Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published September 24, 2021 | Version v1
Conference paper Open

SCHEDULING OF WASTE WOOD PROCESSING FACILITIES WITH OVERLAPPING JOBS

  • 1. InnoRenew CoE; University of Primorska
  • 2. Department of Information Technology, Széchenyi István University
  • 3. Institute of Informatics and Mathematics, University of Sopron

Description

An important phase in most waste wood value chains is the processing of bulk waste from various sources, usually by means of shredding. This paper presents a method for scheduling the machines in such a waste wood processing facility, where incoming deliveries of different types of wood are processed by a series of treatment and transformation steps to produce shredded wood. A mathematical model is presented for the problem, that allows overlaps between consecutive steps to optimize resource flow through the system. The efficiency of the model is presented on randomly generated instances.

Notes

Pages 321-326

Files

Scheduling.pdf

Files (10.6 MB)

Name Size Download all
md5:8abb49a8279c066a10901f9d2adb8f74
10.6 MB Preview Download

Additional details

Identifiers

ISBN
978-961-6165-57-0

Funding

InnoRenew CoE – Renewable materials and healthy environments research and innovation centre of excellence 739574
European Commission