Conference paper Open Access

Rescheduling and co-simulation of a multi-period multi-model assembly line with material availability restrictions

Gregory A. Kasapidis; Yiannis Mourtos; Panagiotis P. Repoussis; Sven Spieckermann; Christos D. Tarantilis


BibTeX Export

@proceedings{gregory_a_kasapidis_2019_3522108,
  title        = {{Rescheduling and co-simulation of a multi-period 
                   multi-model assembly line with material
                   availability restrictions}},
  year         = 2019,
  publisher    = {Zenodo},
  month        = aug,
  doi          = {10.5281/zenodo.3522108},
  url          = {https://doi.org/10.5281/zenodo.3522108}
}
60
40
views
downloads
All versions This version
Views 6060
Downloads 4040
Data volume 4.2 MB4.2 MB
Unique views 5757
Unique downloads 3838

Share

Cite as