Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.

There is a newer version of the record available.

Published May 26, 2021 | Version v2
Report Open

IEA Wind TCP Task 29, Phase IV: Detailed Aerodynamics of Wind Turbines

Description

This report describes the results of the fourth phase of IEA TCP Wind Task 29  on wind turbine aerodynamics. 

Files

Final_report_Task29_May26_with_cover.pdf

Files (33.4 MB)

Name Size Download all
md5:31416dfada7b823a48883cec018448ab
33.4 MB Preview Download