Published April 20, 2020
| Version v1
Report
Open
D-JRP26 WP1.1 detailed workplan ADONIS
Creators
- 1. RIVM
- 2. PIWET
- 3. SSI
- 4. UCM-VISAVET
- 5. ANSES
- 6. Sciensano
- 7. Institute Pasteur
Description
During the kick-off meeting of ADONIS detailed work plans were made and captured in so-called X-matrices for each WP where higher goals, approaches and concrete actions are linked.
Files
Files
(654.5 kB)
Name | Size | Download all |
---|---|---|
md5:50361c1837d754d15efb7e6a70ee57dd
|
255.8 kB | Download |
md5:cd38166d6ea59e7991fc06bd8b9ed5bc
|
398.7 kB | Download |