Journal article Open Access

The FlexPlan Approach to Include the Contribution of Storage and Flexible Resources in Grid Planning

Gianluigi Migliavacca; Marco Rossi; Dario Siface; Matteo Marzoli; Hakan Ergun; Raul Rodriguez; Guillaume Leclerq; Nuno Amaro; Björn Matthes; Jawana Gabrielski; Andrei Morch


Citation Style Language JSON Export

{
  "publisher": "Zenodo", 
  "DOI": "10.5281/zenodo.4017489", 
  "author": [
    {
      "family": "Gianluigi Migliavacca"
    }, 
    {
      "family": "Marco Rossi"
    }, 
    {
      "family": "Dario Siface"
    }, 
    {
      "family": "Matteo Marzoli"
    }, 
    {
      "family": "Hakan Ergun"
    }, 
    {
      "family": "Raul Rodriguez"
    }, 
    {
      "family": "Guillaume Leclerq"
    }, 
    {
      "family": "Nuno Amaro"
    }, 
    {
      "family": "Bj\u00f6rn Matthes"
    }, 
    {
      "family": "Jawana Gabrielski"
    }, 
    {
      "family": "Andrei Morch"
    }
  ], 
  "issued": {
    "date-parts": [
      [
        2020, 
        9, 
        2
      ]
    ]
  }, 
  "abstract": "<p>This paper describes the main features of the<br>\nnew European research project FlexPlan. This project aims at<br>\nestablishing a new grid planning methodology considering the<br>\nopportunity to introduce new storage and flexibility resources<br>\nin electricity transmission and distribution grids as an<br>\nalternative to building new grid elements. FlexPlan will create<br>\na new innovative grid planning tool whose ambition is to go<br>\nbeyond the state of the art of planning methodologies, by<br>\nincluding the following innovative features: integrated<br>\ntransmission distribution planning, inclusion of environmental<br>\nanalysis, probabilistic contingency methodologies replacing the<br>\nN-1 criterion as well as optimal planning decision over several<br>\ndecades. Then, the new tool will be used to analyse six regional<br>\ncases covering nearly the whole European continent, aimed at<br>\ndemonstrating the application of the tool on real scenarios as<br>\nwell as at casting a view on grid planning in Europe till 2050.<br>\nIn this way, the FlexPlan project will try to answer the<br>\nquestion of which role flexibility could play and how its usage<br>\ncan contribute to reduce planning investments yet maintaining<br>\ncurrent system security levels. The project will end up<br>\nformulating guidelines for regulators and planning offices of<br>\nsystem operators.</p>", 
  "title": "The FlexPlan Approach to Include the Contribution of Storage and Flexible Resources in Grid Planning", 
  "type": "article-journal", 
  "id": "4017489"
}
153
159
views
downloads
All versions This version
Views 153153
Downloads 159159
Data volume 83.6 MB83.6 MB
Unique views 141141
Unique downloads 148148

Share

Cite as