Project deliverable Open Access

Risk register system and procedures (D7.2)

Bearzotti, Chiara; Olsen, Steffen


JSON Export

{
  "files": [
    {
      "links": {
        "self": "https://zenodo.org/api/files/62856510-ff59-46d8-b66b-f78050ce5c7b/D7.2-FINAL.pdf"
      }, 
      "checksum": "md5:efc0293d4e1d3557eda518e520fd8c6c", 
      "bucket": "62856510-ff59-46d8-b66b-f78050ce5c7b", 
      "key": "D7.2-FINAL.pdf", 
      "type": "pdf", 
      "size": 258268
    }
  ], 
  "owners": [
    29385
  ], 
  "doi": "10.5281/zenodo.495396", 
  "stats": {
    "version_unique_downloads": 156.0, 
    "unique_views": 93.0, 
    "views": 99.0, 
    "version_views": 99.0, 
    "unique_downloads": 156.0, 
    "version_unique_views": 93.0, 
    "volume": 41581148.0, 
    "version_downloads": 161.0, 
    "downloads": 161.0, 
    "version_volume": 41581148.0
  }, 
  "links": {
    "doi": "https://doi.org/10.5281/zenodo.495396", 
    "latest_html": "https://zenodo.org/record/495396", 
    "bucket": "https://zenodo.org/api/files/62856510-ff59-46d8-b66b-f78050ce5c7b", 
    "badge": "https://zenodo.org/badge/doi/10.5281/zenodo.495396.svg", 
    "html": "https://zenodo.org/record/495396", 
    "latest": "https://zenodo.org/api/records/495396"
  }, 
  "created": "2017-04-06T12:42:44.265750+00:00", 
  "updated": "2020-01-20T17:17:38.218785+00:00", 
  "conceptrecid": "795106", 
  "revision": 6, 
  "id": 495396, 
  "metadata": {
    "access_right_category": "success", 
    "doi": "10.5281/zenodo.495396", 
    "description": "<p><strong>About this document</strong><br>\nDeliverable: D7.2<br>\nWork package in charge: WP7 Management<br>\nActual delivery date for this deliverable: Project\u2010month 3<br>\nDissemination level: The general public (PU)</p>\n\n<p><strong>Summary</strong></p>\n\n<p>This deliverable aims at ensuring a smooth coordination of the project for a high quality of results and implementation. This deliverable describes the participatory process conducted within the consortium to identify the risks that might occur during the project implementation. Such risks are related to three main activities: i) research and innovation, ii) management, and iii) dissemination and exploitation of results. The coordination and the project office have set up a risk management system with procedures for tracking foreseen and unforeseen risks, and implementing adequate corrective and mitigation measures. A risk register is thoroughly applied throughout the project life cycle to keep track of materialized and potential risks and applied corrective and preventive measures.</p>", 
    "license": {
      "id": "CC-BY-4.0"
    }, 
    "title": "Risk register system and procedures (D7.2)", 
    "notes": "We support the Blue Growth!\nVisit us on: www.blue\u2010action.eu\nFollow us on Twitter: @BG10Blueaction", 
    "relations": {
      "version": [
        {
          "count": 1, 
          "index": 0, 
          "parent": {
            "pid_type": "recid", 
            "pid_value": "795106"
          }, 
          "is_last": true, 
          "last_child": {
            "pid_type": "recid", 
            "pid_value": "495396"
          }
        }
      ]
    }, 
    "communities": [
      {
        "id": "blue-actionh2020"
      }
    ], 
    "keywords": [
      "coordination", 
      "risk management", 
      "foreseen risks", 
      "unforeseen risks", 
      "corrective measures", 
      "mitigation measures", 
      "project life cycle", 
      "Blue-Action"
    ], 
    "publication_date": "2017-04-06", 
    "creators": [
      {
        "affiliation": "DMI", 
        "name": "Bearzotti, Chiara"
      }, 
      {
        "affiliation": "DMI", 
        "name": "Olsen, Steffen"
      }
    ], 
    "access_right": "open", 
    "resource_type": {
      "subtype": "deliverable", 
      "type": "publication", 
      "title": "Project deliverable"
    }
  }
}
99
161
views
downloads
All versions This version
Views 9999
Downloads 161161
Data volume 41.6 MB41.6 MB
Unique views 9393
Unique downloads 156156

Share

Cite as