Journal article Open Access
G. Dhanasekar; A. Sivakumar; L. Madhumitha; P. Karthikeyan
{ "DOI": "10.35940/ijeat.C5411.029320", "container_title": "International Journal of Engineering and Advanced Technology (IJEAT)", "language": "eng", "title": "Effective Selection of Resources for Construction using Program Tool", "issued": { "date-parts": [ [ 2020, 2, 29 ] ] }, "abstract": "<p>In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper's objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.</p>", "author": [ { "family": "G. Dhanasekar" }, { "family": "A. Sivakumar" }, { "family": "L. Madhumitha" }, { "family": "P. Karthikeyan" } ], "page": "2927-2931", "volume": "9", "type": "article-journal", "issue": "3", "id": "5589267" }
Views | 35 |
Downloads | 16 |
Data volume | 11.7 MB |
Unique views | 32 |
Unique downloads | 16 |