Monitoring reports of pilot cases
Creators
- Lorenzo BONO1
- Laura ANDREAZZOLI1
- Yoann BILLON2
- Busch Thomsen Birte3
- Rute CARVALHO4
- Alberto CLAVIJO5
- Mattias ERIKSSON6
- Paraskevi GIOURKA7
- Sebastian GOLLNOW8
- Lorella LENTUCCI9
- Javier LÓPEZ-MURCIA10
- Celia GILSANZ11
- Gerardo GONZALEZ12
- Alejandro MOLOWNY13
- Maxime KAYADJANIAN14
- Gisela Nascimento15
- Gudrun OBERSTEINER8
- Iva POZNIAK16
- Barbara SARNARI1
- Emma SCHEMBARI17
- Maria THISEOS18
- 1. Ambiente Italia
- 2. MCNA
- 3. City of Copenhagen
- 4. Lisbon Municipality
- 5. ULPGC
- 6. Swedish University of Agricultural Science (SLU)
- 7. DIAAMATH SA
- 8. Universität für Bodenkultur Wien (BOKU)
- 9. Tuscany Region
- 10. Consulta Europa
- 11. Santander Municipality
- 12. Bioazul
- 13. Cabildo de Tenerife
- 14. IAU-ÎDF
- 15. Fundo Regional para a Ciência e Tecnologia
- 16. DUNEA
- 17. Siracusa Municipality
- 18. Nicosia Municipality
Description
The objective of the work package 6 is the testing of the waste prevention and management strategies identified in the 11 pilot cities/regions, according to Participatory process through the Communities of Practice developed in WP3 and engaging local stakeholders in the waste management strategies implementation.
The measures implementing these strategies have been developed, on average, for 4-6 months, starting in May-June and ending in October-November 2018. All the pilot areas implemented from 3 to 5 measures and promoted and tested the WasteApp developed in WP5 for all the implementation phase, as an important tool of the overall communication campaign enhanced at the local level to promote the URBAN-WASTE measures.
These measures covered various topics such as prevention, reuse, and waste collection, sorting and recycling. This report is divided into 11 different reports, one for each pilot city/region, where detailed information regarding stakeholders involved, timing of the implementation, activities performed, results achieved, challenges faces and lessosn learnt from each strategy implemented and tested is included.
The results obtained in this phase will set the basis for the work developed in WP7 on the impact assessment and explotation of results.
Files
D6.2 - Monitoring reports of pilots.pdf
Files
(15.4 MB)
Name | Size | Download all |
---|---|---|
md5:03c7e3205307abeb8151b8a1242bd722
|
15.4 MB | Preview Download |