Journal article Open Access

Behaviour Analysis of Alloy Wheel Plant

Rajbala; Deepika Garg


JSON-LD (schema.org) Export

{
  "inLanguage": {
    "alternateName": "eng", 
    "@type": "Language", 
    "name": "English"
  }, 
  "about": [
    {
      "@id": "", 
      "@type": "CreativeWork"
    }, 
    {
      "@id": "https://hdl.handle.net/B3104129219/2019\u00a9BEIESP", 
      "@type": "CreativeWork"
    }
  ], 
  "description": "<p>In this paper, Behaviour Analysis of an Alloy Wheel Plant utilizing RPGT under specific conditions has been discussed. An Alloy Wheel Plant is isolated into five sub- systems P, Q, R, S and T for instances of computations. An Alloy Wheel Plant consists of five frame woks for example Gravity Die Machine (P), Cutting Machine (Q), Solutiuonizing Chamber Machine (R), Azing Chamber Machine(S) and Shot Blasting Machine (T). These subsystems are associated in arrangement. On the off chance that any of the sub units comes up short, at that point the Alloy Wheel plant works in diminished state. In the event that at least two sub units fall flat, at that point systems comes up short. Parametric estimations of a system generally rely upon failure / repair rate of individual units. Single server fixes all sub-units. Framework parameters, for example, Availability, MTSF and Number of Server&rsquo;s Visits utilizing RPGT are determined. Specific cases and behaviour analysis w.r.t different rates are additionally completed pursue by graphs.</p>", 
  "license": "https://creativecommons.org/licenses/by/4.0/legalcode", 
  "creator": [
    {
      "affiliation": "School of Basic and Applied Science, G.D. Goenka University  (Gurgaon), Gurgaon, India", 
      "@type": "Person", 
      "name": "Rajbala"
    }, 
    {
      "affiliation": "School of Basic and Applied Science, G.D. Goenka University  (Gurgaon), Gurgaon, India", 
      "@type": "Person", 
      "name": "Deepika Garg"
    }
  ], 
  "headline": "Behaviour Analysis of Alloy Wheel Plant", 
  "image": "https://zenodo.org/static/img/logos/zenodo-gradient-round.svg", 
  "datePublished": "2019-12-30", 
  "keywords": [
    "Availability, busy- period of repairman, Behaviour Analysis"
  ], 
  "url": "https://zenodo.org/record/5599202", 
  "contributor": [
    {
      "affiliation": "Publisher", 
      "@type": "Person", 
      "name": "Blue Eyes Intelligence Engineering  & Sciences Publication (BEIESP)"
    }
  ], 
  "@context": "https://schema.org/", 
  "identifier": "https://doi.org/10.35940/ijeat.B3104.129219", 
  "@id": "https://doi.org/10.35940/ijeat.B3104.129219", 
  "@type": "ScholarlyArticle", 
  "name": "Behaviour Analysis of Alloy Wheel Plant"
}
13
17
views
downloads
Views 13
Downloads 17
Data volume 19.7 MB
Unique views 13
Unique downloads 16

Share

Cite as