Rodolphe Legouable
Anne Marrec
Sofiane Imadali
Emmanuel Gouleau
Malika Djabali
Catalin Brezeanu
Jaime Garcia-Reinoso
Pablo Serrano
Winnie Nakimuli
Silvia Canale
Graziano Ciucciarelli
Gerardo Corsaletti
Vincenzo Suraci
Albino Penna
Gabriel Petersen
Marco Tognaccini
Elian Kraja
Gino Carrozzo
Leonardo Agueci
Ramón Pérez
Antonio Cobos
Lourdes María de Pedro
Fernando Beltrán
Diego San Cristóbal
Isaac Quintana
Manuel Lorenzo
Miguel Ángel Martínez
Vincent Audebert
Amine Abouliatim
Laurent Roullet
Emmanouil Paraskevakis
Georgios Sextos
Claudio Casetti
Paolo Giaccone
Matteo Pergolesi
Cristina Rottondi
Andrea Bianco
V. Foteinos
P. Vlacheas
I. Stenos
K. Trichias
V. Laskaridis
E. Giannopoulos
I. Dimitriadis
P. Dimiropoulou
V. Stavroulaki
I. Belikaidis
A. Georgakopoulos
A. Badouna
Federico Álvarez, Alberto del Río
David Jiménez
Javier Serrano
Juan Rodríguez
Lourdes Luque
Luis Miguel Contreras
Konstantinos Kravariotis
Evangelos Kakkavas
Jaime Ruiz
Ignacio Benito
Ignacio Berberana
Neftali Gonzalez
Sergio Morant
2020-07-15
<p>The present deliverable is the Initial report about the first functional tests and 5G end to end facility validation. It provides the overall situation of the E2E facility implementation status corresponding to the project’s MS9 Second release of the 5G end to end facility in M24. Special attention has been paid to the 5G infrastructure performance metrics.<br>
The document also goes through all the 5G EVE pilots providing detailed information about the activities performed in the scope of 5G EVE project since last year, their implementation and integration status in the E2E site facility, and the roadmap for activities in the upcoming months. Although the obvious impact of the COVID19 on the Use Cases and Pilots deployments and executions, mostly related to the activities that needed a physical access to the facilities, the consortium has made a big effort to preserve the original roadmap. This has allowed to reach a good level of integration with the 5G EVE platform and to collect preliminary results on the Use Cases’ services.<br>
The last topic covered by the deliverable describes the methodology that has been implemented to provide support to the pilot Use Cases to carry out the Experimentation flow activities as described in D1.3 - 5G EVE end-to-end facility reference architecture for Vertical industries and core applications [3].<br>
This deliverable should provide future 5G EVE experimenters with all the available information to carry out experimentation within 5G EVE E2E facility, including the Blueprints used to instantiate the experiments of the 5G EVE internal Use Cases and the methodology to go through the integration process.</p>
https://doi.org/10.5281/zenodo.3946365
oai:zenodo.org:3946365
Zenodo
https://zenodo.org/communities/5g-ppp
https://zenodo.org/communities/eu
https://doi.org/10.5281/zenodo.3946364
info:eu-repo/semantics/openAccess
Creative Commons Attribution 4.0 International
https://creativecommons.org/licenses/by/4.0/legalcode
D2.4 Initial pilot test and validation
info:eu-repo/semantics/report