Conference paper Open Access

The 5G EVE End-to-End 5G Facility for Extensive Trials

Milon Gupta; Rodolphe Legouable; Marc Molla Rosello; Maurizio Cecchi; Jaime Ruiz Alonso; Manuel Lorenzo; Evangelos Kosmatos; Mauro R. Boldi; Gino Carrozzo


JSON-LD (schema.org) Export

{
  "inLanguage": {
    "alternateName": "eng", 
    "@type": "Language", 
    "name": "English"
  }, 
  "description": "<p>The challenge before reaching the production stage for 5G is to assess its performance in large-scale facilities. EU-funded 5G PPP project 5G EVE is addressing this challenge by building a distributed and interworking 5G end-to-end facility in Europe across various sites. In this paper we explain the architecture of the 5G EVE end-to-end facility and present each site with their respective features, including the interworking among them, which provides a clear add-on to country-based trials. The 5G EVE site facilities are designed to offer automated network slice deployment tools and a new validation framework. This framework will offer tools for testing 5G radio and various core solutions. It will also allow experimenting and benchmarking different classes of end-to-end network slices and services. These services are defined by a set of selected vertical use cases in sectors like energy, transport, smart cities, tourism, and manufacturing (Industry 4.0). 5G EVE&rsquo;s large-scale trials are being deployed in four European countries: Italy, France, Spain, and Greece.</p>", 
  "license": "", 
  "creator": [
    {
      "affiliation": "Eurescom GmbH", 
      "@type": "Person", 
      "name": "Milon Gupta"
    }, 
    {
      "affiliation": "Orange SA", 
      "@type": "Person", 
      "name": "Rodolphe Legouable"
    }, 
    {
      "affiliation": "Ericsson Spain", 
      "@type": "Person", 
      "name": "Marc Molla Rosello"
    }, 
    {
      "affiliation": "Associazione PIIU", 
      "@type": "Person", 
      "name": "Maurizio Cecchi"
    }, 
    {
      "affiliation": "Nokia Spain SA, Nokia Bell Labs", 
      "@type": "Person", 
      "name": "Jaime Ruiz Alonso"
    }, 
    {
      "affiliation": "Ericsson Spain", 
      "@type": "Person", 
      "name": "Manuel Lorenzo"
    }, 
    {
      "affiliation": "WINGS ICT Solutions", 
      "@type": "Person", 
      "name": "Evangelos Kosmatos"
    }, 
    {
      "affiliation": "TIM S.p.A.", 
      "@type": "Person", 
      "name": "Mauro R. Boldi"
    }, 
    {
      "affiliation": "Nextworks", 
      "@type": "Person", 
      "name": "Gino Carrozzo"
    }
  ], 
  "headline": "The 5G EVE End-to-End 5G Facility for Extensive Trials", 
  "image": "https://zenodo.org/static/img/logos/zenodo-gradient-round.svg", 
  "citation": [
    {
      "@id": "https://ieeexplore.ieee.org/document/8757139", 
      "@type": "CreativeWork"
    }
  ], 
  "datePublished": "2019-07-11", 
  "url": "https://zenodo.org/record/3366870", 
  "version": "Accepted Version", 
  "@type": "ScholarlyArticle", 
  "keywords": [
    "5G experimental validation", 
    "5G KPIs", 
    "5G trials", 
    "end-to-end facilityend-to-end facility", 
    "interworking", 
    "orchestration", 
    "vertical industries"
  ], 
  "@context": "https://schema.org/", 
  "identifier": "https://doi.org/10.1109/ICCW.2019.8757139", 
  "@id": "https://doi.org/10.1109/ICCW.2019.8757139", 
  "workFeatured": {
    "alternateName": "ICC", 
    "location": "Shanghai, China", 
    "@type": "Event", 
    "name": "2019 IEEE International Conference"
  }, 
  "name": "The 5G EVE End-to-End 5G Facility for Extensive Trials"
}
106
142
views
downloads
Views 106
Downloads 142
Data volume 49.6 MB
Unique views 101
Unique downloads 132

Share

Cite as