pathway,from_region,to_region,from_country,to_country,max_flow,max_counter_flow,voltage,distance,source_1,source_2,assumptions,other_notes TRNAFGXXCHNXI,AFGXX,CHNXI,AFG,CHN,0,0,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf,-,- TRNAFGXXIRNXX,AFGXX,IRNXX,AFG,IRN,175,175,-,-,https://www.tehrantimes.com/news/468852/Iran-exporting-110MW-of-electricity-to-Afghanistan,https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf,-,It's reported that as of 2022 trade potential between both countries is set at 175 MW. TRNAFGXXPAKXX,AFGXX,PAKXX,AFG,PAK,0,0,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf,-,- TRNAFGXXTJKXX,AFGXX,TJKXX,AFG,TJK,0,350,220;110,-,https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf,https://www.brecorder.com/news/40272056,Existing capacity is set to be 300 + 50 MW of unilateral capacity for exports from TJK to PAK (Table 3 IEA report). ,- TRNAFGXXTKMXX,AFGXX,TKMXX,AFG,TKM,0,400,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf,Currently a trade agreement of 400 MW for unilateral flow from Turkmenistan to Afghanistan is in place although the respective lines fulfilling this agreement are not always operational. We included these capacities as existing.,- TRNAFGXXUZBXX,AFGXX,UZBXX,AFG,UZB,450,450,220,43.3,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,The UNECE report indicates two existing 220 kV lines between AFG and UZB with 449 MVA each yet other reports indicate a max trade of 450 MW hence we assume the latter.,- TRNAGOXXCODXX,AGOXX,CODXX,AGO,COD,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNAGOXXCOGXX,AGOXX,COGXX,AGO,COG,0,0,-,-,https://openinframap.org/#3.68/-2.67/25.42,-,-,- TRNAGOXXNAMXX,AGOXX,NAMXX,AGO,NAM,0,0,400,190,https://www.sapp.co.zw/interconnectors,https://globaltransmission.info/namibia-inaugurates-400-kv-kunene-omatando-line-project/,"For existing capacity, this is in reference to Obib– Oranjemond 400kV / 220kV, which was inaugurated in Oct 2023, however at present MW values cannot be publicly sourced hence only voltage and distance is added.",- TRNAGOXXZMBXX,AGOXX,ZMBXX,AGO,ZMB,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNALBXXGRCXX,ALBXX,GRCXX,ALB,GRC,400,400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXKOSXX,ALBXX,KOSXX,ALB,KOS,510,652,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSO-E zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNALBXXMKDXX,ALBXX,MKDXX,ALB,MKD,500,500,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXMNEXX,ALBXX,MNEXX,ALB,MNE,350,350,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNALBXXSRBXX,ALBXX,SRBXX,ALB,SRB,500,500,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAREXXINDWE,AREXX,INDWE,ARE,IND,0,0,-,-,https://openinframap.org/#4.16/20.3/63.43,-,-,"No capacity as of yet, but a subsea transmission line is being considered between both countries as part of the One Sun, One World, One Grid initiative." TRNAREXXIRNXX,AREXX,IRNXX,ARE,IRN,0,0,-,-,https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B,https://openinframap.org/#5.79/25.426/55.263,-,In the past it has been mentioned that there was interest for a subsea interconnection linking Iran with the Emirates but no concrete developments on this can be found. TRNAREXXOMNXX,AREXX,OMNXX,ARE,OMN,400,400,220,-,https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B,-,-,- TRNAREXXSAUXX,AREXX,SAUXX,ARE,SAU,900,900,400,-,https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B,-,-,- TRNARGXXBOLXX,ARGXX,BOLXX,ARG,BOL,120,120,132,120,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://inspenet.com/en/noticias/bolivia-and-argentina-inaugurate-electrical-interconnection-to-export-energy-and-strengthen-regional-integration/,-,- TRNARGXXBRASO,ARGXX,BRASO,ARG,BRA,2276,2276,130/230;500,40;135,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNARGXXCHLXX,ARGXX,CHLXX,ARG,CHL,200,200,345,408,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNARGXXPRYXX,ARGXX,PRYXX,ARG,PRY,3320,3310,220;500;220/132,;;35,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://www.webuildgroup.com/en/projects/dams-hydroelectric-plants/yacyreta-hydroelectric-project/,-,- TRNARGXXURYXX,ARGXX,URYXX,ARG,URY,3890,3890,500;500,24;4,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,- TRNARMXXAZEXX,ARMXX,AZEXX,ARM,AZE,0,0,-,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,-,No mentioning of existing or planned interconnections between both countries in the Armenia 2022 Energy Policy Review. TRNARMXXGEOXX,ARMXX,GEOXX,ARM,GEO,200,200,110;110;200,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,Assumed power factor of 1 by converting MVA into MW.,- TRNARMXXIRNXX,ARMXX,IRNXX,ARM,IRN,350,350,220;220,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,Assumed power factor of 1 by converting MVA into MW.,- TRNARMXXTURXX,ARMXX,TURXX,ARM,TUR,0,0,-,-,https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf,-,-,No mentioning of existing or planned interconnections between both countires in the Armenia 2022 Energy Policy Review. TRNAUSNTAUSQL,AUSNT,AUSQL,AUS,AUS,0,0,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSNTAUSSA,AUSNT,AUSSA,AUS,AUS,0,0,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSNTAUSWA,AUSNT,AUSWA,AUS,AUS,0,0,-,-,https://territoryrenewableenergy.nt.gov.au/__data/assets/pdf_file/0011/1056782/darwin-katherine-electricity-system-plan-web.pdf?v=0.1.1,-,-,The Darwin-Katherine energy system plan explicitly states that it is not interconnected with other regional networks in Australia. It does leave open the possibility of interconnections in the future but there are none currently planned. TRNAUSQLAUSSA,AUSQL,AUSSA,AUS,AUS,0,0,-,-,https://www.tdworld.com/grid-innovations/transmission/article/20971581/transaustralian-hvdc-interconnector,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,-,- TRNAUSQLAUSSW,AUSQL,AUSSW,AUS,AUS,1478,1167,110;110;330;330,59;59;300;300,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,https://www.darleypowerfight.com.au/case-studies/directlink-terranora-interconnector/ and https://utilitymagazine.com.au/236m-qld-nsw-interconnector-upgrades-complete/,For existing capacity it is assumed that interconnector capacity was the higher value provided in a range. Existing capacity includes upgrades to the GLD-NSW 330 kV interconnector increasing the power rating of the interconnector.,- TRNAUSQLPNGXX,AUSQL,PNGXX,AUS,PNG,0,0,-,-,https://hir.harvard.edu/electrification-in-papua-new-guinea/,-,-,- TRNAUSSAAUSSW,AUSSA,AUSSW,AUS,AUS,0,0,-,-,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,https://www.projectenergyconnect.com.au/moreInformation.php,-,- TRNAUSSAAUSVI,AUSSA,AUSVI,AUS,AUS,700,820,500;275;220,-,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,https://www.aer.gov.au/networks-pipelines/service-providers-assets/murraylink-electricity-transmission-interconnector,-,- TRNAUSSAAUSWA,AUSSA,AUSWA,AUS,AUS,0,0,-,-,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,-,-,- TRNAUSSWAUSVI,AUSSW,AUSVI,AUS,AUS,400,1000,330;330;330;220;132,-,https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en,https://www.tdworld.com/overhead-transmission/article/21270506/renewables-flow-via-australia-interconnector and https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,-,- TRNAUSTAAUSVI,AUSTA,AUSVI,AUS,AUS,594,478,-,370,https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf,https://www.apa.com.au/our-services/other-energy-services/electricity-interconnectors/basslink/,-,- TRNAUSWAIDNNU,AUSWA,IDNNU,AUS,IDN,0,0,-,-,https://www.internationalaffairs.org.au/australianoutlook/the-cable-connection-australia-and-indonesias-shared-journey-to-net-zero-emissions/,https://openinframap.org/#2/26/12,-,- TRNAUSWATLSXX,AUSWA,TLSXX,AUS,TLS,0,0,-,-,https://thebpp.com.au/call-for-partnerships/bpp-call-for-off-grid-renewable-energy-partnerships-in-the-pacific-and-timor-leste/,https://openinframap.org/#2/26/12,-,- TRNAUTXXCHEXX,AUTXX,CHEXX,AUT,CHE,1200,1200,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXCZEXX,AUTXX,CZEXX,AUT,CZE,900,900,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXDEUXX,AUTXX,DEUXX,AUT,DEU,1400,1400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXHUNXX,AUTXX,HUNXX,AUT,HUN,800,800,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXITAXX,AUTXX,ITAXX,AUT,ITA,410,410,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXSVKXX,AUTXX,SVKXX,AUT,SVK,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAUTXXSVNXX,AUTXX,SVNXX,AUT,SVN,950,950,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNAZEXXGEOXX,AZEXX,GEOXX,AZE,GEO,2000,2000,330;500,-,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,"Assumed that the reported Summer TTC is the representative value, winter TTC is 200 MW higher.",- TRNAZEXXIRNXX,AZEXX,IRNXX,AZE,IRN,670,670,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNAZEXXRUSSO,AZEXX,RUSSO,AZE,RUS,0,0,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,- TRNBDIXXCODXX,BDIXX,CODXX,BDI,COD,30,30,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNBDIXXRWAXX,BDIXX,RWAXX,BDI,RWA,30,30,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNBDIXXTZAXX,BDIXX,TZAXX,BDI,TZA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNBELXXDEUXX,BELXX,DEUXX,BEL,DEU,1000,1000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXFRAXX,BELXX,FRAXX,BEL,FRA,2800,2800,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXGBRXX,BELXX,GBRXX,BEL,GBR,1000,1000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXLUXXX,BELXX,LUXXX,BEL,LUX,680,680,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBELXXNLDXX,BELXX,NLDXX,BEL,NLD,2400,1400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBENXXBFAXX,BENXX,BFAXX,BEN,BFA,0,0,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNBENXXGHAXX,BENXX,GHAXX,BEN,GHA,450,450,330,-,https://www.sciencedirect.com/science/article/pii/S0973082618300590?casa_token=SrOwfLg65s4AAAAA:WqgQ4EnyuHDmuM1rUZCNXgdEcHgbKSU-Cp1Jk7yupC7JuT0PaW53KmWr4FLhGnnZqOGiyARnMg,https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf,-,"Dorsale 330 kV (Ghana, Togo/Benin, Côte d’Ivoire). MW is sourced from P47 from IRENA source." TRNBENXXNERXX,BENXX,NERXX,BEN,NER,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S0973082618300590?casa_token=SrOwfLg65s4AAAAA:WqgQ4EnyuHDmuM1rUZCNXgdEcHgbKSU-Cp1Jk7yupC7JuT0PaW53KmWr4FLhGnnZqOGiyARnMg,-,-,- TRNBENXXNGAXX,BENXX,NGAXX,BEN,NGA,210,210,330,70,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,- TRNBENXXTGOXX,BENXX,TGOXX,BEN,TGO,345,345,330,-,https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf,-,-,- TRNBFAXXCIVXX,BFAXX,CIVXX,BFA,CIV,113,113,225,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNBFAXXGHAXX,BFAXX,GHAXX,BFA,GHA,100,100,225,210,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,"https://www.eu-africa-infrastructure-tf.net/activities/grants/interconnection-bolgatanga-ouagadougou-ta-afd.htm#:~:text=The%20interconnection%20line%20is%20commissioned,from%20Ghana%20to%20Burkina%20Faso.",-,Bolgatanga-Ouagadougou (225 kV) line. TRNBFAXXMLIXX,BFAXX,MLIXX,BFA,MLI,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S0973082618300590?casa_token=Ie4H8WmstREAAAAA:dyxlYJvdUDEE0tYaWvFUe4v8DqFP0pXWuLRWM77clRKW2ZXwC7zkAAx3tB0nYR_Xy9n-di6a7Q#f0010,-,-,- TRNBFAXXNERXX,BFAXX,NERXX,BFA,NER,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S0306261922014714?casa_token=04z584bc_20AAAAA:scODgr3J18JXsZ2IfGStXFHel2TtK6IsIL-qX1QrJ1QAZiD2Z_DGLxHqSX9lyIulI0hehyJlgA#f0010,-,-,- TRNBFAXXTGOXX,BFAXX,TGOXX,BFA,TGO,0,0,-,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNBGDXXINDEA,BGDXX,INDEA,BGD,IND,1000,1000,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNBGDXXINDNE,BGDXX,INDNE,BGD,IND,160,160,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNBGDXXMMRXX,BGDXX,MMRXX,BGD,MMR,0,0,-,-,https://openinframap.org/#5.28/22.343/95.998,-,-,- TRNBGRXXGRCXX,BGRXX,GRCXX,BGR,GRC,770,1100,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXMKDXX,BGRXX,MKDXX,BGR,MKD,500,500,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXROUXX,BGRXX,ROUXX,BGR,ROU,900,900,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXSRBXX,BGRXX,SRBXX,BGR,SRB,320,320,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBGRXXTURXX,BGRXX,TURXX,BGR,TUR,900,900,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBHRXXSAUXX,BHRXX,SAUXX,BHR,SAU,600,600,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNBIHXXHRVXX,BIHXX,HRVXX,BIH,HRV,750,750,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXMNEXX,BIHXX,MNEXX,BIH,MNE,800,800,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBIHXXSRBXX,BIHXX,SRBXX,BIH,SRB,530,530,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNBLRXXLTUXX,BLRXX,LTUXX,BLR,LTU,1001,525,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNBLRXXLVAXX,BLRXX,LVAXX,BLR,LVA,0,0,-,-,https://www.entsoe.eu/data/map/,-,-,- TRNBLRXXPOLXX,BLRXX,POLXX,BLR,POL,0,0,-,-,https://www.entsoe.eu/data/map/,https://cms.law/en/int/expert-guides/cms-expert-guide-to-electricity/poland,-,Historically BLR and POL have a number of AC tie-lines but these are not operational as of 2024. TRNBLRXXRUSCE,BLRXX,RUSCE,BLR,RUS,2720,2720,330;330;750,-,https://eepublicdownloads.entsoe.eu/clean-documents/pre2015/publications/ce/otherreports/SYSTINT_Report_2002.pdf,https://www.entsoe.eu/data/map/,"Assumed to consist of the reported tie-lines to Smolenskaya NPP (1000 MW), Talashkino (780 MW), Roslavl (940 MW). No updated information on existing infrastructure beyond the lines reported in the ENTSOE documents (and grid map) can be found.",- TRNBLRXXRUSNW,BLRXX,RUSNW,BLR,RUS,570,570,330,-,https://eepublicdownloads.entsoe.eu/clean-documents/pre2015/publications/ce/otherreports/SYSTINT_Report_2002.pdf,https://www.entsoe.eu/data/map/,Assumed to consist of the reported tie-line to Novosokolniki (570 MW). No updated information on existing infrastructure beyond the lines reported in the ENTSOE documents (and grid map) can be found.,- TRNBLRXXUKRXX,BLRXX,UKRXX,BLR,UKR,0,0,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,-,UKR historically was connected with BLR and RUS but disconnected early 2022 so existing and planned capacities are set to 0.,- TRNBLZXXGTMXX,BLZXX,GTMXX,BLZ,GTM,0,0,-,-,https://www.energy.gov.bz/wp-content/uploads/2020/09/Belize-Energy-Report-2018.pdf,-,-,- TRNBLZXXMEXXX,BLZXX,MEXXX,BLZ,MEX,40,40,115,-,https://www.tdworld.com/overhead-transmission/article/20969227/transamerica-interconnections,-,-,- TRNBOLXXBRACW,BOLXX,BRACW,BOL,BRA,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBOLXXBRAWE,BOLXX,BRAWE,BOL,BRA,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBOLXXCHLXX,BOLXX,CHLXX,BOL,CHL,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBOLXXPERXX,BOLXX,PERXX,BOL,PER,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBOLXXPRYXX,BOLXX,PRYXX,BOL,PRY,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNBRACNBRACW,BRACN,BRACW,BRA,BRA,6795,6795,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRANE,BRACN,BRANE,BRA,BRA,8815,8815,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRANW,BRACN,BRANW,BRA,BRA,2882,2882,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNBRASE,BRACN,BRASE,BRA,BRA,8000,8000,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACNGUYXX,BRACN,GUYXX,BRA,GUY,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRACNSURXX,BRACN,SURXX,BRA,SUR,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRACWBRANE,BRACW,BRANE,BRA,BRA,2188,2188,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRANW,BRACW,BRANW,BRA,BRA,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRASE,BRACW,BRASE,BRA,BRA,30821,30821,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRASO,BRACW,BRASO,BRA,BRA,231,231,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWBRAWE,BRACW,BRAWE,BRA,BRA,694,694,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRACWPRYXX,BRACW,PRYXX,BRA,PRY,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANEBRASE,BRANE,BRASE,BRA,BRA,3282,3282,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRANWBRAWE,BRANW,BRAWE,BRA,BRA,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRANWCOLXX,BRANW,COLXX,BRA,COL,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWGUFXX,BRANW,GUFXX,BRA,GUF,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWGUYXX,BRANW,GUYXX,BRA,GUY,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWPERXX,BRANW,PERXX,BRA,PER,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWSURXX,BRANW,SURXX,BRA,SUR,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRANWVENXX,BRANW,VENXX,BRA,VEN,231,231,230/400,580,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRASEBRASO,BRASE,BRASO,BRA,BRA,25141,25141,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRASEBRAWE,BRASE,BRAWE,BRA,BRA,6300,6300,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,"Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the representation as used in the OSeMOSYS Global model.",- TRNBRASOPRYXX,BRASO,PRYXX,BRA,PRY,8751,8751,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRASOURYXX,BRASO,URYXX,BRA,URY,570,570,150/230;500,11;400,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRAWEPERXX,BRAWE,PERXX,BRA,PER,0,0,-,-,https://www.nature.com/articles/s41597-023-01992-9,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,- TRNBRNXXMYSSK,BRNXX,MYSSK,BRN,MYS,0,0,-,-,https://openinframap.org/#7.67/4.021/115.104,-,-,- TRNBTNXXCHNTI,BTNXX,CHNTI,BTN,CHN,0,0,-,-,https://openinframap.org/#6.97/28.151/92.93,-,-,- TRNBTNXXINDEA,BTNXX,INDEA,BTN,IND,1980,0,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNBWAXXNAMXX,BWAXX,NAMXX,BWA,NAM,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNBWAXXZAFXX,BWAXX,ZAFXX,BWA,ZAF,615,615,400,-,https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010,-,-,- TRNBWAXXZMBXX,BWAXX,ZMBXX,BWA,ZMB,250,250,220,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNBWAXXZWEXX,BWAXX,ZWEXX,BWA,ZWE,420,420,400;220,-,https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010,-,-,- TRNCAFXXCMRXX,CAFXX,CMRXX,CAF,CMR,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S136403212100873X?casa_token=wyrtwHk-dIQAAAAA:YJkFMuhj01crydRxT4IvixRdKzJxFyzOJLML1JqPcLJg69t4TqpQ4VkUo0MkknvuM5Up3N-ISg#fig5,https://www.worldbank.org/en/news/press-release/2020/06/16/promoting-regional-power-interconnection-in-central-africa,-,- TRNCAFXXCODXX,CAFXX,CODXX,CAF,COD,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S136403212100873X?casa_token=wyrtwHk-dIQAAAAA:YJkFMuhj01crydRxT4IvixRdKzJxFyzOJLML1JqPcLJg69t4TqpQ4VkUo0MkknvuM5Up3N-ISg#fig5,https://www.worldbank.org/en/news/press-release/2020/06/16/promoting-regional-power-interconnection-in-central-africa,-,- TRNCAFXXCOGXX,CAFXX,COGXX,CAF,COG,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S136403212100873X?casa_token=wyrtwHk-dIQAAAAA:YJkFMuhj01crydRxT4IvixRdKzJxFyzOJLML1JqPcLJg69t4TqpQ4VkUo0MkknvuM5Up3N-ISg#fig5,https://www.worldbank.org/en/news/press-release/2020/06/16/promoting-regional-power-interconnection-in-central-africa,-,- TRNCAFXXSDNXX,CAFXX,SDNXX,CAF,SDN,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S136403212100873X?casa_token=wyrtwHk-dIQAAAAA:YJkFMuhj01crydRxT4IvixRdKzJxFyzOJLML1JqPcLJg69t4TqpQ4VkUo0MkknvuM5Up3N-ISg#fig5,https://www.worldbank.org/en/news/press-release/2020/06/16/promoting-regional-power-interconnection-in-central-africa,-,- TRNCAFXXSSDXX,CAFXX,SSDXX,CAF,SSD,0,0,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,-,- TRNCAFXXTCDXX,CAFXX,TCDXX,CAF,TCD,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S136403212100873X?casa_token=wyrtwHk-dIQAAAAA:YJkFMuhj01crydRxT4IvixRdKzJxFyzOJLML1JqPcLJg69t4TqpQ4VkUo0MkknvuM5Up3N-ISg#fig5,-,-,- TRNCANABCANBC,CANAB,CANBC,CAN,CAN,1000,1200,500;138;138,-,https://www.lawsonlundell.com/media/news/241_BC-AlbertaIntertie.pdf,-,-,- TRNCANABCANNO,CANAB,CANNO,CAN,CAN,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/albertas-electric-reliability-framework/18826,-,-,No mentioning of existing/new lines between Alberta and the Northern provinces in AESO Long-term Transmission Plan 2022. TRNCANABCANSK,CANAB,CANSK,CAN,CAN,150,150,42,-,https://www.atco.com/en-ca/projects/mcneill-hvdc-link.html,https://en-academic.com/dic.nsf/enwiki/11718000,-,- TRNCANABUSAGW,CANAB,USAGW,CAN,USA,0,0,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANABUSANW,CANAB,USANW,CAN,USA,300,300,230,345,https://www.bhe-canada.ca/portfolio/matl/,-,-,- TRNCANABUSAWA,CANAB,USAWA,CAN,USA,0,0,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANABUSAWW,CANAB,USAWW,CAN,USA,0,0,-,-,https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf,-,-,No mentioning of existing or new lines with USA in AESO Long-term Transmission Plan 2022. TRNCANARCANNL,CANAR,CANNL,CAN,CAN,500,500,200,180,"https://www.hitachienergy.com/us/en/about-us/customer-success-stories/maritime-link#:~:text=The%20Maritime%20Link%20Project%20is,American%20grid%20in%20Nova%20Scotia.",https://iaac-aeic.gc.ca/050/evaluations/proj/65713,-,Capacities relate to the Maritime link. TRNCANARCANQC,CANAR,CANQC,CAN,CAN,775,1200,-,-,http://www.oasis.oati.com/hqt/index.html,-,-,- TRNCANARUSAIS,CANAR,USAIS,CAN,USA,700,350,345;345;138;69;69,-,https://www.cmpco.com/w/system-information,https://www.iso-ne.com/static-assets/documents/2020/04/new-england-geographic-diagram-transmission-planning.pdf,-,- TRNCANBCCANNO,CANBC,CANNO,CAN,CAN,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/northwest-territories-electric-reliability-framework/18838,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,No existing/new planned lines visible on BC hydro transmission map. TRNCANBCUSAAA,CANBC,USAAA,CAN,USA,0,0,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,- TRNCANBCUSAAK,CANBC,USAAK,CAN,USA,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/british-columbias-electric-reliability-framework/18828,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,No existing/planned lines shown on BC Hydro transmission map. TRNCANBCUSABP,CANBC,USABP,CAN,USA,2300,2000,500;500;230;230,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/engineering_studies_data/technical_data/line_ratings/nwuscan.pdf,-,-,- TRNCANBCUSADO,CANBC,USADO,CAN,USA,0,0,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,- TRNCANBCUSAPI,CANBC,USAPI,CAN,USA,0,0,-,-,https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf,-,-,- TRNCANMBCANNO,CANMB,CANNO,CAN,CAN,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/manitobas-electric-reliability-framework/18830,-,-,No existing/new planned lines visible on Manitoba hydro transmission map. TRNCANMBCANON,CANMB,CANON,CAN,CAN,200,200,230,-,https://dbrs.morningstar.com/research/354005/manitoba-hydro-electric-board-the-rating-report,-,-,- TRNCANMBCANSK,CANMB,CANSK,CAN,CAN,350,350,230,-,"https://www.saskpower.com/about-us/media-information/news-releases/2022/SaskPower-seeking-to-expand-transmission-capacity-with-the-Southwest-Power-Pool#:~:text=SaskPower's%20grid%20is%20also%20interconnected,290%20MW%20in%20June%202022.",https://www.gov.mb.ca/sd/eal/registries/5950birtle/Proposal/executivesummary.pdf,-,- TRNCANMBUSAMI,CANMB,USAMI,CAN,USA,2983,1583,-,-,http://www.oasis.oati.com/woa/docs/MHEB/MHEBdocs/2015_Transmission_Interface_Capability_Report.pdf,-,-,Includes firm transfer capabilities as of 2015 + additional 883 MW line capacity as of 2021 with new 500 kV Great Northern Transmission Line. TRNCANMBUSASW,CANMB,USASW,CAN,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/dashboard/electric_overview/US48/US48,-,EIA data used to confirm that no lines/trade exists between CANMB and USASW.,- TRNCANNLCANQC,CANNL,CANQC,CAN,CAN,5150,0,-,-,http://www.oasis.oati.com/hqt/index.html,-,-,Existing lines are solely for import of electricity from the Churchill Falls hydro facilities. TRNCANNLGRLXX,CANNL,GRLXX,CAN,GRL,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/newfoundland-and-labradors-electric-reliability-framework/18834,-,-,- TRNCANNOCANSK,CANNO,CANSK,CAN,CAN,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/saskatchewans-electric-reliability-framework/18849,-,-,- TRNCANNOUSAAK,CANNO,USAAK,CAN,USA,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/northwest-territories-electric-reliability-framework/18838,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/yukons-electric-reliability-framework/18800,-,"Alaska, Yukon, Nunavut and the Northwest Territories have isolated and scattered systems due to its large size." TRNCANONCANQC,CANON,CANQC,CAN,CAN,2082,2750,115;115;115;115;230;230;230;230;230;230;230,-,https://docs2.cer-rec.gc.ca/ll-eng/llisapi.dll/fetch/2000/90466/94151/402424/3006476/3006474/A78621%2D5_B%2D2%2D1_Description_Ont_Transmission_System_%2D_A5E0C9.pdf?nodeid=3011599&vernum=-2,-,Assumed that the overall capacities are the higher winter limits given IESO system documentation.,- TRNCANONUSAMI,CANON,USAMI,CAN,USA,1650,1450,-,-,https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx,-,-,- TRNCANONUSANY,CANON,USANY,CAN,USA,2400,1900,-,-,https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx,-,-,- TRNCANONUSAPJ,CANON,USAPJ,CAN,USA,0,0,-,-,https://natural-resources.canada.ca/energy/electricity-infrastructure/electricity-canada/canada-electric-reliability-framework/ontarios-electric-reliability-framework/18842,https://www.eia.gov/electricity/gridmonitor/dashboard/electric_overview/balancing_authority/PSCO,-,"The Lake Erie Connection was previously proposed in 2014, but it was placed on hold in 2022" TRNCANQCUSAIS,CANQC,USAIS,CAN,USA,2275,2170,450;120;115,1448;;,http://www.oasis.oati.com/hqt/index.html,-,-,- TRNCANQCUSANY,CANQC,USANY,CAN,USA,2070,1100,115;765,75;,http://www.oasis.oati.com/hqt/index.html,https://www.nyiso.com/documents/20142/3691300/Summer2023-OperatingStudy-OC.pdf/7d9898e2-21b0-9d45-fef4-68977d271e68,-,- TRNCANSKUSAMI,CANSK,USAMI,CAN,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/dashboard/electric_overview/US48/US48,-,EIA data used to confirm that no lines/trade exists between CANSK and USAMI.,- TRNCANSKUSASW,CANSK,USASW,CAN,USA,150,150,-,-,https://www.saskatchewan.ca/-/media/news-release-backgrounders/2021/jul/saskpower-2020-21-annual-report.pdf,-,Distance values are given in miles and have been converted to kilometers.,- TRNCANSKUSAWA,CANSK,USAWA,CAN,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/dashboard/electric_overview/US48/US48,-,EIA data used to confirm that no lines/trade exists between CANSK and USAWA.,- TRNCHEXXDEUXX,CHEXX,DEUXX,CHE,DEU,4200,4200,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCHEXXFRAXX,CHEXX,FRAXX,CHE,FRA,3700,3700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCHEXXITAXX,CHEXX,ITAXX,CHE,ITA,3750,3750,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCHLXXPERXX,CHLXX,PERXX,CHL,PER,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNCHNANCHNHB,CHNAN,CHNHB,CHN,CHN,4000,4000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNHE,CHNAN,CHNHE,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNHU,CHNAN,CHNHU,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNJS,CHNAN,CHNJS,CHN,CHN,7500,7500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNJX,CHNAN,CHNJX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNSD,CHNAN,CHNSD,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNANCHNZH,CHNAN,CHNZH,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNBECHNHB,CHNBE,CHNHB,CHN,CHN,6500,6500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNBECHNNM,CHNBE,CHNNM,CHN,CHN,5000,5000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNBECHNTJ,CHNBE,CHNTJ,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNGU,CHNCH,CHNGU,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNHB,CHNCH,CHNHB,CHN,CHN,4000,4000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNHN,CHNCH,CHNHN,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNHU,CHNCH,CHNHU,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNSC,CHNCH,CHNSC,CHN,CHN,6500,6500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNSI,CHNCH,CHNSI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNCHCHNSX,CHNCH,CHNSX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNFUCHNGD,CHNFU,CHNGD,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNFUCHNJX,CHNFU,CHNJX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNFUCHNZH,CHNFU,CHNZH,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNFUTWNXX,CHNFU,TWNXX,CHN,TWN,0,0,-,-,https://openinframap.org/#5.13/23.77/122.57,-,-,Taiwan is an energy island with no interconnection to other regions/countries. TRNCHNGACHNJS,CHNGA,CHNJS,CHN,CHN,7200,7200,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNNI,CHNGA,CHNNI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNNM,CHNGA,CHNNM,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNQI,CHNGA,CHNQI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNSC,CHNGA,CHNSC,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNSD,CHNGA,CHNSD,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,- TRNCHNGACHNSI,CHNGA,CHNSI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGACHNXI,CHNGA,CHNXI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGAMNGXX,CHNGA,MNGXX,CHN,MNG,0,0,-,-,https://openinframap.org/#4.99/47.32/92.59,-,-,- TRNCHNGDCHNGX,CHNGD,CHNGX,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGDCHNHA,CHNGD,CHNHA,CHN,CHN,1200,1200,-,-,https://openinframap.org/#8.31/19.994/110.209,https://www.xinhuanet.com/english/2019-02/12/c_137816315.htm,-,Phase ii of the Hainan - China mainland interconnection development was finalized in 2019/2020 increasing transmission capacity from 600 MW to 1200 MW. TRNCHNGDCHNHK,CHNGD,CHNHK,CHN,CHN,1700,1700,-,-,https://www.seetao.com/details/166829.html,-,-,- TRNCHNGDCHNHN,CHNGD,CHNHN,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGDCHNJX,CHNGD,CHNJX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGDCHNMA,CHNGD,CHNMA,CHN,CHN,1700,1700,-,-,https://news.cgtn.com/news/2022-11-25/3rd-power-transmission-line-from-Guangdong-to-Macao-put-into-operation-1ffF7CrsDkY/index.html,-,-,A new power line between Guangdong and Macau has been completed in 2022. TRNCHNGDCHNSC,CHNGD,CHNSC,CHN,CHN,14400,14400,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGDCHNYU,CHNGD,CHNYU,CHN,CHN,24700,29700,-,-,https://github.com/switch-model/switch-china-open-model,https://cleanenergygrid.org/wp-content/uploads/2020/11/Macro-Grids-in-the-Mainstream-1.pdf,Includes existing 5 GW Wudongde-Guangxi-Guangdong line (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources in to demand centers.,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGUCHNGX,CHNGU,CHNGX,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGUCHNHN,CHNGU,CHNHN,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGUCHNJS,CHNGU,CHNJS,CHN,CHN,7200,7200,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGUCHNSC,CHNGU,CHNSC,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGUCHNYU,CHNGU,CHNYU,CHN,CHN,5500,5500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGXCHNHN,CHNGX,CHNHN,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGXCHNXI,CHNGX,CHNXI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGXCHNYU,CHNGX,CHNYU,CHN,CHN,2500,5500,-,-,https://github.com/switch-model/switch-china-open-model,https://cleanenergygrid.org/wp-content/uploads/2020/11/Macro-Grids-in-the-Mainstream-1.pdf,Includes existing 3 GW Wudongde-Guangxi-Guangdong line (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources in to demand centers.,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNGXVNMNO,CHNGX,VNMNO,CHN,VNM,70,70,110,-,https://tuoitrenews.vn/news/society/20230523/vietnam-buys-electricity-from-china-to-ease-shortage/73292.html,-,-,110 kV line between Guangxi and Vietnam has been reopened in 2023 with an agreed max trade of 70 MW. TRNCHNHBCHNHE,CHNHB,CHNHE,CHN,CHN,14274.3,14274.3,-,-,https://github.com/switch-model/switch-china-open-model,https://iopscience.iop.org/article/10.1088/1742-6596/2276/1/012005/pdf,Includes existing 10.2743 GW Zhangbei-Xiong'an line (capacity not yet included in SWITCH data with 2020 baseline year),Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHBCHNLI,CHNHB,CHNLI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHBCHNNM,CHNHB,CHNNM,CHN,CHN,6500,6500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHBCHNSD,CHNHB,CHNSD,CHN,CHN,8500,8500,-,-,https://github.com/switch-model/switch-china-open-model,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,Includes existing 6 GW Weifang-Shijazhuang line (capacity not yet included in SWITCH data with 2020 baseline year),Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHBCHNSX,CHNHB,CHNSX,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHBCHNTJ,CHNHB,CHNTJ,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNHU,CHNHE,CHNHU,CHN,CHN,8500,8500,-,-,https://github.com/switch-model/switch-china-open-model,https://www.composite-insulators.com/news/nanyang-jingmen-changsha-1000-kv-uhv-ac-pr-61790907.html,Includes existing 6 GW Nanyang-Jingmen-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year).,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNJS,CHNHE,CHNJS,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNQI,CHNHE,CHNQI,CHN,CHN,0,8000,800,1587,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,-,Includes existing 8 GW Qinghai-Henan line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources in to demand centers.,- TRNCHNHECHNSD,CHNHE,CHNSD,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNSI,CHNHE,CHNSI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNSX,CHNHE,CHNSX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHECHNXI,CHNHE,CHNXI,CHN,CHN,14400,14400,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHJCHNJI,CHNHJ,CHNJI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHJCHNNM,CHNHJ,CHNNM,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHJRUSFE,CHNHJ,RUSFE,CHN,RUS,950,950,500;220;110;110,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,https://www.unescap.org/sites/default/files/D1-S1b.%20Inner%20Mongolia%20Power%20Group_Mr.%20Yan%20Jun.pdf,"Values are derived from Table 3.1 (translated from Russian). Voltages from the 'The research of power interconnection among China, Russia, Mongolia' Slidedeck.",- TRNCHNHJRUSSI,CHNHJ,RUSSI,CHN,RUS,0,0,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNHNCHNHU,CHNHN,CHNHU,CHN,CHN,14500,14500,-,-,https://github.com/switch-model/switch-china-open-model,https://www.composite-insulators.com/news/nanyang-jingmen-changsha-1000-kv-uhv-ac-pr-61790907.html,Includes existing 6 GW Nanyang-Jingmen-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year).,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHNCHNJX,CHNHN,CHNJX,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHNCHNNI,CHNHN,CHNNI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHNCHNSC,CHNHN,CHNSC,CHN,CHN,10500,10500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHNCHNSX,CHNHN,CHNSX,CHN,CHN,5000,5000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHUCHNJX,CHNHU,CHNJX,CHN,CHN,7500,7500,-,-,https://github.com/switch-model/switch-china-open-model,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,Includes existing 5 GW Nanchang-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year).,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHUCHNSC,CHNHU,CHNSC,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNHUCHNSI,CHNHU,CHNSI,CHN,CHN,8000,8000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJICHNLI,CHNJI,CHNLI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJICHNNM,CHNJI,CHNNM,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJIPRKXX,CHNJI,PRKXX,CHN,PRK,0,0,-,-,https://openinframap.org/#7.22/40.657/126.096,https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar,-,- TRNCHNJSCHNSC,CHNJS,CHNSC,CHN,CHN,0,8000,800,2080,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,https://www.enerdata.net/publications/daily-energy-news/chinas-8-gw-baihetan-zhejiang-power-transmission-line-fully-operational.html,Includes existing 8 GW Baihetan - Jiangsu line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.,- TRNCHNJSCHNSD,CHNJS,CHNSD,CHN,CHN,5000,5000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJSCHNSH,CHNJS,CHNSH,CHN,CHN,7500,7500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJSCHNSI,CHNJS,CHNSI,CHN,CHN,4000,4000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJSCHNSX,CHNJS,CHNSX,CHN,CHN,5000,5000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJSCHNZH,CHNJS,CHNZH,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJXCHNNM,CHNJX,CHNNM,CHN,CHN,7200,7200,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNJXCHNSC,CHNJX,CHNSC,CHN,CHN,0,8000,800,1711,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,-,Includes existing 8 GW Yazhong-Jiangxi line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.,- TRNCHNJXCHNZH,CHNJX,CHNZH,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNLICHNNM,CHNLI,CHNNM,CHN,CHN,6500,6500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNLIPRKXX,CHNLI,PRKXX,CHN,PRK,50,50,-,-,https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar,https://openinframap.org/#7.22/40.657/126.096,"No data can be found on exact existing transmission capacities, but it is reported that China imported 35,974 MWh in September 2021. Assuming this is close to the maximum available capacity considering supply constraints and large electricity needs in China (see sources) this equals roughly 50 MW (35,974/30 days/24 hours).",- TRNCHNNICHNNM,CHNNI,CHNNM,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNICHNSD,CHNNI,CHNSD,CHN,CHN,4000,4000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNICHNSI,CHNNI,CHNSI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNICHNZH,CHNNI,CHNZH,CHN,CHN,7200,7200,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNMCHNSD,CHNNM,CHNSD,CHN,CHN,14400,14400,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNMCHNSI,CHNNM,CHNSI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNMCHNSX,CHNNM,CHNSX,CHN,CHN,19500,19500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNMCHNTJ,CHNNM,CHNTJ,CHN,CHN,4000,4000,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNNMMNGXX,CHNNM,MNGXX,CHN,MNG,260,260,220;220,-,https://www.unescap.org/sites/default/files/D1-S1b.%20Inner%20Mongolia%20Power%20Group_Mr.%20Yan%20Jun.pdf,-,-,Power trade agreement running up till 2023 between Mongolia and Inner Mongolia is set at max 260 MW. TRNCHNNMRUSSI,CHNNM,RUSSI,CHN,RUS,0,0,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNQICHNSC,CHNQI,CHNSC,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNQICHNTI,CHNQI,CHNTI,CHN,CHN,1500,1500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNQICHNXI,CHNQI,CHNXI,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSCCHNSI,CHNSC,CHNSI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSCCHNTI,CHNSC,CHNTI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSCCHNYU,CHNSC,CHNYU,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSCCHNZH,CHNSC,CHNZH,CHN,CHN,8000,0,800,2121,https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1,https://www.enerdata.net/publications/daily-energy-news/chinas-8-gw-baihetan-zhejiang-power-transmission-line-fully-operational.html,Includes existing 8 GW Baihetan - Zhejiang line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.,- TRNCHNSDCHNSX,CHNSD,CHNSX,CHN,CHN,6500,6500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSDCHNTJ,CHNSD,CHNTJ,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSDKORXX,CHNSD,KORXX,CHN,KOR,0,0,-,-,https://openinframap.org/#7.22/40.657/126.096,-,-,- TRNCHNSDPRKXX,CHNSD,PRKXX,CHN,PRK,0,0,-,-,https://openinframap.org/#7.22/40.657/126.096,-,-,- TRNCHNSHCHNZH,CHNSH,CHNZH,CHN,CHN,2500,2500,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNSICHNSX,CHNSI,CHNSX,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNTICHNXI,CHNTI,CHNXI,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNTICHNYU,CHNTI,CHNYU,CHN,CHN,0,0,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNTIINDNE,CHNTI,INDNE,CHN,IND,0,0,-,-,https://openinframap.org/#5.7/29.925/87.699,-,-,No existing lines/electricity trade between CHN and IND. TRNCHNTIINDNO,CHNTI,INDNO,CHN,IND,0,0,-,-,https://openinframap.org/#5.7/29.925/87.699,-,-,No existing lines/electricity trade between CHN and IND. TRNCHNTIMMRXX,CHNTI,MMRXX,CHN,MMR,0,0,-,-,https://openinframap.org/#5.23/26.014/95.885,-,-,No existing plans found for ties between Tibet and Myanmar. TRNCHNTINPLXX,CHNTI,NPLXX,CHN,NPL,0,0,-,-,https://openinframap.org/#5.83/29.219/88.142,-,-,- TRNCHNTIPAKXX,CHNTI,PAKXX,CHN,PAK,0,0,-,-,https://openinframap.org/#6.47/34.914/74.38,-,-,No current lines exist between China and Pakistan. TRNCHNXIINDNO,CHNXI,INDNO,CHN,IND,0,0,-,-,https://openinframap.org/#5.7/29.925/87.699,-,-,No existing lines/electricity trade between CHN and IND. TRNCHNXIKAZXX,CHNXI,KAZXX,CHN,KAZ,0,0,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No existing/planned lines on KAZ grid map that is up to date as of 2023. TRNCHNXIKGZXX,CHNXI,KGZXX,CHN,KGZ,0,0,-,-,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,-,No mentioning of transmission capacity between CHN and KGZ in UNECE report. TRNCHNXIMNGXX,CHNXI,MNGXX,CHN,MNG,0,0,-,-,https://openinframap.org/#4.99/47.32/92.59,-,There is interest in additional (higher voltage) transmission interconnections between CHN and MNG but as of yet it doesn't seem that any projects are close to actual development.,- TRNCHNXIPAKXX,CHNXI,PAKXX,CHN,PAK,0,0,-,-,https://openinframap.org/#6.47/34.914/74.38,-,-,"No current lines exist between China and Pakistan, and although there is strong collaboration and multual influences in the energy space no concrete plans as of yet exist for transmission lines." TRNCHNXIRUSSI,CHNXI,RUSSI,CHN,RUS,0,0,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Values are derived from Table 3.1 (translated from Russian).,- TRNCHNXITJKXX,CHNXI,TJKXX,CHN,TJK,0,0,-,-,https://www.iea.org/reports/cross-border-electricity-trading-for-tajikistan-a-roadmap/opportunities-for-electricity-trade,-,-,- TRNCHNYUCHNZH,CHNYU,CHNZH,CHN,CHN,15200,15200,-,-,https://github.com/switch-model/switch-china-open-model,-,-,Use of data from SWITCH-China requires citation of number of data sources (see Github page) TRNCHNYULAOXX,CHNYU,LAOXX,CHN,LAO,60,60,-,-,https://openinframap.org/#5.85/20.713/105.03,"https://www.globaltimes.cn/page/202206/1268596.shtml#:~:text=The%20implementation%20of%20the%20115,opportunity%20for%20win%2Dwin%20cooperation.","In 2022 the existing 110 kV tieline between Laos and Yunnan has been opened for two-way trade whereas historically it was solely operated for Chinese export. No data can be found on the exact power ratings in the new setup, yet we assume that the historical one-way limit (60 MW) can be operational in both directions.",- TRNCHNYUMMRXX,CHNYU,MMRXX,CHN,MMR,228,228,-,-,https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf,https://www.irrawaddy.com/news/burma/myanmar-regime-signs-energy-agreement-with-china.html,"No data can be found on exact existing transmission capacities, but it is reported that Myanmar imported at max 170 GWh of electricity per month in 2023. Assuming this is close to the maximum available capacity considering supply constraints and large electricity needs in Myanmar (see sources) this equals roughly 228 MW (170 GWh/31 days/24 hours).",Intentions exist to realise a 1 GW intertie between Myanmar and Yunnan (was part of a 2018 development plant in Myanmar) but as to-date has not yet materialized. Initial plans for completion were 2025 but this has been delayed. TRNCHNYUVNMNO,CHNYU,VNMNO,CHN,VNM,800,800,220;220,-,https://hal.science/hal-02396354/document,-,-,No additional concrete plans found for new lines. TRNCIVXXGHAXX,CIVXX,GHAXX,CIV,GHA,280,280,225,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNCIVXXGINXX,CIVXX,GINXX,CIV,GIN,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNCIVXXLBRXX,CIVXX,LBRXX,CIV,LBR,0,0,-,-,https://documents1.worldbank.org/curated/en/275701519410850720/pdf/EXT-AUD-REPORT-CLSG-PROJECT-2016-ENG.pdf,-,-,- TRNCIVXXMLIXX,CIVXX,MLIXX,CIV,MLI,0,0,225,370,https://www.ecowapp.org/sites/default/files/adopting_the_2012-2015_wapp_business_plan.pdf,-,No information on actual existing transmission capacity (MW) can be found only voltage and distance data hence MW values are left blank for the existing capacities.,- TRNCMRXXCOGXX,CMRXX,COGXX,CMR,COG,0,0,-,-,https://www.afdb.org/en/documents/document/angola-burundi-cameroon-car-chad-congo-drc-gabon-equatorial-guinea-rwanda-study-on-interconnection-of-power-grids-of-eccas-member-countries-project-completion-report-pcr-26372,-,-,There is no interconnector between Cameroon and Congo as they share a hydro power project TRNCMRXXGABXX,CMRXX,GABXX,CMR,GAB,0,0,-,-,https://www.afdb.org/en/documents/document/angola-burundi-cameroon-car-chad-congo-drc-gabon-equatorial-guinea-rwanda-study-on-interconnection-of-power-grids-of-eccas-member-countries-project-completion-report-pcr-26372,-,-,"There is a 22 km fibre optic interconnection between Cameroon and Gabon, but no power project data exists." TRNCMRXXGNQXX,CMRXX,GNQXX,CMR,GNQ,0,0,-,-,https://www.nepad.org/countries/equatorial-guinea,https://en.wikipedia.org/wiki/Segesa,-,- TRNCMRXXNGAXX,CMRXX,NGAXX,CMR,NGA,0,0,-,-,https://openinframap.org/#4.99/7.09/8.96,-,-,- TRNCMRXXTCDXX,CMRXX,TCDXX,CMR,TCD,0,0,-,-,https://www.nsenergybusiness.com/projects/cameroon-chad-interconnection-project/,-,-,- TRNCODXXCOGXX,CODXX,COGXX,COD,COG,60,60,-,-,https://www.sciencedirect.com/science/article/pii/S0973082615300065,-,No information found on new capacity coming online post 2015 study. No new lines visible following 2019 IEA study. ,- TRNCODXXRWAXX,CODXX,RWAXX,COD,RWA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X,-,-,- TRNCODXXSSDXX,CODXX,SSDXX,COD,SSD,0,0,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,No existing lines between COD and SSD and no reported concrete plans within the World Bank Report so existing and planned capacities set to 0.,- TRNCODXXTZAXX,CODXX,TZAXX,COD,TZA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNCODXXUGAXX,CODXX,UGAXX,COD,UGA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNCODXXZMBXX,CODXX,ZMBXX,COD,ZMB,827,827,-,-,https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010,-,-,- TRNCOGXXGABXX,COGXX,GABXX,COG,GAB,0,0,-,-,https://openinframap.org/#3.96/-1.55/18.73,-,-,"Feasibility studies have been undertaken, but no existing or planned capacity at present." TRNCOLXXECUXX,COLXX,ECUXX,COL,ECU,363,363,230;230;138,213;213;17,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,Assumed that the Ipiales - Tulcan interconnection is 113 MW (higher given value) instead of 35 MW.,- TRNCOLXXPANXX,COLXX,PANXX,COL,PAN,0,0,-,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,No listed operational interconnector projects in the CIER document. TRNCOLXXPERXX,COLXX,PERXX,COL,PER,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,No listed operational interconnector projects in the CIER document. TRNCOLXXVENXX,COLXX,VENXX,COL,VEN,380,380,230;115;230,130;;49,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,Assumed that all three interconnectors that are currently not operational will become operational again due to renewed relationships between both countries.,- TRNCRIXXNICXX,CRIXX,NICXX,CRI,NIC,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNCRIXXPANXX,CRIXX,PANXX,CRI,PAN,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNCYPXXEGYXX,CYPXX,EGYXX,CYP,EGY,0,0,-,-,https://www.euroafrica-interconnector.com/,-,-,- TRNCYPXXGRCXX,CYPXX,GRCXX,CYP,GRC,0,0,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXISRXX,CYPXX,ISRXX,CYP,ISR,0,0,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXLBNXX,CYPXX,LBNXX,CYP,LBN,0,0,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXSYRXX,CYPXX,SYRXX,CYP,SYR,0,0,-,-,https://euroasia-interconnector.com/at-glance/,-,-,- TRNCYPXXTURXX,CYPXX,TURXX,CYP,TUR,0,0,-,-,https://cyprus-mail.com/2023/07/02/norths-electricity-deal-with-turkey-as-elusive-as-ever/,-,-,- TRNCZEXXDEUXX,CZEXX,DEUXX,CZE,DEU,1600,1600,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXPOLXX,CZEXX,POLXX,CZE,POL,1400,1400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNCZEXXSVKXX,CZEXX,SVKXX,CZE,SVK,1800,1800,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXDNKXX,DEUXX,DNKXX,DEU,DNK,3700,3700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXFRAXX,DEUXX,FRAXX,DEU,FRA,3000,3000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXGBRXX,DEUXX,GBRXX,DEU,GBR,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXLUXXX,DEUXX,LUXXX,DEU,LUX,2300,2300,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXNLDXX,DEUXX,NLDXX,DEU,NLD,3950,3950,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXNORXX,DEUXX,NORXX,DEU,NOR,1400,1400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXPOLXX,DEUXX,POLXX,DEU,POL,1000,1000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDEUXXSWEXX,DEUXX,SWEXX,DEU,SWE,615,615,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDJIXXERIXX,DJIXX,ERIXX,DJI,ERI,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNDJIXXETHXX,DJIXX,ETHXX,DJI,ETH,180,180,230,283,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015,-,-,- TRNDJIXXSOMXX,DJIXX,SOMXX,DJI,SOM,0,0,-,-,https://eappool.org/eoi-feasibility-study-for-ethiopia-somalia-interconnectors/,https://openinframap.org/#4.86/11.91/46.9,-,- TRNDJIXXYEMXX,DJIXX,YEMXX,DJI,YEM,0,0,-,-,https://www.constructafrica.com/news/djibouti-us55m-approved-power-interconnection-project,-,-,- TRNDNKXXGBRXX,DNKXX,GBRXX,DNK,GBR,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXNLDXX,DNKXX,NLDXX,DNK,NLD,700,700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXNORXX,DNKXX,NORXX,DNK,NOR,1640,1640,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDNKXXSWEXX,DNKXX,SWEXX,DNK,SWE,2450,2450,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNDOMXXHTIXX,DOMXX,HTIXX,DOM,HTI,0,0,-,-,https://deetkenimpact.com/blog/its-time-for-a-renewable-energy-transition-in-haiti/,-,-,Haiti consists of multiple isolated micogrids with not centralized system nor integration with the Dominican Republic. TRNDZAXXESHXX,DZAXX,ESHXX,DZA,ESH,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXESPXX,DZAXX,ESPXX,DZA,ESP,2000,2000,500,-,https://www.sciencedirect.com/science/article/pii/S2096511718300033,-,-,- TRNDZAXXFRAXX,DZAXX,FRAXX,DZA,FRA,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXITAXX,DZAXX,ITAXX,DZA,ITA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S2352484718302981#fig3,-,-,"Feasibility studies have been undertaken, but no existing or planned capacity at present." TRNDZAXXLBYXX,DZAXX,LBYXX,DZA,LBY,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXMARXX,DZAXX,MARXX,DZA,MAR,1400,1400,400,-,https://www.sciencedirect.com/science/article/pii/S2096511718300033,-,-,- TRNDZAXXMLIXX,DZAXX,MLIXX,DZA,MLI,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXMRTXX,DZAXX,MRTXX,DZA,MRT,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXNERXX,DZAXX,NERXX,DZA,NER,0,0,-,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,-,-,- TRNDZAXXTUNXX,DZAXX,TUNXX,DZA,TUN,280,280,90;90;150;225;400,-,https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f,"https://reglobal.org/tunisia-focuses-on-grid-expansion-for-integrating-renewable-energy/#:~:text=Currently%2C%20the%20Tunisian%20network%20is,but%20are%20currently%20not%20functional.",-,- TRNECUXXPERXX,ECUXX,PERXX,ECU,PER,100,100,230,104,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNEGYXXGRCXX,EGYXX,GRCXX,EGY,GRC,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNEGYXXISRXX,EGYXX,ISRXX,EGY,ISR,0,0,-,-,https://www.sciencedirect.com/science/article/abs/pii/S0301421516304797,-,-,- TRNEGYXXJORXX,EGYXX,JORXX,EGY,JOR,300,300,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNEGYXXLBYXX,EGYXX,LBYXX,EGY,LBY,240,240,-,-,https://www.eia.gov/international/analysis/country/LBY,-,-,- TRNEGYXXSAUXX,EGYXX,SAUXX,EGY,SAU,0,0,-,-,"https://reglobal.org/egypts-re-transition-focus-on-becoming-a-regional-energy-hub/#:~:text=In%20addition%2C%20Egypt%27s%20grid%20is,be%20transmitted%20under%20the%20project.",https://renewablewatch.in/2023/08/30/transmission-ties-saudi-arabias-regional-connections/,-,- TRNEGYXXSDNXX,EGYXX,SDNXX,EGY,SDN,300,300,220,70,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNERIXXETHXX,ERIXX,ETHXX,ERI,ETH,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNERIXXSAUXX,ERIXX,SAUXX,ERI,SAU,0,0,-,-,https://openinframap.org/#5.46/15.568/44.323,-,-,- TRNERIXXSDNXX,ERIXX,SDNXX,ERI,SDN,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNERIXXYEMXX,ERIXX,YEMXX,ERI,YEM,0,0,-,-,https://openinframap.org/#4.45/15.69/47.3,-,-,- TRNESHXXMARXX,ESHXX,MARXX,ESH,MAR,800,800,400,-,https://www.sciencedirect.com/science/article/pii/S0962629823000495#bib85,-,-,- TRNESHXXMRTXX,ESHXX,MRTXX,ESH,MRT,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S2352484718302981#fig3,-,-,- TRNESPXXFRAXX,ESPXX,FRAXX,ESP,FRA,2800,2800,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESPXXMARXX,ESPXX,MARXX,ESP,MAR,1400,1400,-,-,https://www.sciencedirect.com/science/article/pii/S2096511718300033,-,-,- TRNESPXXPRTXX,ESPXX,PRTXX,ESP,PRT,2300,2700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXFINXX,ESTXX,FINXX,EST,FIN,1016,1016,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXLVAXX,ESTXX,LVAXX,EST,LVA,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNESTXXRUSNW,ESTXX,RUSNW,EST,RUS,0,0,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNETHXXKENXX,ETHXX,KENXX,ETH,KEN,2000,2000,-,-,https://www.ketraco.co.ke/transmission/projects/completed/eastern-electricity-highway-project-eehp-kenya-ethiopia,-,-,- TRNETHXXSDNXX,ETHXX,SDNXX,ETH,SDN,4000,4000,-,-,https://www.au-pida.org/view-project/312/,-,-,- TRNETHXXSSDXX,ETHXX,SSDXX,ETH,SSD,0,0,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,-,- TRNFINXXNORXX,FINXX,NORXX,FIN,NOR,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFINXXRUSNW,FINXX,RUSNW,FIN,RUS,0,0,-,-,https://www.fingrid.fi/globalassets/dokumentit/fi/kantaverkko/kantaverkon-kehittaminen/fingrid_kehittamissuunnitelma_syksy23_en.pdf,https://www.reuters.com/markets/europe/russia-cuts-power-exports-finland-over-failed-payments-2022-05-16/,-,"Historically transmission lines existed between FIN and RUSNW (+320 MW, -1300 MW) but these have been decomissioned as of 2022 following the Ukraine-Russia conflict." TRNFINXXSWEXX,FINXX,SWEXX,FIN,SWE,2400,2400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXGBRXX,FRAXX,GBRXX,FRA,GBR,3000,3000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXIRLXX,FRAXX,IRLXX,FRA,IRL,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXITAXX,FRAXX,ITAXX,FRA,ITA,2900,3100,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNFRAXXLUXXX,FRAXX,LUXXX,FRA,LUX,380,380,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGABXXGNQXX,GABXX,GNQXX,GAB,GNQ,0,0,-,-,https://www.seetao.com/details/214749.html,-,-,- TRNGBRXXIRLXX,GBRXX,IRLXX,GBR,IRL,630,630,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGBRXXISLXX,GBRXX,ISLXX,GBR,ISL,0,0,-,-,https://www.ruv.is/frettir/innlent/saestrengur-ekki-lengur-samkeppnishaefur,-,-,- TRNGBRXXNLDXX,GBRXX,NLDXX,GBR,NLD,1000,1000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGBRXXNORXX,GBRXX,NORXX,GBR,NOR,1400,1400,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGEOXXRUSSO,GEOXX,RUSSO,GEO,RUS,950,950,500;220,-,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,TTC Winter capacity assumed for existing capacities (Table 1.3) (650 + 300 MW).,- TRNGEOXXTURXX,GEOXX,TURXX,GEO,TUR,150,150,220,-,https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF,-,-,- TRNGHAXXTGOXX,GHAXX,TGOXX,GHA,TGO,438,438,330;161;161,-,https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,The GHA-TGO section of the WAPP coastal backbone project was synchronized in 2019. TRNGINXXGNBXX,GINXX,GNBXX,GIN,GNB,0,0,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNGINXXLBRXX,GINXX,LBRXX,GIN,LBR,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNGINXXMLIXX,GINXX,MLIXX,GIN,MLI,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNGINXXSENXX,GINXX,SENXX,GIN,SEN,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNGINXXSLEXX,GINXX,SLEXX,GIN,SLE,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNGMBXXSENXX,GMBXX,SENXX,GMB,SEN,0,0,-,-,https://www.ecowapp.org/sites/default/files/volume_0.pdf,-,-,- TRNGNBXXSENXX,GNBXX,SENXX,GNB,SEN,0,0,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNGRCXXITAXX,GRCXX,ITAXX,GRC,ITA,500,500,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRCXXLBYXX,GRCXX,LBYXX,GRC,LBY,0,0,-,-,https://docstore.entsoe.eu/Documents/TYNDP%20documents/TYNDP%202016/projects/P0284.pdf,-,-,- TRNGRCXXMKDXX,GRCXX,MKDXX,GRC,MKD,1100,1100,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRCXXTURXX,GRCXX,TURXX,GRC,TUR,660,660,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNGRLXXISLXX,GRLXX,ISLXX,GRL,ISL,0,0,-,-,https://openinframap.org/#3.64/62.81/-27.7,-,-,- TRNGTMXXHNDXX,GTMXX,HNDXX,GTM,HND,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNGTMXXMEXXX,GTMXX,MEXXX,GTM,MEX,200,200,400,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNGTMXXSLVXX,GTMXX,SLVXX,GTM,SLV,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNGUFXXSURXX,GUFXX,SURXX,GUF,SUR,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNGUYXXSURXX,GUYXX,SURXX,GUY,SUR,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,- TRNGUYXXVENXX,GUYXX,VENXX,GUY,VEN,0,0,-,-,https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf,-,-,No listed interconnector projects operating or planned in the CIER document. TRNHNDXXNICXX,HNDXX,NICXX,HND,NIC,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNHNDXXSLVXX,HNDXX,SLVXX,HND,SLV,300,300,230,-,https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf,-,-,- TRNHRVXXHUNXX,HRVXX,HUNXX,HRV,HUN,1700,1700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHRVXXMNEXX,HRVXX,MNEXX,HRV,MNE,0,0,-,-,https://www.entsoe.eu/data/map/,-,-,- TRNHRVXXSRBXX,HRVXX,SRBXX,HRV,SRB,500,500,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHRVXXSVNXX,HRVXX,SVNXX,HRV,SVN,2000,2000,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXROUXX,HUNXX,ROUXX,HUN,ROU,1100,1100,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXSRBXX,HUNXX,SRBXX,HUN,SRB,750,750,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXSVKXX,HUNXX,SVKXX,HUN,SVK,1800,1300,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXSVNXX,HUNXX,SVNXX,HUN,SVN,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNHUNXXUKRXX,HUNXX,UKRXX,HUN,UKR,650,650,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNIDNJWIDNKA,IDNJW,IDNKA,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNJWIDNNU,IDNJW,IDNNU,IDN,IDN,400,400,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,"Indicated transfer limit of 2000 MW between Bali and Java as of 2020 following the IESR study, however following the 2021-2030 National Electricity Supply Business Plan of the Indonesian government the new 500 kv, 220 km, 1600 MW project is still marked as in development with no indicated final completetion year. Existing capacity is therefore considered to be 400 MW.",- TRNIDNJWIDNSM,IDNJW,IDNSM,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,"Indicated transfer limit of 3000 MW between Sumatra and Java as of 2024 following the IESR study, however following the 2021-2030 The National Electricity Supply Business Plan of the Indonesian government the project is still marked as in development. Further reports state that the project is considered a priority project within the upcoming 2024-2034 long-term electricity procurement plan (https://www.thejakartapost.com/business/2023/11/21/ri-eyes-building-java-sumatra-power-transmission-project-with-jetp-funding.html) however no confirmed completion year to be found as of yet. ",- TRNIDNKAIDNSL,IDNKA,IDNSL,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNKAMYSSH,IDNKA,MYSSH,IDN,MYS,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,-,-,- TRNIDNKAMYSSK,IDNKA,MYSSK,IDN,MYS,230,230,275,128.2,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,"https://www.nsenergybusiness.com/projects/trans-borneo-power-grid/#:~:text=On%20the%20Indonesian%20side%2C%20the,and%20Lumar%20of%20Bengkayang%20district.",-,- TRNIDNMLIDNPP,IDNML,IDNPP,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNMLIDNSL,IDNML,IDNSL,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNNUIDNSL,IDNNU,IDNSL,IDN,IDN,0,0,-,-,https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf,https://gatrik.esdm.go.id/assets/uploads/download_index/files/38622-ruptl-pln-2021-2030.pdf,-,No mentioning of existing or planned transmission lines outside the Java-Sumatra-Nusa Tenggara boundaries. TRNIDNNUTLSXX,IDNNU,TLSXX,IDN,TLS,0,0,-,-,https://openinframap.org/#5.9/-8.829/124.842,-,-,- TRNIDNPPPNGXX,IDNPP,PNGXX,IDN,PNG,0,0,-,-,https://openinframap.org/#4.84/-6.52/146.34,https://hir.harvard.edu/electrification-in-papua-new-guinea/,-,"Papua New Guinea is just undergoing national electrification now, and as a result there are no current or planned interconnections with Indonesia or other countries." TRNIDNSMMYSPE,IDNSM,MYSPE,IDN,MYS,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,-,-,- TRNIDNSMSGPXX,IDNSM,SGPXX,IDN,SGP,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,-,-,- TRNINDEAINDNE,INDEA,INDNE,IND,IND,2860,2860,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDEAINDNO,INDEA,INDNO,IND,IND,22530,22530,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDEAINDSO,INDEA,INDSO,IND,IND,7830,7830,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDEAINDWE,INDEA,INDWE,IND,IND,21190,21190,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDEANPLXX,INDEA,NPLXX,IND,NPL,700,700,400,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,https://irade.org/Final%20report%20of%20study_NSB%20India.pdf,-,- TRNINDNEINDNO,INDNE,INDNO,IND,IND,3000,3000,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDNEMMRXX,INDNE,MMRXX,IND,MMR,3,3,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,https://irade.org/Final%20report%20of%20study_NSB%20India.pdf,-,- TRNINDNOINDWE,INDNO,INDWE,IND,IND,36720,36720,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDNONPLXX,INDNO,NPLXX,IND,NPL,70,70,132;132,-,https://kathmandupost.com/national/2023/09/06/nepal-now-can-export-180-mw-more-electricity-to-india,-,Existing includes 70 MW 132 kv line (Mahendranagar-Tankapur). Also new 132 kv line finalized in October 2023 (Nautanwa-Mainaiya) but MW capacity is unkown. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).,- TRNINDNOPAKXX,INDNO,PAKXX,IND,PAK,0,0,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,https://economictimes.indiatimes.com/industry/energy/power/pakistan-to-import-electricity-from-india-report/articleshow/32360374.cms,-,There is the potential for power exchange between IND and PAK (and this has been tested historically) yet currently no active power exchange. TRNINDSOINDWE,INDSO,INDWE,IND,IND,18120,18120,-,-,https://www.powergrid.in/,https://cea.nic.in/wp-content/uploads/notification/2023/06/NEP_2022_32_FINAL_GAZETTE_English.pdf,-,- TRNINDSOLKAXX,INDSO,LKAXX,IND,LKA,0,0,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNINDWEOMNXX,INDWE,OMNXX,IND,OMN,0,0,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,-,-,- TRNINDWEPAKXX,INDWE,PAKXX,IND,PAK,0,0,-,-,https://powermin.gov.in/en/content/interconnection-neighbouring-countries,https://economictimes.indiatimes.com/industry/energy/power/pakistan-to-import-electricity-from-india-report/articleshow/32360374.cms,-,There is the potential for power exchange between IND and PAK (and this has been tested historically) yet currently no active power exchange nor any pending developments mentioned on the website of the ministry of power of the Indian government. TRNINDWESAUXX,INDWE,SAUXX,IND,SAU,0,0,-,-,https://openinframap.org/#4.16/20.3/63.43,-,-,- TRNIRNXXIRQXX,IRNXX,IRQXX,IRN,IRQ,1500,1500,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNIRNXXOMNXX,IRNXX,OMNXX,IRN,OMN,0,0,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNIRNXXPAKXX,IRNXX,PAKXX,IRN,PAK,70,70,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNIRNXXTKMXX,IRNXX,TKMXX,IRN,TKM,380,380,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNIRNXXTURXX,IRNXX,TURXX,IRN,TUR,490,490,-,-,https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf,-,-,- TRNIRQXXJORXX,IRQXX,JORXX,IRQ,JOR,0,0,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNIRQXXKWTXX,IRQXX,KWTXX,IRQ,KWT,0,0,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNIRQXXSAUXX,IRQXX,SAUXX,IRQ,SAU,0,0,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNIRQXXSYRXX,IRQXX,SYRXX,IRQ,SYR,300,300,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNIRQXXTURXX,IRQXX,TURXX,IRQ,TUR,400,400,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNISRXXJORXX,ISRXX,JORXX,ISR,JOR,0,20,-,-,https://www.gov.il/en/departments/news/press_081122,-,-,- TRNISRXXLBNXX,ISRXX,LBNXX,ISR,LBN,0,0,-,-,https://www.sciencedirect.com/science/article/abs/pii/S0301421516304797,-,-,- TRNISRXXSYRXX,ISRXX,SYRXX,ISR,SYR,0,0,-,-,https://www.sciencedirect.com/science/article/abs/pii/S0301421516304797,-,-,- TRNITAXXMLTXX,ITAXX,MLTXX,ITA,MLT,200,200,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXMNEXX,ITAXX,MNEXX,ITA,MNE,600,600,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXSVNXX,ITAXX,SVNXX,ITA,SVN,660,660,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNITAXXTUNXX,ITAXX,TUNXX,ITA,TUN,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNJORXXSAUXX,JORXX,SAUXX,JOR,SAU,0,0,-,-,https://npolicy.org/Articles/March%202018%20Drafts/Mills_Saudi_Arabia_Feb18.pdf,-,-,- TRNJORXXSYRXX,JORXX,SYRXX,JOR,SYR,300,300,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNJPNCEJPNKY,JPNCE,JPNKY,JPN,JPN,520,2780,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNJPNCEJPNSH,JPNCE,JPNSH,JPN,JPN,2600,2600,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,https://ieeexplore.ieee.org/document/19139,-,Existing capacity consists of 1400 MW capacity between Shikoku and Kansai (Energies paper) and 1200 MW between Shikoku and Chugoku (IEEE Electrical Insulation Magazine paper). TRNJPNCEJPNTO,JPNCE,JPNTO,JPN,JPN,2100,2100,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNJPNCEKORXX,JPNCE,KORXX,JPN,KOR,0,0,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNJPNHOJPNTO,JPNHO,JPNTO,JPN,JPN,900,900,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNJPNHORUSFE,JPNHO,RUSFE,JPN,RUS,0,0,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNJPNKYKORXX,JPNKY,KORXX,JPN,KOR,0,0,-,-,https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan,-,-,- TRNKAZXXKGZXX,KAZXX,KGZXX,KAZ,KGZ,2790,2790,500;500;220;220;220;220,215.7;120;176;189;170;102.26,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ,- TRNKAZXXRUSCE,KAZXX,RUSCE,KAZ,RUS,0,0,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Existing capacities are from Table 3.1 (translated from Russian).,- TRNKAZXXRUSMV,KAZXX,RUSMV,KAZ,RUS,10,10,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Existing capacities are from Table 3.1 (translated from Russian).,- TRNKAZXXRUSSI,KAZXX,RUSSI,KAZ,RUS,50,50,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Existing capacities are from Table 3.1 (translated from Russian).,- TRNKAZXXRUSSO,KAZXX,RUSSO,KAZ,RUS,10,10,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Existing capacities are from Table 3.1 (translated from Russian).,- TRNKAZXXRUSUR,KAZXX,RUSUR,KAZ,RUS,280,280,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,Existing capacities are from Table 3.1 (translated from Russian).,- TRNKAZXXTKMXX,KAZXX,TKMXX,KAZ,TKM,0,0,-,-,https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf,-,-,No existing/planned lines on KAZ grid map that is up to date as of 2023. TRNKAZXXUZBXX,KAZXX,UZBXX,KAZ,UZB,1000,1000,500;220;220;110,111.6;117.4;110.5;37.2,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,- TRNKENXXSOMXX,KENXX,SOMXX,KEN,SOM,0,0,-,-,https://www.ketraco.co.ke/transmission/eastern-africa-power-pools,https://www.ketraco.co.ke/transmission/eastern-africa-power-pools,-,Kenya Power has not listed a regional interconnector. TRNKENXXSSDXX,KENXX,SSDXX,KEN,SSD,0,0,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,-,No existing lines between KEN and SSD following the World Bank Report. TRNKENXXTZAXX,KENXX,TZAXX,KEN,TZA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNKENXXUGAXX,KENXX,UGAXX,KEN,UGA,145,145,220,127,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,https://www.afdb.org/fileadmin/uploads/afdb/Documents/Procurement/Project-related-Procurement/AOIKenyaKETRACO%206-12.pdf,-,- TRNKGZXXTJKXX,KGZXX,TJKXX,KGZ,TJK,130,130,220,53.2,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ,- TRNKGZXXUZBXX,KGZXX,UZBXX,KGZ,UZB,2830,2830,500;220;220;220;220;220;220,89.7;87.6;78.7;76.9;69.3;45.9;35.9,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ,- TRNKHMXXLAOXX,KHMXX,LAOXX,KHM,LAO,2600,2600,500;230,-,https://www.bangkokpost.com/business/1831359/laos-links-195mw-power-to-cambodia,https://laotiantimes.com/2023/01/06/laos-cambodia-to-cooperate-in-power-transmission-line-project/,-,New 500 kV line (2.4 GW) operational since 2023 on top of existing 200 MW line operational since 2020. TRNKHMXXTHAXX,KHMXX,THAXX,KHM,THA,230,230,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,https://openresearchsoftware.metajnl.com/articles/10.5334/jors.302,-,- TRNKHMXXVNMCE,KHMXX,VNMCE,KHM,VNM,0,0,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,https://openinframap.org/#6.14/12.294/109.124,-,- TRNKHMXXVNMSO,KHMXX,VNMSO,KHM,VNM,200,200,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,https://openinframap.org/#6.14/12.294/109.124,-,- TRNKORXXPRKXX,KORXX,PRKXX,KOR,PRK,0,0,-,-,https://www.eia.gov/international/analysis/country/PRK,-,-,- TRNKOSXXMKDXX,KOSXX,MKDXX,KOS,MKD,519,630,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNKOSXXMNEXX,KOSXX,MNEXX,KOS,MNE,553,502,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNKOSXXSRBXX,KOSXX,SRBXX,KOS,SRB,574,709,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNKWTXXSAUXX,KWTXX,SAUXX,KWT,SAU,1200,1200,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNLAOXXMMRXX,LAOXX,MMRXX,LAO,MMR,0,0,-,-,https://www.greatermekong.org/projects/projects/230-kv-lao-pdr-myanmar-power-interconnection-5131,-,-,- TRNLAOXXTHAXX,LAOXX,THAXX,LAO,THA,5427,5427,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,-,-,- TRNLAOXXVNMCE,LAOXX,VNMCE,LAO,VNM,538,0,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,https://en.evn.com.vn/d6/news/Laos-boosts-electricity-exports-to-Vietnam-Cambodia-66-163-2945.aspx,-,- TRNLAOXXVNMNO,LAOXX,VNMNO,LAO,VNM,0,0,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,https://en.evn.com.vn/d6/news/Laos-boosts-electricity-exports-to-Vietnam-Cambodia-66-163-2945.aspx,-,- TRNLBNXXSYRXX,LBNXX,SYRXX,LBN,SYR,500,500,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNLBRXXSLEXX,LBRXX,SLEXX,LBR,SLE,406,406,-,-,https://cdn.gihub.org/umbraco/media/2519/gih-showcase-projects-2019-cslg-interconnector-project-art-web.pdf,-,-,- TRNLBYXXMLTXX,LBYXX,MLTXX,LBY,MLT,0,0,-,-,https://timesofmalta.com/articles/view/malta-signs-preliminary-agreement-libya-electricity-interconnector.1039428,-,-,- TRNLBYXXNERXX,LBYXX,NERXX,LBY,NER,0,0,-,-,https://openinframap.org/#3.92/23.11/22.6,-,-,- TRNLBYXXSDNXX,LBYXX,SDNXX,LBY,SDN,0,0,-,-,https://openinframap.org/#3.92/23.11/22.6,-,-,- TRNLBYXXTCDXX,LBYXX,TCDXX,LBY,TCD,0,0,-,-,https://openinframap.org/#3.92/23.11/22.6,-,-,- TRNLBYXXTUNXX,LBYXX,TUNXX,LBY,TUN,300,300,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNLSOXXZAFXX,LSOXX,ZAFXX,LSO,ZAF,230,230,-,-,https://doi.org/10.17159/2413-3051/2018/v29i4a5581,-,-,- TRNLTUXXLVAXX,LTUXX,LVAXX,LTU,LVA,950,950,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLTUXXPOLXX,LTUXX,POLXX,LTU,POL,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLTUXXRUSNW,LTUXX,RUSNW,LTU,RUS,0,0,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNLTUXXSWEXX,LTUXX,SWEXX,LTU,SWE,700,700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNLVAXXRUSNW,LVAXX,RUSNW,LVA,RUS,0,0,-,-,https://www.reuters.com/business/energy/estonia-lithuania-says-baltic-states-decouple-russian-power-grid-early-2025-2023-07-17/,-,Transmission lines do exist between the baltic states and RUSNW but the baltic states are working on decoupling from the RUSNW grid in either 2024/2025 so we made the assumption to set existing capacities to 0. This also means that no new projects are on the horizon.,- TRNLVAXXSWEXX,LVAXX,SWEXX,LVA,SWE,0,0,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMARXXPRTXX,MARXX,PRTXX,MAR,PRT,0,0,-,-,https://med-tso.org/wp-content/uploads/2022/02/MA-PT_project_sheet.pdf,-,-,- TRNMDAXXROUXX,MDAXX,ROUXX,MDA,ROU,416,1210,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNMDAXXUKRXX,MDAXX,UKRXX,MDA,UKR,984,489,-,-,https://transparency.entsoe.eu/transmission-domain/physicalFlow/show,-,Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. UKR and MDA synchronized in 2022 and started exchange. This is likely to be expanded but to-date no concrete plans for new lines.,This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf TRNMEXXXUSAAZ,MEXXX,USAAZ,MEX,USA,0,0,-,-,https://fordschool.umich.edu/sites/default/files/2022-04/NACP_Lopez-Vallejo.pdf,-,-,- TRNMEXXXUSACI,MEXXX,USACI,MEX,USA,800,600,230,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,- TRNMEXXXUSAEP,MEXXX,USAEP,MEX,USA,0,0,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,Two 115 kv lines exist between the service area of El Paso Electric and Mexico but is for emergency use only and not for regular trade purposes so not included.,- TRNMEXXXUSAER,MEXXX,USAER,MEX,USA,400,940,138;230,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,"In addition to the reported capacities, a number of additional smaller lines exist between the service area of ERCOT and Mexico but is for emergency use only and not for regular trade purposes so not included.",- TRNMEXXXUSAII,MEXXX,USAII,MEX,USA,0,0,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,- TRNMEXXXUSAPN,MEXXX,USAPN,MEX,USA,0,0,-,-,https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf,-,-,- TRNMKDXXSRBXX,MKDXX,SRBXX,MKD,SRB,540,540,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMLIXXMRTXX,MLIXX,MRTXX,MLI,MRT,0,0,-,-,https://www.afdb.org/en/news-and-events/press-releases/development-partners-express-support-900-million-mauritania-mali-power-line-63179,-,-,- TRNMLIXXNERXX,MLIXX,NERXX,MLI,NER,0,0,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNMLIXXSENXX,MLIXX,SENXX,MLI,SEN,250,250,225,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNMLTXXTUNXX,MLTXX,TUNXX,MLT,TUN,0,0,-,-,https://www.tunur.tn/500mw-solar-export-from-tunisia-to-europe/transmission/,-,-,- TRNMMRXXTHAXX,MMRXX,THAXX,MMR,THA,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://openinframap.org/#4.49/14.69/106.17,-,- TRNMNEXXSRBXX,MNEXX,SRBXX,MNE,SRB,580,580,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNMNGXXRUSSI,MNGXX,RUSSI,MNG,RUS,345,345,-,-,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,-,- TRNMOZXXMWIXX,MOZXX,MWIXX,MOZ,MWI,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMOZXXSWZXX,MOZXX,SWZXX,MOZ,SWZ,1450,1450,400,-,https://www.sapp.co.zw/interconnectors,-,-,Existing Capacity is in reference to the MOTRACO transmission line. TRNMOZXXTZAXX,MOZXX,TZAXX,MOZ,TZA,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMOZXXZAFXX,MOZXX,ZAFXX,MOZ,ZAF,3850,3850,533;275;110;400,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMOZXXZMBXX,MOZXX,ZMBXX,MOZ,ZMB,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMOZXXZWEXX,MOZXX,ZWEXX,MOZ,ZWE,500,500,400,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMRTXXSENXX,MRTXX,SENXX,MRT,SEN,250,250,225,414,https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf,-,-,Existing 250 MW transmission line (see appendix A of Power Africa report) commissioned in 2022. TRNMWIXXTZAXX,MWIXX,TZAXX,MWI,TZA,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMWIXXZMBXX,MWIXX,ZMBXX,MWI,ZMB,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNMYSPEMYSSK,MYSPE,MYSSK,MYS,MYS,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,-,- TRNMYSPESGPXX,MYSPE,SGPXX,MYS,SGP,1000,1000,-,-,"https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.",-,-,Increase to 1000 MW bilateral capacity formalized in 2022/2023. TRNMYSPETHAXX,MYSPE,THAXX,MYS,THA,380,380,300;132,110;,https://ieeexplore.ieee.org/document/1177614,"https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.",-,- TRNMYSSHMYSSK,MYSSH,MYSSK,MYS,MYS,0,0,-,-,https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343,-,-,- TRNMYSSHPHLLU,MYSSH,PHLLU,MYS,PHL,0,0,-,-,https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf,-,-,- TRNNAMXXZAFXX,NAMXX,ZAFXX,NAM,ZAF,350,350,220,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNNAMXXZMBXX,NAMXX,ZMBXX,NAM,ZMB,300,300,350,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNNERXXNGAXX,NERXX,NGAXX,NER,NGA,80,80,132,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNNERXXTCDXX,NERXX,TCDXX,NER,TCD,0,0,-,-,https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf,-,-,- TRNNGAXXTCDXX,NGAXX,TCDXX,NGA,TCD,0,0,-,-,https://africa-energy-portal.org/news/nigeria-considers-supplying-electricity-chad,-,-,- TRNNGAXXTGOXX,NGAXX,TGOXX,NGA,TGO,0,0,-,-,https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf,-,-,- TRNNLDXXNORXX,NLDXX,NORXX,NLD,NOR,700,700,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNNORXXRUSNW,NORXX,RUSNW,NOR,RUS,0,0,-,-,"https://thebarentsobserver.com/en/industry-and-energy/2022/04/nordic-grid-cuts-russian-power#:~:text=The%20line%20between%20the%20Norwegian,transmitted%20over%20the%20past%20years.",-,NOR has disconnected the small existing line (50 MW) with RUS as of 2022. ,- TRNNORXXSWEXX,NORXX,SWEXX,NOR,SWE,3695,3695,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNOMNXXPAKXX,OMNXX,PAKXX,OMN,PAK,0,0,-,-,https://openinframap.org/#5.6/25.698/53.822,-,-,- TRNOMNXXSAUXX,OMNXX,SAUXX,OMN,SAU,400,400,220,-,https://www.enerdata.net/publications/daily-energy-news/oman-and-saudi-arabia-mull-develop-12-gw-power-interconnector.html,-,-,- TRNOMNXXYEMXX,OMNXX,YEMXX,OMN,YEM,0,0,-,-,https://www.arabfund.org/default.aspx?pageId=454,https://openinframap.org/#5.34/18.893/51.435,-,- TRNPAKXXTJKXX,PAKXX,TJKXX,PAK,TJK,0,0,-,-,https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,- TRNPHLLUPHLVI,PHLLU,PHLVI,PHL,PHL,440,440,-,-,https://www.researchgate.net/publication/261876281_A_Guide_to_Operational_Impact_Analysis_of_Variable_Renewables_Application_to_the_Philippines,https://openknowledge.worldbank.org/entities/publication/43f737aa-a50a-5097-a1b9-8c93c5232f7a,-,- TRNPHLMIPHLVI,PHLMI,PHLVI,PHL,PHL,0,0,-,-,https://www.ngcp.ph/article?cid=16636,https://www.researchgate.net/publication/261876281_A_Guide_to_Operational_Impact_Analysis_of_Variable_Renewables_Application_to_the_Philippines,-,- TRNPOLXXSVKXX,POLXX,SVKXX,POL,SVK,1980,1980,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNPOLXXSWEXX,POLXX,SWEXX,POL,SWE,600,600,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNPOLXXUKRXX,POLXX,UKRXX,POL,UKR,1215,1215,-,-,https://ubn.news/ukraine-and-poland-are-upgrading-the-interstate-transmission-line/,-,"Following the news report, existing capacity as of early 2023 is estimated to be roughly 1215 MW following the synchronization of Ukraine with the ENTSO-E service area.",New 400 kV line entered service in 2023. UKR synchronized with POL (ENTSOE) so further expansion can be expected but no concrete plans can be found as of yet. TRNPRKXXRUSFE,PRKXX,RUSFE,PRK,RUS,0,0,-,-,https://www.eia.gov/international/analysis/country/PRK,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,- TRNQATXXSAUXX,QATXX,SAUXX,QAT,SAU,750,750,-,-,https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B,-,-,- TRNROUXXSRBXX,ROUXX,SRBXX,ROU,SRB,680,680,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNROUXXUKRXX,ROUXX,UKRXX,ROU,UKR,150,150,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNRUSCERUSMV,RUSCE,RUSMV,RUS,RUS,3500,3500,-,-,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSCERUSNW,RUSCE,RUSNW,RUS,RUS,1500,1500,750,473,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSCERUSSO,RUSCE,RUSSO,RUS,RUS,2400,2400,-,-,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSCEUKRXX,RUSCE,UKRXX,RUS,UKR,0,0,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,https://www.garant.ru/products/ipo/prime/doc/404487690/,-,UKR historically was connected with BLR and RUS but disconnected early 2022. TRNRUSFERUSSI,RUSFE,RUSSI,RUS,RUS,0,0,-,-,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSMVRUSUR,RUSMV,RUSUR,RUS,RUS,3000,3000,-,-,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSNWRUSUR,RUSNW,RUSUR,RUS,RUS,0,0,-,-,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations.,- TRNRUSSIRUSUR,RUSSI,RUSUR,RUS,RUS,3300,3300,500,342.5,https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf,-,"Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. Voltage and Distance values (500 kV and 342.5 km) has been added for a new line commissioned in 2022, however, no MW values have been found for this line and are not added. The 3300 MW value only corresponds to the capacities from the 2010 paper.",- TRNRUSSOUKRXX,RUSSO,UKRXX,RUS,UKR,0,0,-,-,https://www.scientificamerican.com/article/how-ukraine-unplugged-from-russia-and-joined-europes-power-grid-with-unprecedented-speed/,-,-,UKR historically was connected with BLR and RUS but disconnected early 2022. TRNRWAXXTZAXX,RWAXX,TZAXX,RWA,TZA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNRWAXXUGAXX,RWAXX,UGAXX,RWA,UGA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNSAUXXSDNXX,SAUXX,SDNXX,SAU,SDN,0,0,-,-,https://openinframap.org/#4.42/22.37/39.06,-,-,- TRNSAUXXYEMXX,SAUXX,YEMXX,SAU,YEM,0,0,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNSDNXXSSDXX,SDNXX,SSDXX,SDN,SSD,32,32,220,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,"Following the World Bank Report; ""South Sudan imports a small amount of electricity from Sudan through a 32 MW/220 kV interconnector in Upper Nile State that distributes power to local customers through the Renk substation, but the supply from this line has been unreliable due to the power shortage in Sudan.""",- TRNSDNXXTCDXX,SDNXX,TCDXX,SDN,TCD,0,0,-,-,https://openinframap.org/#4.42/16.78/24.92,-,-,- TRNSOMXXYEMXX,SOMXX,YEMXX,SOM,YEM,0,0,-,-,https://openinframap.org/#4.42/11.63/44.23,-,-,- TRNSSDXXUGAXX,SSDXX,UGAXX,SSD,UGA,0,0,-,-,https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf,https://openinframap.org/#4.58/8.92/32.93,-,- TRNSVKXXUKRXX,SVKXX,UKRXX,SVK,UKR,650,650,-,-,https://ember-climate.org/data/data-tools/electricity-interconnection-europe/,https://docs.google.com/spreadsheets/d/1NfuG5KZw0k_W-zo-2orJOZkrr6nv1OeOQZzY61KNS4M/edit?usp=sharing,-,- TRNSWZXXZAFXX,SWZXX,ZAFXX,SWZ,ZAF,1176,1176,-,-,https://www.sciencedirect.com/science/article/pii/S254243512200304X?via%3Dihub#da0010,-,-,- TRNSYRXXTURXX,SYRXX,TURXX,SYR,TUR,300,300,-,-,https://www.arabfund.org/default.aspx?pageId=454,-,-,- TRNTJKXXUZBXX,TJKXX,UZBXX,TJK,UZB,850,850,500;220;220,163;49.3;47.95,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,- TRNTKMXXUZBXX,TKMXX,UZBXX,TKM,UZB,850,850,500;220,369.4;67.4,https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf,https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf,-,- TRNTZAXXUGAXX,TZAXX,UGAXX,TZA,UGA,0,0,-,-,https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005,-,-,- TRNTZAXXZMBXX,TZAXX,ZMBXX,TZA,ZMB,0,0,-,-,https://www.sapp.co.zw/interconnectors,-,-,- TRNUSAAAUSABP,USAAA,USABP,USA,USA,298,1116,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSACH,USAAA,USACH,USA,USA,19,22,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSADO,USAAA,USADO,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSAGC,USAAA,USAGC,USA,USA,177,114,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSAIP,USAAA,USAIP,USA,USA,265,153,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSANW,USAAA,USANW,USA,USA,90,142,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAAUSAPW,USAAA,USAPW,USA,USA,218,246,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAIUSAMI,USAAI,USAMI,USA,USA,796,721,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAIUSASP,USAAI,USASP,USA,USA,183,602,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAIUSASW,USAAI,USASW,USA,USA,562,853,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAIUSATV,USAAI,USATV,USA,USA,269,11,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAANUSABP,USAAN,USABP,USA,USA,1260,10,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAANUSAPW,USAAN,USAPW,USA,USA,574,2,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSACI,USAAZ,USACI,USA,USA,1458,325,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSADE,USAAZ,USADE,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAHG,USAAZ,USAHG,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAII,USAAZ,USAII,USA,USA,47,73,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSALD,USAAZ,USALD,USA,USA,822,98,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAPE,USAAZ,USAPE,USA,USA,394,581,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAPN,USAAZ,USAPN,USA,USA,1060,1202,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSASR,USAAZ,USASR,USA,USA,1348,4297,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSATP,USAAZ,USATP,USA,USA,467,195,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAWC,USAAZ,USAWC,USA,USA,1365,267,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAAZUSAWM,USAAZ,USAWM,USA,USA,186,367,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABAUSABP,USABA,USABP,USA,USA,873,1562,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABAUSACI,USABA,USACI,USA,USA,1101,1025,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABAUSANE,USABA,USANE,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABAUSATI,USABA,USATI,USA,USA,274,460,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSACH,USABP,USACH,USA,USA,135,956,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSACI,USABP,USACI,USA,USA,2546,1335,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSADO,USABP,USADO,USA,USA,210,586,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAGC,USABP,USAGC,USA,USA,317,911,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAGD,USABP,USAGD,USA,USA,19,1450,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAIP,USABP,USAIP,USA,USA,130,134,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSALD,USABP,USALD,USA,USA,3026,624,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSANE,USABP,USANE,USA,USA,160,128,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSANW,USABP,USANW,USA,USA,574,1372,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAPG,USABP,USAPG,USA,USA,2395,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAPI,USABP,USAPI,USA,USA,2922,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSAPW,USABP,USAPW,USA,USA,2008,309,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSASL,USABP,USASL,USA,USA,1103,367,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSABPUSATR,USABP,USATR,USA,USA,547,176,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACEUSADU,USACE,USADU,USA,USA,1349,1410,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACEUSAPJ,USACE,USAPJ,USA,USA,1219,1183,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACEUSASC,USACE,USASC,USA,USA,608,369,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACEUSASG,USACE,USASG,USA,USA,83,218,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACEUSAYA,USACE,USAYA,USA,USA,41,69,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACHUSADO,USACH,USADO,USA,USA,291,197,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACHUSAGC,USACH,USAGC,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACHUSAPI,USACH,USAPI,USA,USA,234,175,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSAII,USACI,USAII,USA,USA,266,562,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSALD,USACI,USALD,USA,USA,1246,3178,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSANE,USACI,USANE,USA,USA,296,1401,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSAPW,USACI,USAPW,USA,USA,20,32,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSASR,USACI,USASR,USA,USA,956,2078,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSATI,USACI,USATI,USA,USA,550,204,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACIUSAWC,USACI,USAWC,USA,USA,386,430,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACWUSADU,USACW,USADU,USA,USA,219,356,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACWUSAPJ,USACW,USAPJ,USA,USA,159,165,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSACWUSATV,USACW,USATV,USA,USA,54,58,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADEUSASR,USADE,USASR,USA,USA,576,3,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADOUSAGC,USADO,USAGC,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADOUSAPI,USADO,USAPI,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSAPJ,USADU,USAPJ,USA,USA,1236,1236,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSASA,USADU,USASA,USA,USA,176,232,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSASC,USADU,USASC,USA,USA,167,733,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSASG,USADU,USASG,USA,USA,216,267,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSASO,USADU,USASO,USA,USA,1106,340,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSATV,USADU,USATV,USA,USA,139,256,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSADUUSAYA,USADU,USAYA,USA,USA,41,177,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAEPUSAER,USAEP,USAER,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAEPUSAPN,USAEP,USAPN,USA,USA,137,558,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAEPUSASW,USAEP,USASW,USA,USA,0,129,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAEPUSATP,USAEP,USATP,USA,USA,335,413,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAERUSAMI,USAER,USAMI,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAERUSAPN,USAER,USAPN,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAERUSASP,USAER,USASP,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAERUSASW,USAER,USASW,USA,USA,462,813,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAERUSATV,USAER,USATV,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSAFL,USAFC,USAFL,USA,USA,212,1222,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSAFM,USAFC,USAFM,USA,USA,141,853,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSAGV,USAFC,USAGV,USA,USA,49,62,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSASM,USAFC,USASM,USA,USA,231,680,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSASO,USAFC,USASO,USA,USA,101,300,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSATA,USAFC,USATA,USA,USA,48,170,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFCUSATC,USAFC,USATC,USA,USA,758,330,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSAFM,USAFL,USAFM,USA,USA,518,170,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSAGV,USAFL,USAGV,USA,USA,73,26,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSAHS,USAFL,USAHS,USA,USA,102,88,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSAJE,USAFL,USAJE,USA,USA,766,121,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSASM,USAFL,USASM,USA,USA,518,1178,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSASO,USAFL,USASO,USA,USA,812,1294,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFLUSATC,USAFL,USATC,USA,USA,283,547,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFMUSAJE,USAFM,USAJE,USA,USA,23,75,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAFMUSATC,USAFM,USATC,USA,USA,129,459,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGCUSAPI,USAGC,USAPI,USA,USA,16,317,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGCUSAPW,USAGC,USAPW,USA,USA,219,62,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGDUSAPN,USAGD,USAPN,USA,USA,495,5,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGDUSASR,USAGD,USASR,USA,USA,683,3,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGFUSAWC,USAGF,USAWC,USA,USA,567,3,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGLUSALG,USAGL,USALG,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGLUSAMI,USAGL,USAMI,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAGWUSANW,USAGW,USANW,USA,USA,190,4,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAHGUSASR,USAHG,USASR,USA,USA,972,5,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAHGUSAWC,USAHG,USAWC,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAIIUSAWC,USAII,USAWC,USA,USA,75,69,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAIPUSANE,USAIP,USANE,USA,USA,254,185,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAIPUSANW,USAIP,USANW,USA,USA,0,18,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAIPUSAPE,USAIP,USAPE,USA,USA,637,1682,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAIPUSAPW,USAIP,USAPW,USA,USA,973,774,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAISUSANY,USAIS,USANY,USA,USA,896,1518,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAJEUSASM,USAJE,USASM,USA,USA,105,67,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALDUSANE,USALD,USANE,USA,USA,1383,406,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALDUSAPE,USALD,USAPE,USA,USA,385,465,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALDUSAWC,USALD,USAWC,USA,USA,389,1760,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALGUSAMI,USALG,USAMI,USA,USA,654,670,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALGUSAPJ,USALG,USAPJ,USA,USA,698,626,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSALGUSATV,USALG,USATV,USA,USA,220,598,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAMIUSAPJ,USAMI,USAPJ,USA,USA,10137,9701,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAMIUSASO,USAMI,USASO,USA,USA,415,1013,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAMIUSASP,USAMI,USASP,USA,USA,93,509,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAMIUSASW,USAMI,USASW,USA,USA,1311,1201,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAMIUSATV,USAMI,USATV,USA,USA,2930,2266,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ,- TRNUSAMIUSAWA,USAMI,USAWA,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANEUSAPE,USANE,USAPE,USA,USA,249,499,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANEUSAWC,USANE,USAWC,USA,USA,814,842,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANWUSAPE,USANW,USAPE,USA,USA,299,303,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANWUSAWA,USANW,USAWA,USA,USA,194,126,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANWUSAWM,USANW,USAWM,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANWUSAWW,USANW,USAWW,USA,USA,4,178,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSANYUSAPJ,USANY,USAPJ,USA,USA,2477,3260,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPEUSAPW,USAPE,USAPW,USA,USA,1307,1307,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPEUSAWC,USAPE,USAWC,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPEUSAWM,USAPE,USAWM,USA,USA,452,986,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPGUSAPW,USAPG,USAPW,USA,USA,166,142,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPIUSASL,USAPI,USASL,USA,USA,165,130,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPIUSATR,USAPI,USATR,USA,USA,33,73,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPJUSATV,USAPJ,USATV,USA,USA,1471,1532,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPNUSAPO,USAPN,USAPO,USA,USA,0,169,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPNUSASW,USAPN,USASW,USA,USA,111,121,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPNUSATP,USAPN,USATP,USA,USA,437,281,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPNUSAWC,USAPN,USAWC,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPNUSAWM,USAPN,USAWM,USA,USA,407,337,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPOUSASW,USAPO,USASW,USA,USA,195,199,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAPOUSAWM,USAPO,USAWM,USA,USA,748,1092,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASAUSASC,USASA,USASC,USA,USA,361,252,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASAUSASG,USASA,USASG,USA,USA,62,55,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASAUSASO,USASA,USASO,USA,USA,513,111,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASCUSASG,USASC,USASG,USA,USA,295,1075,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ,- TRNUSASCUSASO,USASC,USASO,USA,USA,277,819,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ,- TRNUSASGUSASO,USASG,USASO,USA,USA,81,1036,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASLUSATR,USASL,USATR,USA,USA,0,0,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASMUSATC,USASM,USATC,USA,USA,368,258,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASOUSATA,USASO,USATA,USA,USA,164,38,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASOUSATV,USASO,USATV,USA,USA,1114,1499,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASPUSASW,USASP,USASW,USA,USA,472,239,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASRUSATP,USASR,USATP,USA,USA,759,803,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASRUSAWC,USASR,USAWC,USA,USA,255,654,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASWUSAWA,USASW,USAWA,USA,USA,178,139,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSASWUSAWM,USASW,USAWM,USA,USA,338,198,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSATPUSAWC,USATP,USAWC,USA,USA,62,274,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAWAUSAWM,USAWA,USAWM,USA,USA,109,48,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNUSAWCUSAWM,USAWC,USAWM,USA,USA,90,500,-,-,https://www.eia.gov/electricity/gridmonitor/about,-,Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.,- TRNVNMCEVNMNO,VNMCE,VNMNO,VNM,VNM,2200,2200,-,-,https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx,-,-,- TRNVNMCEVNMSO,VNMCE,VNMSO,VNM,VNM,12000,7500,-,-,https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx,-,-,- TRNZAFXXZWEXX,ZAFXX,ZWEXX,ZAF,ZWE,15,15,400,320,https://www.sciencedirect.com/science/article/pii/S254243512200304X?via%3Dihub#da0010,https://map.au-pida.org/projects/show/10310001,-,- TRNZMBXXZWEXX,ZMBXX,ZWEXX,ZMB,ZWE,1400,1400,330,-,https://www.sapp.co.zw/interconnectors,-,-,-