Dataset Open Access

CSP.guru 2022-07-01

Richard Thonig; Johan Lilliestam

This version of CSP.guru has been compiled by Richard Thonig and Johan Lilliestam in collaboration with the SolarPACES secretariat and reflects the CSP market in the middle of 2022. The Chinese market develops favorably with many new projects announced to be completed by 2024. At the end of 2021, the Chinese beam-down tower project was finished with 5 out of 15 initially planned towers completed.
Staying conservative we continue to include only those projects that can be verified as under construction. In South Africa Redstone is finally under construction. Moreover, several pilot stations moved forward. We deleted three plants because we couldn't verify that they are under construction or will still be completed after the Chinese Feed-in-Tariff ran out at the end of 2021, those are: OpenCSP_ID 132,133,134 "Shenzhen Jinfan Akesai - 50MW Molten Salt Trough", "Shouhang Yumen 100 MW Tower", "Supcon Delingha 135 MW Tower".

Files (126.1 kB)
Name Size
repolicy/csp-guru-2022-07-01.zip
md5:5b758414498c2ba1a09bbf9f84b5b557
126.1 kB Download
4,109
2,388
views
downloads
All versions This version
Views 4,10980
Downloads 2,38826
Data volume 187.2 MB3.3 MB
Unique views 3,37863
Unique downloads 2,19226

Share

Cite as