Dominik MILDT
Marco CUPELLI
Antonello MONTI
Julien BRUSCHI
Thibault WAGNER
Christian DUMBS
2019-06-03
<p>In the course ofthe 2020 Horizon project InterFlex,French distribution system operator(DSO)ENEDIS is building Nice Smart Valley, a demonstratorto test innovative solutions for distribution systems.In their first use case,the network of the Lérins’ islandsis equippedwith a variety of distributed energy resources (DERs) to investigate the combination of local storage systems and renewable generation, with specific focus on the temporary operation asafully autonomous island. This paper presents the application of apreviously developed model predictive control (MPC) based energy management system (EMS) to the demonstrator network under construction. Simulations show how the DERs can be used for different objectives like collective self-consumptionandmaximization of potential islanding time (PIT).</p>
https://doi.org/10.5281/zenodo.3567893
oai:zenodo.org:3567893
eng
Zenodo
https://zenodo.org/communities/eu
https://doi.org/10.5281/zenodo.3567892
info:eu-repo/semantics/openAccess
Creative Commons Attribution 4.0 International
https://creativecommons.org/licenses/by/4.0/legalcode
25th International Conference on Electricity Distribution, Cired 2019, Madrid, Spain, June 2019
Distributed Energy Resources, Islanding, Model Predictive Control
A STUDY OF MODEL PREDICTIVE CONTROL APPLIED TO THE FRENCH DEMO OF INTERFLEX
info:eu-repo/semantics/conferencePaper