Conference paper Open Access
Balázs Dávid; Olivér Ősz; Máté Hegyháti
An important phase in most waste wood value chains is the processing of bulk waste from various sources, usually by means of shredding. This paper presents a method for scheduling the machines in such a waste wood processing facility, where incoming deliveries of different types of wood are processed by a series of treatment and transformation steps to produce shredded wood. A mathematical model is presented for the problem, that allows overlaps between consecutive steps to optimize resource flow through the system. The efficiency of the model is presented on randomly generated instances.
Name | Size | |
---|---|---|
Scheduling.pdf
md5:8abb49a8279c066a10901f9d2adb8f74 |
10.6 MB | Download |
All versions | This version | |
---|---|---|
Views | 44 | 44 |
Downloads | 38 | 38 |
Data volume | 401.2 MB | 401.2 MB |
Unique views | 36 | 36 |
Unique downloads | 34 | 34 |