Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published September 16, 2019 | Version v1
Project deliverable Open

D5.1 Pilot operation plan - First and Second Phase

Creators

  • 1. CCMA

Description

This document defines the pilot operation plan describing the strategy for the operational phase of the platform, tools and access services developed in the Immersive Accessibility (ImAc) project. It defines which service components need to be integrated for their evaluation through a set of pilot actions in Spain, Germany and England. In order to feed the pilots, immersive media is produced and enriched with accessibility content using the editing tools developed in the project’s scope.
This is the second and final iteration of D5.1. The first version, delivered in M07, was focused on the pilot phase 1 and describes a set of closed pilot actions aiming to gather feedback to improve the ImAc access services and tools. This final version is enhanced with updates from the already executed pilot phase 1 and a detailed planning of pilot phase 2, which includes some open pilot actions. Ref. Ares(2019)5088434 - 05/08/2019

Files

D5.1.pdf

Files (1.3 MB)

Name Size Download all
md5:cce427a0daf2b57a3a79464eac9ede9a
1.3 MB Preview Download

Additional details

Funding

ImAc – Immersive Accessibility 761974
European Commission