Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published August 4, 2016 | Version v1
Technical note Open

I-ImaS (WP3): Preliminary Analysis Report and Proposed Design

  • 1. DIT-NKUA

Description

Technical report, draft/unofficial version, 02-Mar-2004.

Notes

Published as open-access after the expiration of the IPR protection period.

Files

I-ImaS_prelim_rep_final3.pdf

Files (518.2 kB)

Name Size Download all
md5:fce1a124a57a61129bba99a39d647d85
518.2 kB Preview Download