing capacity. Feasibility studies have been undertaken, but no planned capacity at present." TRNDZAXXLBYXX,DZAXX,LBYXX,DZA,LBY,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S2096511718300033#f0025,-,-,"Proposed lines as part of the MEDGRID project, but no planned capacity at present." TRNDZAXXMARXX,DZAXX,MARXX,DZA,MAR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNDZAXXMLIXX,DZAXX,MLIXX,DZA,MLI,0,0,-,-,-,https://www.sciencedirect.com/science/article/pii/S2096511723000191,-,-,PG 116 - Planned capacity source which details planned/under-study interconnectors among Med-TSO countries TRNDZAXXMRTXX,DZAXX,MRTXX,DZA,MRT,0,0,-,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXNERXX,DZAXX,NERXX,DZA,NER,0,0,-,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXTUNXX,DZAXX,TUNXX,DZA,TUN,0,0,-,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNECUXXPERXX,ECUXX,PERXX,ECU,PER,500,550,500,574,2024,https://www.sciencedirect.com/science/article/pii/S0378779623000809,https://www.investinperu.pe/RepositorioAPS0/0/2/jer/LT_500KV_PIURA/3_-_Equivalente_externo_el_Sistema_-_Inf_SPL-007_Interconexion_Ecuador_Peru.pdf,"Assumed capacities for the newly planned 500 kV line equals the reported maximum directional flow in 2024 (600 MW ECU - PER, 650 MW PER - ECU) - the existing capacities (100 MW). ",- TRNEGYXXGRCXX,EGYXX,GRCXX,EGY,GRC,5000,0,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNEGYXXISRXX,EGYXX,ISRXX,EGY,ISR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNEGYXXJORXX,EGYXX,JORXX,EGY,JOR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNEGYXXLBYXX,EGYXX,LBYXX,EGY,LBY,500,500,-,-,-,https://www.eia.gov/international/analysis/country/LBY,-,-,- TRNEGYXXSAUXX,EGYXX,SAUXX,EGY,SAU,3000,3000,500,1350,2025,https://www.iea.org/policies/14291-egypt-saudi-electricity-interconnection-project#,https://www.hitachienergy.com/uk-ie/en/about-us/customer-success-stories/saudi-arabia-egypt,-,- TRNEGYXXSDNXX,EGYXX,SDNXX,EGY,SDN,1000,1000,500,170,-,https://www.au-pida.org/view-project/309/,-,-,- TRNERIXXETHXX,ERIXX,ETHXX,ERI,ETH,100,100,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNERIXXSAUXX,ERIXX,SAUXX,ERI,SAU,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,In the past proposed as a conceptual subsea HVDC link but no concrete plans as of now. TRNERIXXSDNXX,ERIXX,SDNXX,ERI,SDN,150,150,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNERIXXYEMXX,ERIXX,YEMXX,ERI,YEM,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNESHXXMARXX,ESHXX,MARXX,ESH,MAR,0,0,400,-,-,https://www.sciencedirect.com/science/article/pii/S0962629823000495#bib85,-,-,- TRNESHXXMRTXX,ESHXX,MRTXX,ESH,MRT,0,0,-,-,-,https://www.res4med.org/wp-content/uploads/2018/06/Country-profile-Marocco-2.pdf,-,-,"Regarding planned capacity, reference provided on pg 20 shows no planned capacity." TRNESPXXFRAXX,ESPXX,FRAXX,ESP,FRA,2200,2200,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESPXXFRAXX,ESPXX,FRAXX,ESP,FRA,1500,1500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESPXXFRAXX,ESPXX,FRAXX,ESP,FRA,1500,1500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNESPXXMARXX,ESPXX,MARXX,ESP,MAR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNESPXXPRTXX,ESPXX,PRTXX,ESP,PRT,1900,1500,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXFINXX,ESTXX,FINXX,EST,FIN,700,700,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXLVAXX,ESTXX,LVAXX,EST,LVA,1100,1100,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXLVAXX,ESTXX,LVAXX,EST,LVA,1000,1000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNESTXXRUSNW,ESTXX,RUSNW,EST,RUS,0,0,-,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNETHXXKENXX,ETHXX,KENXX,ETH,KEN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNETHXXSDNXX,ETHXX,SDNXX,ETH,SDN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNETHXXSSDXX,ETHXX,SSDXX,ETH,SSD,100,100,230,357,-,https://energycapitalpower.com/south-sudan-electricity-ethiopia-100mw-deal/,https://www.afdb.org/en/documents/eoi-ethiopia-ethiopia-south-sudan-230kv-power-system-interconnection-study-project-eep,-,Feasibility study is being commissioned for a 230 kV line interconnecting ETH and SSD with an intial trade agreement in place for 100 MW (that can be ramped up to 400 MW). No clear commissioning year for the line as of yet. TRNFINXXNORXX,FINXX,NORXX,FIN,NOR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFINXXRUSNW,FINXX,RUSNW,FIN,RUS,0,0,-,-,-,https://www.fingrid.fi/globalassets/dokumentit/fi/kantaverkko/kantaverkon-kehittaminen/fingrid_kehittamissuunnitelma_syksy23_en.pdf,-,-,"Historically transmission lines existed between FIN and RUSNW (+320 MW, -1300 MW) but these have been decomissioned as of 2022 following the Ukraine-Russia conflict." TRNFINXXSWEXX,FINXX,SWEXX,FIN,SWE,900,800,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFINXXSWEXX,FINXX,SWEXX,FIN,SWE,1200,1200,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNFRAXXGBRXX,FRAXX,GBRXX,FRA,GBR,1000,1000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXGBRXX,FRAXX,GBRXX,FRA,GBR,4875,4875,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNFRAXXIRLXX,FRAXX,IRLXX,FRA,IRL,700,700,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXITAXX,FRAXX,ITAXX,FRA,ITA,1200,1000,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXLUXXX,FRAXX,LUXXX,FRA,LUX,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGABXXGNQXX,GABXX,GNQXX,GAB,GNQ,0,0,-,-,-,https://www.seetao.com/details/214749.html,-,-,"Contract signed as of 20/05/2023 for the power grid interconnection project between Equatorial Guinea and Gabon by ministry officals. However no specifics regarding MW, voltage found." TRNGBRXXIRLXX,GBRXX,IRLXX,GBR,IRL,1120,1120,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGBRXXIRLXX,GBRXX,IRLXX,GBR,IRL,1250,1250,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNGBRXXISLXX,GBRXX,ISLXX,GBR,ISL,0,0,-,-,-,https://www.ruv.is/frettir/innlent/saestrengur-ekki-lengur-samkeppnishaefur,-,-,Plans for the ICELINK interconnector linking Iceland and Scotland are currently on-hold. TRNGBRXXNLDXX,GBRXX,NLDXX,GBR,NLD,2000,2000,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGBRXXNORXX,GBRXX,NORXX,GBR,NOR,1400,1400,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGEOXXRUSSO,GEOXX,RUSSO,GEO,RUS,1000,1000,500,13,2030,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,-,- TRNGEOXXTURXX,GEOXX,TURXX,GEO,TUR,1050,1050,400,150,2025,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,-,- TRNGHAXXTGOXX,GHAXX,TGOXX,GHA,TGO,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNGINXXGNBXX,GINXX,GNBXX,GIN,GNB,800,800,225,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,"https://www.constructafrica.com/news/west-african-interconnected-grid-nears-completion#:~:text=OMVG%20Interconnection%20Line%20map&text=Guinea%3A%20575km%20of%20lines%2C%20five,load%20dispatching%20centre%20at%20Tambacounda.",-,Planned capacity is in reference to 225 kV OMVG Interconnection Line TRNGINXXLBRXX,GINXX,LBRXX,GIN,LBR,290,290,225,-,-,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-F00-058,-,-,Planned capacity is in reference to CLSG Interconnection. TRNGINXXMLIXX,GINXX,MLIXX,GIN,MLI,500,500,225,714,-,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-149,https://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/Multinational_-_225_KV_Guinea-Mali_Electricity_Interconnection_Project.pdf,-,- TRNGINXXSENXX,GINXX,SENXX,GIN,SEN,800,800,225,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,"https://www.constructafrica.com/news/west-african-interconnected-grid-nears-completion#:~:text=OMVG%20Interconnection%20Line%20map&text=Guinea%3A%20575km%20of%20lines%2C%20five,load%20dispatching%20centre%20at%20Tambacounda.",-,Planned capacity is in reference to 225 kV OMVG Interconnection Line TRNGINXXSLEXX,GINXX,SLEXX,GIN,SLE,290,290,225,-,-,"https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-F00-058#:~:text=Project%20General%20Description,networks%20of%20the%20four%20countries.",-,-,Planned capacity is in reference to (CLSG) Electricity Networks Interconnection Project TRNGMBXXSENXX,GMBXX,SENXX,GMB,SEN,800,800,225,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,"https://www.constructafrica.com/news/west-african-interconnected-grid-nears-completion#:~:text=OMVG%20Interconnection%20Line%20map&text=Guinea%3A%20575km%20of%20lines%2C%20five,load%20dispatching%20centre%20at%20Tambacounda.",-,Planned capacity is in reference to - 225KV OMVG Senegal–The Gambia–Guinea Bissau–Guinea Interconnection Project TRNGNBXXSENXX,GNBXX,SENXX,GNB,SEN,800,800,225,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,"https://www.constructafrica.com/news/west-african-interconnected-grid-nears-completion#:~:text=OMVG%20Interconnection%20Line%20map&text=Guinea%3A%20575km%20of%20lines%2C%20five,load%20dispatching%20centre%20at%20Tambacounda.",-,Planned capacity is in reference to - 225KV OMVG Senegal–The Gambia–Guinea Bissau–Guinea Interconnection Project TRNGRCXXITAXX,GRCXX,ITAXX,GRC,ITA,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRCXXLBYXX,GRCXX,LBYXX,GRC,LBY,2000,2000,-,-,-,https://docstore.entsoe.eu/Documents/TYNDP%20documents/TYNDP%202016/projects/P0284.pdf,-,-,- TRNGRCXXMKDXX,GRCXX,MKDXX,GRC,MKD,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRCXXTURXX,GRCXX,TURXX,GRC,TUR,600,600,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRLXXISLXX,GRLXX,ISLXX,GRL,ISL,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNGTMXXHNDXX,GTMXX,HNDXX,GTM,HND,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNGTMXXMEXXX,GTMXX,MEXXX,GTM,MEX,0,0,-,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,In the CIER document it is mentioned that additional capacity is being studied but no mentioning of capacities nor years. As of yet too preliminary to include. TRNGTMXXSLVXX,GTMXX,SLVXX,GTM,SLV,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNGUFXXSURXX,GUFXX,SURXX,GUF,SUR,0,0,230,370,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,"An interconnection between GUF and SUR is currently being studied as part of the 'Arco Norte' project, yet it is in an early stage and as of yet no data on transmission capacity can be found (only proposed voltage and length of the proposed pathway)." TRNGUYXXSURXX,GUYXX,SURXX,GUY,SUR,0,0,230;230,400,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://www.offshore-technology.com/news/brazil-guyana-and-suriname-to-forge-energy-alliance/?cf-view,-,"An interconnection between GUY and SUR is currently being studied as part of the 'Arco Norte' project, yet it is in an early stage and as of yet no data on transmission capacity can be found (only proposed voltage and length of the proposed pathway)." TRNGUYXXVENXX,GUYXX,VENXX,GUY,VEN,0,0,-,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,No listed interconnector projects operating or planned in the CIER document. TRNHNDXXNICXX,HNDXX,NICXX,HND,NIC,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNHNDXXSLVXX,HNDXX,SLVXX,HND,SLV,300,300,230,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now. TRNHRVXXHUNXX,HRVXX,HUNXX,HRV,HUN,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHRVXXMNEXX,HRVXX,MNEXX,HRV,MNE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHRVXXSRBXX,HRVXX,SRBXX,HRV,SRB,600,600,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHRVXXSVNXX,HRVXX,SVNXX,HRV,SVN,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXROUXX,HUNXX,ROUXX,HUN,ROU,617,335,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXROUXX,HUNXX,ROUXX,HUN,ROU,1020,1734,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNHUNXXSRBXX,HUNXX,SRBXX,HUN,SRB,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXSVKXX,HUNXX,SVKXX,HUN,SVK,800,1300,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXSVNXX,HUNXX,SVNXX,HUN,SVN,1200,1200,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXUKRXX,HUNXX,UKRXX,HUN,UKR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNIDNJWIDNKA,IDNJW,IDNKA,IDN,IDN,0,0,-,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNJWIDNNU,IDNJW,IDNNU,IDN,IDN,1600,1600,500,220,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,"Indicated transfer limit of 2000 MW between Bali and Java as of 2020 following the IESR study, however following the 2021-2030 National Electricity Supply Business Plan of the Indonesian government the new 500 kv, 220 km, 1600 MW project is still marked as in development with no indicated final completetion year. Existing capacity is therefore considered to be 400 MW.",- TRNIDNJWIDNSM,IDNJW,IDNSM,IDN,IDN,3000,3000,500,1070,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,"Indicated transfer limit of 3000 MW between Sumatra and Java as of 2024 following the IESR study, however following the 2021-2030 The National Electricity Supply Business Plan of the Indonesian government the project is still marked as in development. Further reports state that the project is considered a priority project within the upcoming 2024-2034 long-term electricity procurement plan (https://www.thejakartapost.com/business/2023/11/21/ri-eyes-building-java-sumatra-power-transmission-project-with-jetp-funding.html) however no confirmed completion year to be found as of yet. ",- TRNIDNKAIDNSL,IDNKA,IDNSL,IDN,IDN,0,0,-,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNKAMYSSH,IDNKA,MYSSH,IDN,MYS,0,0,-,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No new planned projects visible within the the 2021-2030 The National Electricity Supply Business Plan of the Indonesian government. TRNIDNKAMYSSK,IDNKA,MYSSK,IDN,MYS,0,0,-,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No new planned projects visible within the the 2021-2030 The National Electricity Supply Business Plan of the Indonesian government. TRNIDNMLIDNPP,IDNML,IDNPP,IDN,IDN,0,0,-,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNMLIDNSL,IDNML,IDNSL,IDN,IDN,0,0,-,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNNUIDNSL,IDNNU,IDNSL,IDN,IDN,0,0,-,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNNUTLSXX,IDNNU,TLSXX,IDN,TLS,0,0,-,-,-,https://www.dfdl.com/wp-content/uploads/2016/03/DFDL_Article_The_future_of_hydropower_development_in_Timor_Leste_Walter_Heiser.pdf,https://www.mdpi.com/1996-1073/12/8/1441,-,Report mentions the interest of facilitating a tie line between West-Timor (Indonesia) and TLS to facilitate the export of hydro-electricity but no concrete plans as of yet that can be found. TRNIDNPPPNGXX,IDNPP,PNGXX,IDN,PNG,0,0,-,-,-,https://hir.harvard.edu/electrification-in-papua-new-guinea/,-,-,"Papua New Guinea is just undergoing national electrification now, and as a result there are no current or planned interconnections with Indonesia or other countries." TRNIDNSMMYSPE,IDNSM,MYSPE,IDN,MYS,0,0,-,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,"There are plans for a potential 500 kV HVDC subsea interconnector between Sumatra and peninsular Malaysia. Althoug pending for years, it does not seem like the project is at a stage yet to include it as definitive 'planned' capacities." TRNIDNSMSGPXX,IDNSM,SGPXX,IDN,SGP,0,0,-,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,"There are plans for a potential 500 kV HVDC subsea interconnector between Sumatra and Singapore. Althoug pending for years, it does not seem like the project is at a stage yet to include it as definitive 'planned' capacities." TRNINDEAINDNE,INDEA,INDNE,IND,IND,670,670,400;220,-,2023,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,-,670 MW planned transmission capacity is for the 'Birpara/Alipurduar - Salakati 220kV D/c' and 'Siliguri - Bongaigaon 400kV D/c' projects which involves upgrades/modifications of existing lines with assumed later completion year of 2023 (2022-2023 estimate in ISTS Rolling Plan). TRNINDEAINDNO,INDEA,INDNO,IND,IND,0,0,-,-,-,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,-,- TRNINDEAINDSO,INDEA,INDSO,IND,IND,0,0,-,-,-,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,-,- TRNINDEAINDWE,INDEA,INDWE,IND,IND,1600,1600,400,160,2025,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,-,1600 MW planned transmission capacity is for the 'Jeypore - Jagdalpur 400 kV D/c' project with assumed later completion year of 2025 (2024-2025 estimate in ISTS Rolling Plan). TRNINDEANPLXX,INDEA,NPLXX,IND,NPL,300,300,-,-,2024,https://kathmandupost.com/national/2023/09/21/nepal-india-reach-deal-on-boosting-cross-border-power-transmission,-,Internal 400 kV within Nepal is being build which will allow the NTC for the existing 400 kV line into India (Dhalkebar-Muzaffarpur) to be increased to 1 GW (agreements are in place). This 300 MW of additional NTC is added as new planned capacity for 2024. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).,- TRNINDEANPLXX,INDEA,NPLXX,IND,NPL,2000,2000,400,-,2028,https://myrepublica.nagariknetwork.com/news/india-agrees-to-expedite-construction-of-a-number-of-cross-border-transmission-lines-to-facilitate-bilateral-energy-trade-with-nepal/,"https://kathmandupost.com/national/2023/08/11/construction-of-new-cross-border-power-line-may-start-in-two-months#:~:text=Butwal%2DGorakhpur%20Cross%20Border%20Power%20Transmission%20Limited%20is%20an%20equal,power%20line%20by%20March%202025.",Planned 400 kV line (Duhabi-Purnia) planned for 27/28 (later year assumed) at max 2 GW. ,- TRNINDNEINDNO,INDNE,INDNO,IND,IND,0,0,-,-,-,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,-,- TRNINDNEMMRXX,INDNE,MMRXX,IND,MMR,0,0,-,-,-,https://www.reuters.com/business/energy/india-aims-trade-electricity-with-southeast-asia-sources-2023-07-21/,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,-,"Additional transmission capacity between IND and MMR is considered, with extensions to THA, to among others facilitate trade between India and South-East Asia. No concrete plans as of yet to be found." TRNINDNOINDWE,INDNO,INDWE,IND,IND,1600,1600,400,260,2024,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,1600 MW planned transmission capacity is for the 'Neemuch-Chittorgarh 400 kV D/c' project with assumed later completion year of 2024 (2023-2024 estimate in ISTS Rolling Plan).,- TRNINDNOINDWE,INDNO,INDWE,IND,IND,8400,8400,765;765,660;500,2026,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,8400 MW planned transmission capacity is for the 'Neemuch7 (Mandsaur PS) -Jalore 765 kV D/c' and 'Neemuch7 (Mandsaur PS) -Beawar 765 kV D/c' projects with assumed later completion year of 2026 (2025-2026 estimate in ISTS Rolling Plan).,- TRNINDNOINDWE,INDNO,INDWE,IND,IND,4200,4200,765,-,2028,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,"4200 MW planned transmission capacity is for the 'Chittorgarh-Indore 765 kV D/c' project. No expected completion year can be found for this project. However, considering that its capacity is included in the total 'Capacity by 2027-28' between North and West India in the ISTS Rolling Plan we assume the latest possible completion year following the Plan horizon (2028).",- TRNINDNONPLXX,INDNO,NPLXX,IND,NPL,0,0,132,-,2024,-,-,New 132 kv line planned for 2024 (Kohalpur-Nanpara) but MW capacity is unkown. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).,- TRNINDNONPLXX,INDNO,NPLXX,IND,NPL,3500,3500,400,-,2025,https://economictimes.indiatimes.com/news/india/india-nepal-agree-to-add-200-mw-to-dhalkebar-muzaffarpur-transmission-line/articleshow/98069969.cms,"https://kathmandupost.com/national/2023/08/11/construction-of-new-cross-border-power-line-may-start-in-two-months#:~:text=Butwal%2DGorakhpur%20Cross%20Border%20Power%20Transmission%20Limited%20is%20an%20equal,power%20line%20by%20March%202025.",-,New 400 kV line (Butwal-Gorakhpur) planned for 2025 at max 3.5 GW. TRNINDNONPLXX,INDNO,NPLXX,IND,NPL,2000,2000,400,-,2029,https://myrepublica.nagariknetwork.com/news/india-agrees-to-expedite-construction-of-a-number-of-cross-border-transmission-lines-to-facilitate-bilateral-energy-trade-with-nepal/,"https://kathmandupost.com/national/2023/08/11/construction-of-new-cross-border-power-line-may-start-in-two-months#:~:text=Butwal%2DGorakhpur%20Cross%20Border%20Power%20Transmission%20Limited%20is%20an%20equal,power%20line%20by%20March%202025.",Planned 400 kV line (Dodhara-Bareli) planned for 28/29 (later year assumed) at max 2 GW. ,- TRNINDNOPAKXX,INDNO,PAKXX,IND,PAK,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,There is the potential for power exchange between IND and PAK (and this has been tested historically) yet currently no active power exchange. TRNINDSOINDWE,INDSO,INDWE,IND,IND,4200,4200,765,664,2024,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,4200 MW planned transmission capacity is for the 'Warora Pool - Warangal (New) 765kV D/c' project with assumed later completion year of 2024 (2023-2024 estimate in ISTS Rolling Plan).,- TRNINDSOINDWE,INDSO,INDWE,IND,IND,4200,4200,765,680,2025,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,4200 MW planned transmission capacity is for the 'Narendra-Pune 765 kV D/c' project with assumed later completion year of 2025 (2024-2025 estimate in ISTS Rolling Plan).,- TRNINDSOINDWE,INDSO,INDWE,IND,IND,1600,1600,400,187.35,2026,https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf,-,1600 MW planned transmission capacity is for the 'LILO of Narendra - Narendra (New) 400kV (Quad) line at Xeldam (Goa) ' project with assumed later completion year of 2026 (2025-2026 estimate in ISTS Rolling Plan).,- TRNINDSOLKAXX,INDSO,LKAXX,IND,LKA,500,500,-,-,-,https://economictimes.indiatimes.com/news/india/india-sri-lanka-renew-bid-to-link-power-grids/articleshow/102546949.cms?from=mdr,-,-,- TRNINDWEOMNXX,INDWE,OMNXX,IND,OMN,0,0,-,-,-,https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m,-,-,A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for a potential link to India which is a conceptual project that has been researched within the scientific community. TRNINDWEPAKXX,INDWE,PAKXX,IND,PAK,0,0,-,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,There is the potential for power exchange between IND and PAK (and this has been tested historically) yet currently no active power exchange nor any pending developments mentioned on the website of the ministry of power of the Indian government. TRNINDWESAUXX,INDWE,SAUXX,IND,SAU,0,0,-,-,-,https://www.siasat.com/india-planning-power-grid-with-saudi-arabia-uae-via-undersea-cable-2576846/,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,"No existing or planned capacity as of yet, but a subsea transmission line is being considered between both countries as part of the One Sun, One World, One Grid initiative." TRNIRNXXIRQXX,IRNXX,IRQXX,IRN,IRQ,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNIRNXXOMNXX,IRNXX,OMNXX,IRN,OMN,0,0,-,-,-,https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m,-,-,A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for a potential link to Iran which is a conceptual project that has been researched within the scientific community only. TRNIRNXXPAKXX,IRNXX,PAKXX,IRN,PAK,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNIRNXXTKMXX,IRNXX,TKMXX,IRN,TKM,500,500,500,-,-,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,https://orient.tm/en/post/54478/capacity-power-transmission-systems-between-iran-and-turkmenistan-will-double,-,New HVDC back-to-back connection between IRN and TKM is being planned yet no expected commissioning year has been found. TRNIRNXXTURXX,IRNXX,TURXX,IRN,TUR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNIRQXXJORXX,IRQXX,JORXX,IRQ,JOR,500,500,-,-,-,https://www.enerdata.net/jordan-projects-electricity-transmission.html,-,-,- TRNIRQXXKWTXX,IRQXX,KWTXX,IRQ,KWT,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNIRQXXSAUXX,IRQXX,SAUXX,IRQ,SAU,1000,1000,400,435,2024,https://renewablewatch.in/2023/08/30/transmission-ties-saudi-arabias-regional-connections/,-,-,- TRNIRQXXSYRXX,IRQXX,SYRXX,IRQ,SYR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNIRQXXTURXX,IRQXX,TURXX,IRQ,TUR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNISRXXJORXX,ISRXX,JORXX,ISR,JOR,0,600,-,-,-,https://www.gov.il/en/departments/news/press_081122,-,-,- TRNISRXXLBNXX,ISRXX,LBNXX,ISR,LBN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNISRXXSYRXX,ISRXX,SYRXX,ISR,SYR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNITAXXMLTXX,ITAXX,MLTXX,ITA,MLT,200,200,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNITAXXMNEXX,ITAXX,MNEXX,ITA,MNE,600,600,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXSVNXX,ITAXX,SVNXX,ITA,SVN,10,50,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXSVNXX,ITAXX,SVNXX,ITA,SVN,1000,1000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNITAXXTUNXX,ITAXX,TUNXX,ITA,TUN,600,600,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXTUNXX,ITAXX,TUNXX,ITA,TUN,2000,2000,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNJORXXSAUXX,JORXX,SAUXX,JOR,SAU,450,450,400,164,2025,https://www.enerdata.net/jordan-projects-electricity-transmission.html,https://renewablewatch.in/2023/08/30/transmission-ties-saudi-arabias-regional-connections/,-,- TRNJORXXSYRXX,JORXX,SYRXX,JOR,SYR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNJPNCEJPNKY,JPNCE,JPNKY,JPN,JPN,0,0,-,-,-,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,- TRNJPNCEJPNSH,JPNCE,JPNSH,JPN,JPN,0,0,-,-,-,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,- TRNJPNCEJPNTO,JPNCE,JPNTO,JPN,JPN,900,900,-,-,2028,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,- TRNJPNCEKORXX,JPNCE,KORXX,JPN,KOR,0,0,-,-,-,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,Historically there has been interest in an interconnector between Japan and Korea as part of numerous Asian Supergrid projects but as of yet no concrete developments. TRNJPNHOJPNTO,JPNHO,JPNTO,JPN,JPN,300,300,250,-,2028,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,- TRNJPNHORUSFE,JPNHO,RUSFE,JPN,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,"Historically there was interest in a 'power bridge' between Hokkadio and Sakhalin but this has never been formalized. No mentioning of any Japan links within the ""the scheme and program for the development of the Unified Energy System of Russia for 2022 - 2028.""" TRNJPNKYKORXX,JPNKY,KORXX,JPN,KOR,0,0,-,-,-,https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar,-,-,Historically there has been interest in an interconnector between Japan and Korea as part of numerous Asian Supergrid projects but as of yet no concrete developments. TRNKAZXXKGZXX,KAZXX,KGZXX,KAZ,KGZ,0,0,-,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ,No planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXRUSCE,KAZXX,RUSCE,KAZ,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXRUSMV,KAZXX,RUSMV,KAZ,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXRUSSI,KAZXX,RUSSI,KAZ,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXRUSSO,KAZXX,RUSSO,KAZ,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXRUSUR,KAZXX,RUSUR,KAZ,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXTKMXX,KAZXX,TKMXX,KAZ,TKM,0,0,-,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXUZBXX,KAZXX,UZBXX,KAZ,UZB,0,0,-,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No planned lines on KAZ grid map that is up to date as of 2023. TRNKENXXSOMXX,KENXX,SOMXX,KEN,SOM,0,0,-,-,-,https://www.ketraco.co.ke/transmission/eastern-africa-power-pools,https://www.ketraco.co.ke/transmission/eastern-africa-power-pools,-,Kenya Power has not listed a regional interconnector. TRNKENXXSSDXX,KENXX,SSDXX,KEN,SSD,0,0,-,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,-,-,No reported concrete plans within the World Bank Report. TRNKENXXTZAXX,KENXX,TZAXX,KEN,TZA,2000,2000,400,507.5,2024,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-052,-,-,- TRNKENXXUGAXX,KENXX,UGAXX,KEN,UGA,155,155,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNKGZXXTJKXX,KGZXX,TJKXX,KGZ,TJK,1300,1300,-,-,2025,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.asiaplustj.info/en/news/tajikistan/economic/20210402/kyrgyz-energy-official-considers-that-casa-1000-project-can-be-concluded-only-by-2025,-,- TRNKGZXXUZBXX,KGZXX,UZBXX,KGZ,UZB,0,0,-,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No planned lines on KAZ grid map that is up to date as of 2023 and includes major lines of KGZ and UZB. TRNKHMXXLAOXX,KHMXX,LAOXX,KHM,LAO,0,0,-,-,-,https://laotiantimes.com/2023/01/06/laos-cambodia-to-cooperate-in-power-transmission-line-project/,https://openresearchsoftware.metajnl.com/articles/10.5334/jors.302,-,There is ambition for total transmission capacity between both countries to reach 6 GW by 2030 but no specific addititional projects can be found as of yet hence these estimated capacities are not included. TRNKHMXXTHAXX,KHMXX,THAXX,KHM,THA,0,0,500,-,-,https://www.phnompenhpost.com/business/studies-500kv-transmission-line-drag,https://openresearchsoftware.metajnl.com/articles/10.5334/jors.302,-,"A new 500 kV line between the Cambodian-Thai border to the Battambang substation (Cambodia) is being studied, but delays in its development means that as of yet there is no defined expected completion year nor detailed information on potential transmission capacity." TRNKHMXXVNMCE,KHMXX,VNMCE,KHM,VNM,0,0,-,-,-,https://xaydungchinhsach.chinhphu.vn/toan-van-quy-hoach-phat-trien-dien-luc-quoc-gia-11923051616315244.htm,https://openresearchsoftware.metajnl.com/articles/10.5334/jors.302,-,No mentioning of new potential lines between Cambodia and Vietnam in Vietnam's Power Development Plan VIII. TRNKHMXXVNMSO,KHMXX,VNMSO,KHM,VNM,0,0,-,-,-,https://xaydungchinhsach.chinhphu.vn/toan-van-quy-hoach-phat-trien-dien-luc-quoc-gia-11923051616315244.htm,https://openresearchsoftware.metajnl.com/articles/10.5334/jors.302,-,No mentioning of new potential lines between Cambodia and Vietnam in Vietnam's Power Development Plan VIII. TRNKORXXPRKXX,KORXX,PRKXX,KOR,PRK,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNKOSXXMKDXX,KOSXX,MKDXX,KOS,MKD,0,0,-,-,-,https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf,-,-,No mentioning of new capacity in Kosovo's TSO's network development plan. TRNKOSXXMNEXX,KOSXX,MNEXX,KOS,MNE,0,0,-,-,-,https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf,-,-,No mentioning of new capacity in Kosovo's TSO's network development plan. TRNKOSXXSRBXX,KOSXX,SRBXX,KOS,SRB,0,0,-,-,-,https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf,-,-,No mentioning of new capacity in Kosovo's TSO's network development plan. TRNKWTXXSAUXX,KWTXX,SAUXX,KWT,SAU,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,- TRNLAOXXMMRXX,LAOXX,MMRXX,LAO,MMR,600,600,230,230,2026,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,-,-,MoU signed in 2023 for transmission capacity of 600 MW to be reached by 2026. TRNLAOXXTHAXX,LAOXX,THAXX,LAO,THA,0,0,-,-,-,https://openjicareport.jica.go.jp/pdf/12328027_01.pdf,https://www.reccessary.com/en/news/th-environment/thailand-may-import-more-green-energy-from-Laos,"A MOU exists between both countries to aim for a total export of 9000 MW from Laos to Thailand by 2030, however exact projects to faciliate these numbers have not been been specificied. The JICA report indicates that Thailand's autorities expect an increase in import of 700 MW every two years from all neighbouring countries combined (but not exactly how much from Laos). Furthermore, complicating factors such as ecology concerns affect the speed at which new hydro developments (and resulting imports) can be commissioned. Thailand's Power Purchase Plan 2023 which should be released soon might provide more insights on expected transmission developments on the short to medium term, however as of yet no concrete plans/values can be found so no new planned capacity has been added.",- TRNLAOXXVNMCE,LAOXX,VNMCE,LAO,VNM,2036,0,-,-,2025,https://openjicareport.jica.go.jp/pdf/12328027_01.pdf,-,"Following Table 6.2-12 and Table 6.2-13 in the JICA report, 2574 MW (970+869+735) of generating capacity (mostly hydro) is designated for export purposes to VNMCE by latest 2025 including transmission developments to support said exports. We assume that this equals the available transmission capacity by 2025 - the already existing 538 MW. Given that these developments are specifically marked for export purposes with lines running from specific powerplants we assume that available transmission capacity is solely unidirectional. A MOU exists between both countries to export 5000 MW from Laos to Vietnam by 2030, however it is not specified to which parts of Vietnam this export is expected nor the status of developments post 2025 hence beyond the 2025 values we do not include any additional planned capacities.",- TRNLAOXXVNMNO,LAOXX,VNMNO,LAO,VNM,1032,0,-,-,2025,https://openjicareport.jica.go.jp/pdf/12328027_01.pdf,-,"Following Table 6.2-12 in the JICA report, 1032 ('Total' + HPP Nam Ou 3 210 MW) MW of generating capacity (mostly hydro) is designated for export purposes to VNMNO by latest 2025 including transmission developments to support said exports. We assume that this equals the available transmission capacity by 2025. Given that these developments are specifically marked for export purposes with lines running from specific powerplants we assume that available transmission capacity is solely unidirectional. A MOU exists between both countries to export 5000 MW from Laos to Vietnam by 2030, however it is not specified to which parts of Vietnam this export is expected nor the status of developments post 2025 hence beyond the 2025 values we do not include any additional planned capacities.",- TRNLBNXXSYRXX,LBNXX,SYRXX,LBN,SYR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLBRXXSLEXX,LBRXX,SLEXX,LBR,SLE,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLBYXXMLTXX,LBYXX,MLTXX,LBY,MLT,0,0,-,-,-,-,-,-,"LBY and MLT have signed an MoU on an interconnector, but no formalised plans have been developed as of yet." TRNLBYXXNERXX,LBYXX,NERXX,LBY,NER,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLBYXXSDNXX,LBYXX,SDNXX,LBY,SDN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLBYXXTCDXX,LBYXX,TCDXX,LBY,TCD,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLBYXXTUNXX,LBYXX,TUNXX,LBY,TUN,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLSOXXZAFXX,LSOXX,ZAFXX,LSO,ZAF,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNLTUXXLVAXX,LTUXX,LVAXX,LTU,LVA,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLTUXXPOLXX,LTUXX,POLXX,LTU,POL,500,500,-,-,2025,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLTUXXPOLXX,LTUXX,POLXX,LTU,POL,500,1000,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLTUXXRUSNW,LTUXX,RUSNW,LTU,RUS,0,0,-,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNLTUXXSWEXX,LTUXX,SWEXX,LTU,SWE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLVAXXRUSNW,LVAXX,RUSNW,LVA,RUS,0,0,-,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNLVAXXSWEXX,LVAXX,SWEXX,LVA,SWE,500,500,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMARXXPRTXX,MARXX,PRTXX,MAR,PRT,1000,1000,-,-,-,https://med-tso.org/wp-content/uploads/2022/02/MA-PT_project_sheet.pdf,-,-,- TRNMDAXXROUXX,MDAXX,ROUXX,MDA,ROU,200,200,400,142,2026,https://www.economica.net/linia-electrica-suceava-balti-prin-care-reteaua-republicii-moldova-se-leaga-la-cea-romaneaca-pe-lista-cu-proiecte-propuse-de-romania-pentru-finantare-din-repowereu_655289.html,-,-,- TRNMDAXXUKRXX,MDAXX,UKRXX,MDA,UKR,0,0,-,-,-,https://www.atlanticcouncil.org/blogs/ukrainealert/disarming-russias-energy-weapon-ukraine-begins-electricity-exports-to-moldova/,-,-,- TRNMEXXXUSAAZ,MEXXX,USAAZ,MEX,USA,300,300,230,32,2024,https://www.transcanyon.com/projects/Sonora-Crossing/default.aspx,-,-,- TRNMEXXXUSACI,MEXXX,USACI,MEX,USA,0,0,-,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,As of now no new concrete plans for transmission links between Mexico and California. Baja Californica is not integrated with SIN which limits potential for new projects except for connections with individual plants. TRNMEXXXUSAEP,MEXXX,USAEP,MEX,USA,0,0,-,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,- TRNMEXXXUSAER,MEXXX,USAER,MEX,USA,0,0,-,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,No new lines planned as of now since existing lines fall outside FERC plenary jurisdiction but that is different with potential new lines. TRNMEXXXUSAII,MEXXX,USAII,MEX,USA,0,0,-,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,As of now no new concrete plans for transmission links between Mexico and California. Baja Californica is not integrated with SIN which limits potential for new projects except for connections with individual plants. TRNMEXXXUSAPN,MEXXX,USAPN,MEX,USA,0,0,-,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,- TRNMKDXXSRBXX,MKDXX,SRBXX,MKD,SRB,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMLIXXMRTXX,MLIXX,MRTXX,MLI,MRT,0,0,225,-,-,https://www.afdb.org/en/news-and-events/press-releases/development-partners-express-support-900-million-mauritania-mali-power-line-63179,-,-,"Planned Capacity is in reference to Mauritania-Mali transmission line, which form part of the Trans-Sahel Spine. MW values not yet publicly avaliable." TRNMLIXXNERXX,MLIXX,NERXX,MLI,NER,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,No listed planned projects in the WAPP Master Plan 2020-2023. TRNMLIXXSENXX,MLIXX,SENXX,MLI,SEN,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNMLTXXTUNXX,MLTXX,TUNXX,MLT,TUN,250,250,-,-,-,https://www.tunur.tn/500mw-solar-export-from-tunisia-to-europe/transmission/,-,-,- TRNMMRXXTHAXX,MMRXX,THAXX,MMR,THA,0,0,-,-,-,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,-,-,"No mentioning of potential lines between Myanmar and Thailand in World bank report. Although historically proposed, ongoing conflicts in Myanmar makes the planning of large projects complicated." TRNMNEXXSRBXX,MNEXX,SRBXX,MNE,SRB,20,500,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMNEXXSRBXX,MNEXX,SRBXX,MNE,SRB,500,500,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMNEXXSRBXX,MNEXX,SRBXX,MNE,SRB,240,840,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNMNGXXRUSSI,MNGXX,RUSSI,MNG,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,- TRNMOZXXMWIXX,MOZXX,MWIXX,MOZ,MWI,50,50,400,218,-,https://africa-energy-portal.org/news/construction-mozambique-malawi-power-transmission-link-begins,https://www.escom.mw/moma_page.php,-,- TRNMOZXXSWZXX,MOZXX,SWZXX,MOZ,SWZ,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNMOZXXTZAXX,MOZXX,TZAXX,MOZ,TZA,0,0,400,200,-,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-190,https://www.afdb.org/en/documents/mozambique-tanzania-interconnector-project-project-information-memorendum,-,- TRNMOZXXZAFXX,MOZXX,ZAFXX,MOZ,ZAF,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNMOZXXZMBXX,MOZXX,ZMBXX,MOZ,ZMB,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNMOZXXZWEXX,MOZXX,ZWEXX,MOZ,ZWE,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNMRTXXSENXX,MRTXX,SENXX,MRT,SEN,0,0,-,-,-,https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf,-,-,No additional projects between MRT and SEN identified as of yet. TRNMWIXXTZAXX,MWIXX,TZAXX,MWI,TZA,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,"https://www.escom.mw/All%20set%20for%20signing%20of%20Tanzania-Malawi%20Interconnector%20MoU.php#:~:text=Malawi%20and%20Tanzania%20are%20set,on%20Wednesday%2C%20August%209%202023.",-,No planned interconnector on SAPP interconnector website. However in the process of signing an MOU. TRNMWIXXZMBXX,MWIXX,ZMBXX,MWI,ZMB,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNMYSPEMYSSK,MYSPE,MYSSK,MYS,MYS,0,0,-,-,-,https://theedgemalaysia.com/node/692766,-,-,A subsea link connecting Sarawak with peninsular Malaysia (and/or Singapore) is being considered but has as of yet not been formalized. TRNMYSPESGPXX,MYSPE,SGPXX,MYS,SGP,0,0,-,-,-,"https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.",-,-,Except for discussions about a transmission link between Sarawak (MYSSK) and Singapore no plans found regarding planned transmission capacity. TRNMYSPETHAXX,MYSPE,THAXX,MYS,THA,0,0,-,-,-,"https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.",-,-,- TRNMYSSHMYSSK,MYSSH,MYSSK,MYS,MYS,0,50,275,31,2024,https://www.reuters.com/business/energy/malaysias-sarawak-energy-plans-400mw-floating-solar-capacity-by-2030-2023-06-27/,http://energy.bernama.com/news.php?id=1990037,Agreements in place to enable export of between 30-50 MW from Sarawak to Sabah through a new 275 kV transmission line. We assumed the higher value of 50 MW and a unilateral flow given that this is specficially dedicated to support the energy needs in Sabah. ,- TRNMYSSHPHLLU,MYSSH,PHLLU,MYS,PHL,0,0,-,-,-,https://www.ngcp.ph/Attachment-Uploads/Transmission%20Development%20Plan%202022-2040%20Consultation%20Draft_Web_Final-2022-03-04-10-02-48.pdf,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,-,"As part of the ASEAN supergrid development, there has been historical interest to integrate Sabah with the Philipines through a 500 kV subsea transmission line. However, these plans as of yet have not been formalized into a project that is close to actual development. E.g. the project is not included in the 2022-2040 transmission development plan of the Philipines. " TRNNAMXXZAFXX,NAMXX,ZAFXX,NAM,ZAF,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNNAMXXZMBXX,NAMXX,ZMBXX,NAM,ZMB,0,0,-,-,-,https://www.sapp.co.zw/interconnectors,-,-,No planned interconnector on SAPP interconnector website. TRNNERXXNGAXX,NERXX,NGAXX,NER,NGA,450,450,330,-,2024,https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-146,-,-,- TRNNERXXTCDXX,NERXX,TCDXX,NER,TCD,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNNGAXXTCDXX,NGAXX,TCDXX,NGA,TCD,0,0,-,-,-,https://infrastructuremag.com.ng/2021/12/06/regional-integration-nigeria-to-extend-electricity-to-chad/,-,-,"Planned line has been announced. But no details on voltage, capacity as of yet." TRNNGAXXTGOXX,NGAXX,TGOXX,NGA,TGO,0,0,-,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,No planned interconnector on WAPP Master Plan TRNNLDXXNORXX,NLDXX,NORXX,NLD,NOR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNNORXXRUSNW,NORXX,RUSNW,NOR,RUS,0,0,-,-,-,-,-,-,NOR has disconnected the small existing line (50 MW) with RUS as of 2022 with no new plans. TRNNORXXSWEXX,NORXX,SWEXX,NOR,SWE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNOMNXXPAKXX,OMNXX,PAKXX,OMN,PAK,0,0,-,-,-,https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m,-,-,A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for a potential link to Pakistan which is a conceptual project that has been researched within the scientific community. TRNOMNXXSAUXX,OMNXX,SAUXX,OMN,SAU,1200,1200,400,700,-,https://renewablewatch.in/2023/08/30/transmission-ties-saudi-arabias-regional-connections/,-,-,- TRNOMNXXYEMXX,OMNXX,YEMXX,OMN,YEM,0,0,-,-,-,https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m,-,-,A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for a potential link to Yemen. TRNPAKXXTJKXX,PAKXX,TJKXX,PAK,TJK,1300,1300,-,750,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,"Following the specifics of the CASA-1000 project in the IEA report, the HVDC link from TJK to PAK will only transit through AFG (with transit charges) but not for power supply between TJK and AFG. New line is far in development, but finalization is stalled due to political unrest in Afghanistan. " TRNPHLLUPHLVI,PHLLU,PHLVI,PHL,PHL,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNPHLMIPHLVI,PHLMI,PHLVI,PHL,PHL,450,450,-,-,2024,https://businessmirror.com.ph/2024/01/08/unanswered-power-issues-amid-ngcps-vanishing-act/,-,-,Mindanao-Visayas Interconnection not yet fully energized but is expected to occur early 2024. TRNPOLXXSVKXX,POLXX,SVKXX,POL,SVK,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNPOLXXSWEXX,POLXX,SWEXX,POL,SWE,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNPOLXXUKRXX,POLXX,UKRXX,POL,UKR,0,0,-,-,-,-,-,-,New 400 kV line entered service in 2023. UKR synchronized with POL (ENTSOE) with further expansion to be expected but no concrete plans can be found as of yet. TRNPRKXXRUSFE,PRKXX,RUSFE,PRK,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,- TRNQATXXSAUXX,QATXX,SAUXX,QAT,SAU,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,- TRNROUXXSRBXX,ROUXX,SRBXX,ROU,SRB,844,600,-,-,2030,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNROUXXSRBXX,ROUXX,SRBXX,ROU,SRB,622,347,-,-,2040,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNROUXXSRBXX,ROUXX,SRBXX,ROU,SRB,844,600,-,-,2045,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,"The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.",- TRNROUXXUKRXX,ROUXX,UKRXX,ROU,UKR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNRUSCERUSMV,RUSCE,RUSMV,RUS,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,No planned capacities reported in Russian development plan (translated from Russian).,- TRNRUSCERUSNW,RUSCE,RUSNW,RUS,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,No planned capacities reported in Russian development plan (translated from Russian).,- TRNRUSCERUSSO,RUSCE,RUSSO,RUS,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,No planned capacities reported in Russian development plan (translated from Russian).,- TRNRUSCEUKRXX,RUSCE,UKRXX,RUS,UKR,0,0,-,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,UKR historically was connected with BLR and RUS but disconnected early 2022. TRNRUSFERUSSI,RUSFE,RUSSI,RUS,RUS,450,350,220;220,324;239,2028,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Planned capacities by 2028 are given on the bottom of the page of the provided source (translated from Russian). Proposed capacities beyond 2028 are not included given that the capacities are suggested projects which are as of yet not being implemented.,- TRNRUSMVRUSUR,RUSMV,RUSUR,RUS,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,No planned capacities reported in Russian development plan (translated from Russian).,- TRNRUSNWRUSUR,RUSNW,RUSUR,RUS,RUS,0,0,-,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,No planned capacities reported in Russian development plan (translated from Russian).,- TRNRUSSIRUSUR,RUSSI,RUSUR,RUS,RUS,0,0,500,380,2028,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Planned capacity consists of a planned 500 kV line between the Kurgan region (RUSUR) and the Tyumen region (RUSSI). No values in MW provided by the relevant source (translated from Russian).,- TRNRUSSOUKRXX,RUSSO,UKRXX,RUS,UKR,0,0,-,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,-,-,UKR historically was connected with BLR and RUS but disconnected early 2022. TRNRWAXXTZAXX,RWAXX,TZAXX,RWA,TZA,200,200,-,-,-,https://www.theeastafrican.co.ke/tea/business/uganda-rwanda-power-projects-back-on-track-4236150,-,-,- TRNRWAXXUGAXX,RWAXX,UGAXX,RWA,UGA,400,400,220,93.5,-,https://africa-energy-portal.org/news/rwanda-uganda-400mw-energy-deal,-,-,- TRNSAUXXSDNXX,SAUXX,SDNXX,SAU,SDN,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,A potential link between Saudi Arabia and Sudan is a conceptual project that has been researched within the scientific community in the past. No existing or planned projects as of yet. TRNSAUXXYEMXX,SAUXX,YEMXX,SAU,YEM,0,0,-,-,-,https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/,-,-,- TRNSDNXXSSDXX,SDNXX,SSDXX,SDN,SSD,0,0,-,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,-,-,No reported concrete plans for new projects within the World Bank Report. TRNSDNXXTCDXX,SDNXX,TCDXX,SDN,TCD,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNSOMXXYEMXX,SOMXX,YEMXX,SOM,YEM,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNSSDXXUGAXX,SSDXX,UGAXX,SSD,UGA,600,600,400,308,-,https://www.mediacentre.go.ug/sites/default/files/media/UGANDA%20TO%20DEVELOP%20308KM%20POWER%20LINE%20TO%20SOUTH%20SUDAN.pdf,https://observer.ug/news/headlines/78336-uganda-south-sudan-sign-power-export-agreement,-,Feasibility study is currently being conducted for a 400 kV line between SSD and UGA. A power sales agreement has been signed for the export of electricity from UGA to SSD for the supply of hydro-electricity (600 MW Karuma power plant). No clear commissioning year for the line as of yet. TRNSVKXXUKRXX,SVKXX,UKRXX,SVK,UKR,0,0,-,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNSWZXXZAFXX,SWZXX,ZAFXX,SWZ,ZAF,0,0,0,0,-,https://www.sapp.co.zw/interconnectors,-,No planned interconnector on SAPP interconnector website.,- TRNSYRXXTURXX,SYRXX,TURXX,SYR,TUR,0,0,-,-,-,-,-,-,No information on new planned capacity found. TRNTJKXXUZBXX,TJKXX,UZBXX,TJK,UZB,0,0,-,-,-,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,-,-,- TRNTKMXXUZBXX,TKMXX,UZBXX,TKM,UZB,0,0,-,-,-,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,-,-,- TRNTZAXXUGAXX,TZAXX,UGAXX,TZA,UGA,400,400,-,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNTZAXXZMBXX,TZAXX,ZMBXX,TZA,ZMB,1000,1000,400,620,2026,https://www.sapp.co.zw/interconnectors,https://www.eeas.europa.eu/delegations/tanzania/tanzania-zambia-interconnector_und_en#,-,- TRNUSAAAUSABP,USAAA,USABP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSACH,USAAA,USACH,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSADO,USAAA,USADO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSAGC,USAAA,USAGC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSAIP,USAAA,USAIP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSANW,USAAA,USANW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAAUSAPW,USAAA,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAIUSAMI,USAAI,USAMI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAIUSASP,USAAI,USASP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAIUSASW,USAAI,USASW,USA,USA,2500,2500,600,1287,2028,https://grainbeltexpress.com/wp-content/uploads/2023/03/Grain-Belt-Express-Order-from-ICC-E-12_22-0499_Order-.pdf,https://efis.psc.mo.gov/Document/Display/758566,Distance for planned transmission line was provided in miles and has been converted to kilometers.,"Grain Belt Express Phase 1 line connects the SPP to both MISO and AECI, and the Tiger Connector addition increases the total transmission to 2500 MW for Phase 1." TRNUSAAIUSATV,USAAI,USATV,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAANUSABP,USAAN,USABP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAANUSAPW,USAAN,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSACI,USAAZ,USACI,USA,USA,3200,3200,500,201.2,2024,https://www.nsenergybusiness.com/projects/ten-west-link-transmission-line/,https://ia.cpuc.ca.gov/environment/info/dudek/tenwest/Final_EIS_Ten_West_Link.pdf,Distance for planned transmission line was provided in miles and has been converted to kilometers.,Planned capacity relates to the Ten West Link project which is expected to be operationalized in 2024. The line runs between Arizona Public Service Company (USAAZ) and the territory of CAISO (USACI). TRNUSAAZUSADE,USAAZ,USADE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAHG,USAAZ,USAHG,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAII,USAAZ,USAII,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSALD,USAAZ,USALD,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAPE,USAAZ,USAPE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAPN,USAAZ,USAPN,USA,USA,3000,3000,525,885,2026,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://patternenergy.com/wp-content/uploads/2022/11/20221121-v4_SunZia-PROJECTS-Factsheet.pdf,Distance for planned capacity is converted from miles into km. The Sunzia project is expected to become operational in 2025/2026. We've assumed the latter year.,This is related to the Sunzia transmission line. TRNUSAAZUSAPN,USAAZ,USAPN,USA,USA,1500,1500,500,885,2028,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://riosol.energy/interconnection/,Distance for planned capacity is converted from miles into km.,This is related to the RioSol transmission line. The project is planned to enter in operation in 2028. TRNUSAAZUSASR,USAAZ,USASR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSATP,USAAZ,USATP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAWC,USAAZ,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAAZUSAWM,USAAZ,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABAUSABP,USABA,USABP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABAUSACI,USABA,USACI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABAUSANE,USABA,USANE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABAUSATI,USABA,USATI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSACH,USABP,USACH,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSACI,USABP,USACI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSADO,USABP,USADO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAGC,USABP,USAGC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAGD,USABP,USAGD,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAIP,USABP,USAIP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSALD,USABP,USALD,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSANE,USABP,USANE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSANW,USABP,USANW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAPG,USABP,USAPG,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAPI,USABP,USAPI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSAPW,USABP,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSASL,USABP,USASL,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSABPUSATR,USABP,USATR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACEUSADU,USACE,USADU,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACEUSAPJ,USACE,USAPJ,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf ,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No indicated planned interconnections from CPLE (Duke Energy Progress) to PJM. TRNUSACEUSASC,USACE,USASC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACEUSASG,USACE,USASG,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACEUSAYA,USACE,USAYA,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACHUSADO,USACH,USADO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACHUSAGC,USACH,USAGC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACHUSAPI,USACH,USAPI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSAII,USACI,USAII,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSALD,USACI,USALD,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSANE,USACI,USANE,USA,USA,1500,1500,500,79,2027,https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf,https://www.power-technology.com/projects/transwest-express-transmission-project-usa/?cf-view,Distance for planned capacity is converted from miles into km.,This corresponds to the Nevada Power Company to the Southern California Edison (CAISO) Section of the TransWest Express transmission project. TRNUSACIUSAPW,USACI,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSASR,USACI,USASR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSATI,USACI,USATI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACIUSAWC,USACI,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACWUSADU,USACW,USADU,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,"Duke Energy Progress West (CPLW) to Duke Energy Carolinas (DUK). There is overlap between service being provided by Duke Energy Progress West (CPLW) and Duke Energy Carolinas (DUK) in some western North Carolina counties. Craggy Enka is a project that is upgrading existing transmission infrastructure that might connect both Balancing Authorities, but there is no information confirming that it is transferring electricity between these balancing authorities." TRNUSACWUSAPJ,USACW,USAPJ,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSACWUSATV,USACW,USATV,USA,USA,0,0,-,-,-,https://www.tva.com/energy/transmission/transmission-projects/appalachia-area-improvement-tennessee-and-north-carolina,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,Neither the TVA source or Duke Energy website indicate that new transmission projects will connect between these balancing authorities. TRNUSADEUSASR,USADE,USASR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSADOUSAGC,USADO,USAGC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSADOUSAPI,USADO,USAPI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSADUUSAPJ,USADU,USAPJ,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSADUUSASA,USADU,USASA,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSADUUSASC,USADU,USASC,USA,USA,0,0,-,-,-,http://www.oasis.oati.com/woa/docs/SC/SCdocs/SanteeCooper_2023_DISIS_Phase_1_Report_Final.pdf,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,"Santee Cooper document indicates that Duke Energy regions might be affected by new interconnections, but these projects are not marked as specific interconnections between the different balancing authorities." TRNUSADUUSASG,USADU,USASG,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSADUUSASO,USADU,USASO,USA,USA,0,0,-,-,-,https://georgiarecorder.com/2023/08/28/federal-state-regulators-prod-utilities-to-consider-technology-for-grid-upgrade/,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSADUUSATV,USADU,USATV,USA,USA,0,0,-,-,-,https://www.tva.com/energy/transmission/transmission-projects/appalachia-area-improvement-tennessee-and-north-carolina,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSADUUSAYA,USADU,USAYA,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAEPUSAER,USAEP,USAER,USA,USA,1500,1500,525,451,2029,https://www.ercot.com/files/docs/2022/07/15/Pecos%20West%20Intertie%20ERCOT%20RPG%2020220719.pdf,https://pecoswest.com/,Distance for planned transmission line was provided in miles and has been converted to kilometers.,"The Pecos West interconnection is a proposed HVDC from the El Paso Electric Company to Bakersfield, TX (ERCOT)" TRNUSAEPUSAPN,USAEP,USAPN,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAEPUSASW,USAEP,USASW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAEPUSATP,USAEP,USATP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAERUSAMI,USAER,USAMI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAERUSAPN,USAER,USAPN,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAERUSASP,USAER,USASP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAERUSASW,USAER,USASW,USA,USA,0,0,-,-,-,https://www.wfaa.com/article/news/local/plans-connect-ercot-power-grid-other-states-draw-new-attention/287-6d3f07fa-b991-46a6-a291-ca2ea528dda7,-,-,Article indicates that there are no concrete plans for planned interconnections from ERCOT to SWPP. TRNUSAERUSATV,USAER,USATV,USA,USA,3000,3000,525,615,2029,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://patternenergy.com/projects/southern-spirit-transmission/,Distance for planned transmission line was provided in miles and has been converted to kilometers.,"The planned capacity consists of the Southern Spirit Transmission line, which the website states will begin in Garland, Texas (within ERCOT) and ends in Choctaw County, Mississippi, which is part of the service area of Tennessee Valley Authority (TVA) (https://choctawcountypartnership.com/utilities/)." TRNUSAFCUSAFL,USAFC,USAFL,USA,USA,0,0,-,-,-,https://guidetogreatergainesville.com/wp-content/uploads/2016/01/Florida-Electric-Territories-Maps.pdf,https://www.floridapsc.com/pscfiles/website-files/PDF/Publications/Reports/General/FactsAndFigures/March%202015.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFCUSAFM,USAFC,USAFM,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://www.ouc.com/resiliencyconnection,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFCUSAGV,USAFC,USAGV,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://www.gru.com/Portals/0/2022%20updates/GRU%202022%20TYSP.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFCUSASM,USAFC,USASM,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFCUSASO,USAFC,USASO,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFCUSATA,USAFC,USATA,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://www.talgov.com/Uploads/Public/Documents/you/tysp_cotu.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. Tallahassee document indicates that only transmission lines within the city are planned. TRNUSAFCUSATC,USAFC,USATC,USA,USA,0,0,-,-,-,https://www.duke-energy.com/our-company/about-us/electric-transmission-projects,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2023/Tampa%20Electric%20Company.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. TRNUSAFLUSAFM,USAFL,USAFM,USA,USA,0,0,-,-,-,https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSAGV,USAFL,USAGV,USA,USA,0,0,-,-,-,https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf,https://www.gru.com/AboutGRU/Content/TransitionPlan.aspx,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSAHS,USAFL,USAHS,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSAJE,USAFL,USAJE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSASM,USAFL,USASM,USA,USA,0,0,-,-,-,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSASO,USAFL,USASO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFLUSATC,USAFL,USATC,USA,USA,0,0,-,-,-,https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFMUSAJE,USAFM,USAJE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAFMUSATC,USAFM,USATC,USA,USA,0,0,-,-,-,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2023/Orlando%20Utilities%20Commission.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGCUSAPI,USAGC,USAPI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGCUSAPW,USAGC,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGDUSAPN,USAGD,USAPN,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGDUSASR,USAGD,USASR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGFUSAWC,USAGF,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGLUSALG,USAGL,USALG,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGLUSAMI,USAGL,USAMI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAGWUSANW,USAGW,USANW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAHGUSASR,USAHG,USASR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAHGUSAWC,USAHG,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAIIUSAWC,USAII,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAIPUSANE,USAIP,USANE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAIPUSANW,USAIP,USANW,USA,USA,1000,1000,500,442.57,2027,https://www.caiso.com/Documents/DecisiononSouthwestIntertieProjectNorth-Presentation-Dec2023.pdf,https://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M353/K226/353226801.PDF,Distance for planned capacity is converted from miles into km.,Planned capacity relates to the SWIP North transmission project. The project is near construction ready and planned to enter in operation late 2027. TRNUSAIPUSAPE,USAIP,USAPE,USA,USA,765,765,500/230,1609,2028,https://www.pacificorp.com/transmission/transmission-projects/energy-gateway/gateway-west.html,https://www.blm.gov/press-release/blm-approves-segments-gateway-west-transmission-line-wyoming,Distance for planned capacity is converted from miles into km. We assume that the reported 765 MW of renewable integration that the Gateway West transmission project facilitates equals the net transfer capacity of the project along all sections of the line. Section D3 of the project (see Pacificorp website) is assumed to be the last section of the line that is required to be completed to facilitate exchange between both balancing authorities hence the planned completion year for this project is assumed to be 2028.,Planned capacity relates to the Gateway West transmission project. It consists of multiple sections of 500 kv and 230 kv transmission lines. TRNUSAIPUSAPW,USAIP,USAPW,USA,USA,1000,1000,500,466,2026,https://www.idahopower.com/energy-environment/energy/planning-and-electrical-projects/current-projects/boardman-to-hemingway/purpose-and-need/,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,Distance for planned transmission line was provided in miles and has been converted to kilometers.,Planned capacity relates to Boardman to Hemingway transmission project. Project is expected to enter service in 2026. TRNUSAISUSANY,USAIS,USANY,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAJEUSASM,USAJE,USASM,USA,USA,0,0,-,-,-,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSALDUSANE,USALD,USANE,USA,USA,1500,1500,500,447,2027,https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf,https://www.power-technology.com/projects/transwest-express-transmission-project-usa/?cf-view,Distance for planned capacity is converted from miles into km.,"This corresponds to the Intermountain Power Agency (Utah substation, operated by LDWP) to Nevada Power Company Section of the TransWest Express transmission project." TRNUSALDUSAPE,USALD,USAPE,USA,USA,3000,3000,525,652,2027,https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf,https://www.power-technology.com/projects/transwest-express-transmission-project-usa/?cf-view,Distance for planned capacity is converted from miles into km.,"This corresponds to the Pacificorp East to Intermountain Power Agency (Utah substation, operated by LDWP) Section of the TransWest Express transmission project." TRNUSALDUSAWC,USALD,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSALGUSAMI,USALG,USAMI,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSALGUSAPJ,USALG,USAPJ,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSALGUSATV,USALG,USATV,USA,USA,0,0,-,-,-,https://www.tva.com/energy/transmission/transmission-system-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the TVA website. TRNUSAMIUSAPJ,USAMI,USAPJ,USA,USA,2100,2100,525,563,-,https://www.utilitydive.com/news/soo-green-transmission-miso-pjm-interregional-big-wires-act-hickenlooper/693916/ ,https://www.startribune.com/st-louis-park-company-behind-novel-2-5b-soo-green-line-underground-power-line-project/600102958/?refresh=true,-,"The Grain Belt Express previously did look at interconnecting with PJM but no concrete plans came from this. The St. Louis Star Tribune source contains a map indicating the route of the SOO Green transmission line, and confirms that this project is a new connection between MISO and PJM." TRNUSAMIUSASO,USAMI,USASO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,https://cdn.misoenergy.org/MTEP23%20Full%20Report630587.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAMIUSASP,USAMI,USASP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAMIUSASW,USAMI,USASW,USA,USA,2500,2500,600;345,1287;,2028,https://grainbeltexpress.com/wp-content/uploads/2023/03/Grain-Belt-Express-Order-from-ICC-E-12_22-0499_Order-.pdf,https://efis.psc.mo.gov/Document/Display/758566,"The Clean Line project's status is currently uncertain, and as a result its capacities have not been added (https://www.spglobal.com/marketintelligence/en/news-insights/research/as-ira-drives-renewables-investment-attention-turns-to-transmission-upgrades). Distance for planned capacity is converted from miles into km.","The Grain Belt Express Phase 1 line connects SPP to both MISO and AECI, and the Tiger Connector addition increases the total transmission to 2500 MW for Phase 1. Although SPP and MISO collaborated on the Joint Targeted Interconnection Queue (JTIQ) study, only the Raun line connects both SPP and MISO territory." TRNUSAMIUSATV,USAMI,USATV,USA,USA,0,0,-,-,-,https://cdn.misoenergy.org/MTEP23%20Full%20Report630587.pdf,https://www.tva.com/energy/transmission/transmission-system-projects,- ,MISO and TVA sources do not indicate any planned transmission projects between MISO and TVA. TRNUSAMIUSAWA,USAMI,USAWA,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANEUSAPE,USANE,USAPE,USA,USA,1500,1500,500,344.4,2027,https://www.transcanyon.com/projects/Cross-Tie-Transmission-Line/default.aspx,"https://www.energy.gov/gdo/transmission-facilitation-program-first-round-selections#:~:text=Cross%2DTie%20is%20a%20proposed,renewable%20energy%20across%20the%20region.",Distance for planned capacity is converted from miles into km.,Planned capacity relates to the Cross-Tie Transmission Line. Construction is expected to start in Q1 of 2025 with assumed year of operation being 2027. TRNUSANEUSAWC,USANE,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANWUSAPE,USANW,USAPE,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANWUSAWA,USANW,USAWA,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANWUSAWM,USANW,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANWUSAWW,USANW,USAWW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSANYUSAPJ,USANY,USAPJ,USA,USA,0,0,-,-,-,https://www.governor.ny.gov/news/governor-hochul-announces-nations-largest-ever-state-investment-renewable-energy-moving,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,"The Mineral Basin Solar Project does not appear to add an interconnection between the New York and PJM grids, and is just feeding solar electricity into the New York Grid. No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report." TRNUSAPEUSAPW,USAPE,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPEUSAWC,USAPE,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPEUSAWM,USAPE,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPGUSAPW,USAPG,USAPW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPIUSASL,USAPI,USASL,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPIUSATR,USAPI,USATR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPJUSATV,USAPJ,USATV,USA,USA,0,0,-,-,-,https://www.pjm.com/-/media/documents/agreements/joint-reliability-agreement-jrca-pjm-tva.ashx,https://www.tva.com/newsroom/press-releases/tva-invites-public-to-open-house-for-proposed-transmission-project-in-lee-county,-,PJM and TVA sources do not indicate any planned transmission projects between PJM and TVA. TRNUSAPNUSAPO,USAPN,USAPO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPNUSASW,USAPN,USASW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPNUSATP,USAPN,USATP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPNUSAWC,USAPN,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPNUSAWM,USAPN,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPOUSASW,USAPO,USASW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAPOUSAWM,USAPO,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASAUSASC,USASA,USASC,USA,USA,0,0,-,-,-,https://www.santeecooper.com/About/Integrated-Resource-Plan/Reports-and-Materials/Santee-Cooper-2023-Integrated-Resource-Plan_Final-Rev_01.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASAUSASG,USASA,USASG,USA,USA,0,0,-,-,-,https://www.dominionenergy.com/projects-and-facilities/electric-projects/power-line-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASAUSASO,USASA,USASO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASCUSASG,USASC,USASG,USA,USA,0,0,-,-,-,https://www.dominionenergy.com/projects-and-facilities/electric-projects/power-line-projects,https://www.santeecooper.com/About/Integrated-Resource-Plan/Reports-and-Materials/Santee-Cooper-2023-Integrated-Resource-Plan_Final-Rev_01.pdf,- ,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASCUSASO,USASC,USASO,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,- ,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASGUSASO,USASG,USASO,USA,USA,0,0,-,-,-,http://www.southeasternrtp.com/docs/general/2009/process2009/2009_2ndMeeting_Presentation.pdf,https://www.dominionenergy.com/projects-and-facilities/electric-projects/power-line-projects/projects-map,-,The Dominion Energy website does not indicate any planned projects to connect Dominion Energy South Carolina to any region within the SOCO jurisdiction. TRNUSASLUSATR,USASL,USATR,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASMUSATC,USASM,USATC,USA,USA,0,0,-,-,-,https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASOUSATA,USASO,USATA,USA,USA,0,0,-,-,-,https://www.talgov.com/Uploads/Public/Documents/you/tysp_cotu.pdf,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASOUSATV,USASO,USATV,USA,USA,0,0,-,-,-,https://www.tva.com/energy/transmission/transmission-system-projects,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,"The TVA source indicates that all new transmission projects to Georgia, Alabama, and Mississippi are within the TVA's jurisdiction and do not connect to Southern Company Services. No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report." TRNUSASPUSASW,USASP,USASW,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASRUSATP,USASR,USATP,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASRUSAWC,USASR,USAWC,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASWUSAWA,USASW,USAWA,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSASWUSAWM,USASW,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSATPUSAWC,USATP,USAWC,USA,USA,748,748,345,281.635,2028,https://southlinetransmission.com/,https://www.heinrich.senate.gov/newsroom/press-releases/heinrich-celebrates-doe-investment-to-advance-southline-transmission-project-in-new-mexico,Distance for planned capacity is converted from miles into km.,Planned capacity relates to the Southline Transmission project. Construction is expected to start in 2025 with assumed year of operation being 2028. TRNUSAWAUSAWM,USAWA,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNUSAWCUSAWM,USAWC,USAWM,USA,USA,0,0,-,-,-,https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf,-,-,No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report. TRNVNMCEVNMNO,VNMCE,VNMNO,VNM,VNM,0,0,-,-,-,https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx,-,Planned capacity in 2025 is assumed to equal the reported planned capacity by 2025 minus existing values in 2020.,- TRNVNMCEVNMSO,VNMCE,VNMSO,VNM,VNM,3500,2500,-,-,2025,https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx,-,Planned capacity in 2025 is assumed to equal the reported planned capacity by 2025 minus existing values in 2020.,- TRNZAFXXZWEXX,ZAFXX,ZWEXX,ZAF,ZWE,300,300,-,-,-,"http://www.geni.org/globalenergy/library/technical-articles/transmission/allafrica.com/225million-zizabona-power-interconnector-to-be-officially-unveiled/index.shtml#:~:text=The%20project%27s%20first%20phase%20wheeling,landmark%20regional%20transmission%20energy%20project.",-,-,- TRNZMBXXZWEXX,ZMBXX,ZWEXX,ZMB,ZWE,300,300,-,-,-,"http://www.geni.org/globalenergy/library/technical-articles/transmission/allafrica.com/225million-zizabona-power-interconnector-to-be-officially-unveiled/index.shtml#:~:text=The%20project%27s%20first%20phase%20wheeling,landmark%20regional%20transmission%20energy%20project.",-,-,-