There is a newer version of this record available.

Working paper Open Access

On Board Procedure to 5G PPP Infrastructure Projects

Kaloxylos, Alexandros; Diaz Zayas, Almudena; García Reinoso, Jaime; Gavras, Anastasius; Landi, Giada; Lorenzo, Manuel; Mahmood, Kashif; Merino Gomez, Pedro; Ordonez Lucena, Jose Antonio; Tranoris, Christos; Tsolkas, Dimitris

This white paper describes the basic procedures that must be followed when vertical sector oriented projects of the 5G PPP plan to use the 5G PPP infrastructure project services. For each of the infrastructure projects this paper informs - among others - about how to interact with the infrastructure, what information is needed for running experiments, what output and how is provided, as well as what are the future plans of each infrastructure project for the longer term support of vertical applications.

Files (1.6 MB)
Name Size
On Board Procedure to 5G PPP Infrastructure Projects.pdf
md5:edb3408b61c8b8b104e4012b34d8410f
1.6 MB Download
132
80
views
downloads
All versions This version
Views 13262
Downloads 8030
Data volume 265.1 MB47.2 MB
Unique views 12062
Unique downloads 7026

Share

Cite as