Project deliverable Open Access

D6.1 Scenario Implementation

John Cosmas; Ben Meunier; Nawar Jawad; Kareem Ali; Mathias Lacaud; Charilaos Zarakovitis; Sibel Malkos; Silvia de la Orden Rodriguez; Yoav Avinoam; Moshe Ran

This deliverable provides a description of the application layer software developed so far in the project for the implementation of the project scenarios and the Key Performance Indicators (KPIs) that each application requires from the IoRL system. Further application layer software may be developed during the rest of the project and will be reported in an updated version of this deliverable. It also provides the initial designs of the light systems that are required for each project scenario. Finally, it describes the equipment, system diagrams and costs of the laboratory test bench systems that will be constructed by each of the technology development partners and the target demonstrator scenario platforms. It explains what sharing of equipment is required between platforms to support each target demonstrator scenario platform.

Files (4.7 MB)
Name Size
D6.1 Scenario Implementation.pdf
md5:2f4ded3abb172fe4d7ce7e65b2eb5456
4.7 MB Download
9
12
views
downloads
All versions This version
Views 99
Downloads 1212
Data volume 56.7 MB56.7 MB
Unique views 99
Unique downloads 99

Share

Cite as